RussianPatents.com

Method for motor road and aerodrome base construction

Method for motor road and aerodrome base construction
IPC classes for russian patent Method for motor road and aerodrome base construction (RU 2317364):

E01C7/18 - of road-metal and bituminous binders
E01C3 - Structure of roads, playgrounds, sports grounds, airfields
Another patents in same IPC classes:
Method for cracked paved surface repair Method for cracked paved surface repair / 2306380
Method involves laying reinforcing mat over crack; fastening reinforcing mat to paved surface from one crack side by applying adhesive on reinforcing mat surface and on paved surface or only on paved surface in crack area; pressing reinforcing mat to paved surface or adhesive correspondingly; leaving unsecured mat as it is from opposite crack side; laying paving material onto reinforcing mat. Reinforcing mat is formed of non-woven web including mineral and polymeric fiber mix.
Method for reinforcement of road pavement / 2301292
Method involves providing hot regeneration process by heating top layer of existing asphalt-concrete pavement through 3-5 cm depth; mellowing said layer by cutting; introducing into ground heated material novel mixture of porous or high-porous asphalt-concrete in an amount needed for leveling and reinforcing; mixing said components; distributing mixture; applying thereon novel mixture for high-density or dense asphalt-concrete in 2-5 cm thick layer; providing joint compaction of both layers.
Method of reconditioning of road pavement layers / 2271415
Invention relates to road building and repairing and it can be used at repeated use of old asphalt-concrete coating. According to proposed method of reconditioning of layers of road pavement coming to loosening of layers by milling, delivering of binder and water into milled material, mixing of components and distributing and compacting the mixture, layer obtained after compacting is heated to depth of 3-5 cm and loosened to said depth after which mixture is distributed and compacted.
Road structure Road structure / 2312181
Road structure has pavement with underlying layer, road bed reinforced with binding agent and water-proofing shell. The water-proofing shell has lower part inclined from embankments to road bed axis. Road structure also has gap for water discharge from shell into underlying draining layer located under road bed. Water-proofing shell and draining layer are made of soil reinforced with binding material, for instance with oil. Upper part of strengthened shell is used as paving underlayer.
Road paving structure Road paving structure / 2310031
Paving comprises bed of overconsolidated soil having compacting factor Kc=1.02-1.02 and double asphalt concrete covering. Bed has width 20-25 cm narrower than that of paving from each paving side and is provided with bearing compacted crushed stone layer having width of 40-50 cm and arranged from each paving side. The crushed stone layer extends for the full bed depth. Double asphalt concrete covering spans the full paving width.
Cellular structure Cellular structure / 2303677
Plastic netting comprises oriented strips 6, 9, which form triangular cells so that strips are connected with each other in connection points 11. Six strips 6, 9 converge at each connection point 11. Plastic source material has orifices defining hexagon grid array so that opposite orifices of each hexagon are aligned in processing direction. Source material is preliminarily expanded in processing direction and in transversal direction. Ready ground consolidation netting 10 has hexagon centers, which create connection points 11. Connection point 11 centers are slightly biaxially oriented, but edge of each strip 6, 9 extends about corresponding connection point 11 edge and passes into next strip 6, 9 edge at connection point 11 edges. During the second expanding operation retaining force may be applied in the first direction and released before provision of material relaxing in the second expanding direction.
Building material "burolit" / 2303011
Proposed building material contains drilling the sludge at density of 1.3-1.8 kg/dm3, cement (preferably grade M400 D20 suitable for use at temperature of from minus 30 to plus 40C), 10-20% of volume of drilling sludge; carbamide-formaldehyde foam plastic at density of 10-30 kg/m3, 10-25% of volume of drilling sludge and mineral filler (sand, ground granite) at size of particles of 2.7-3.1 mm, 10-20% of volume of drilling sludge. Building material contains additionally calcium chloride in the amount of 2.0% of drilling sludge volume. Composition of drilling sludge is described in invention.
Road paving Road paving / 2298060
Fine-cellular paving includes a number of polyethylene vessels spaced minimal distance one from another and laid on trench bottom. The container cuts face upwards. The containers are provided with opened lower ends and are filled with powder material.
Ground mix for road building / 2296831
Ground mix comprises oil-containing waste, mineral binding agent and additive. The oil-containing waste is oil-contaminated ground. The mineral binding agent is Portland cement. The additive is powder industrial lignosulphonate. The components are taken in the following amounts (% by weight): oil-contaminated ground - 79.60-85.72; Portland cement - 14-20 and powder industrial lignosulphonate - 0.28-0.4.
Method for road building across peatbog (variants) Method for road building across peatbog (variants) / 2293814
Method involves forming ground embankment in layers, wherein ground for each layer is delivered to elongated building site by transport, which moves in technological flow direction. Empty transport returns in direction opposite to technological flow. Ground is laid on base, leveled and compacted by building equipment. The embankment body is serially carried out in sections, wherein before each embankment layer forming in each section building sire is divided into longitudinal strips, wherein the strips are alternated in each layer. In accordance with the first variant (in summer period when ground is laid on non-frozen peat cover) the building site is divided into three strips, the first layer is formed from two extreme strips and central strip is formed in advance of extreme ones so that length of central strip exceeds that of extreme ones for value of not less than 2.5bcr. Strips are alternated during next layers forming.
Construction of earth roadbed Construction of earth roadbed / 2288986
Invention can be used to strengthen weak base, increase strength and load-bearing capacity of roadbed. Proposed construction includes earth roadbed with shoulders and slopes, support longitudinal trench filled with material arranged in earth roadbed with geosynthetic material placed over top of trench. Longitudinal trench arranged along axis of earth roadbed or several longitudinal trenches are made with width of 0.6-10 at depth of 1.2-2.6 m filled with friction material, and geosynthetic material with minimum breaking strength of 15kN/m in longitudinal direction and of ≥ 20 kN/m in cross direction is placed over top of trench with back lapping into embankment providing formation of semiholders from two sides of earth roadbed.
Heat-insulation layer of road structure Heat-insulation layer of road structure / 2283910
Heat-insulation layer comprises at least one panel with cells filled with fiber material. The panels are formed of polymeric material, namely solid compacted polyethylene and are connected with each other to form single structure. The cells are hollow and face ground by opened parts thereof. Cells are provided with drain orifices made in cell surfaces.
Method to stack tires and to connect tire stacks with each other Method to stack tires and to connect tire stacks with each other / 2282693
Method involves laying tires one upon another in several layers so that tread tire parts are in close contact with each other; connecting the tires by inserting fastening members in tire interiors. Tires are grouped in the first tire layer and then perforated strips are installed in interior of each tire. Number of strips depends of number of adjacent tires. Perforated strip orifices are spaced apart a distance corresponding to tire layer thickness. Then adjacent tires are pulled together by means of fastening pins having flat non-threaded parts. The pins are located from top and bottom of tire sides. Then next tire layers are laid and connected in the same way to provide stack having necessary height. Spaces defined in tire stacks and between the tires are filled with filler.
Pavement built with the use of reinforced monolithic cement concrete Pavement built with the use of reinforced monolithic cement concrete / 2248425
Pavement comprises sand underlayer with hydrophobous roll material and monolithic cement concrete layer. Pavement is provided with geomesh arranged on underlayer. Geomesh has threads working in tension in longitudinal and transversal directions and forming lower monolithic layer. Pavement comprises three-dimensional honeycomb geogrid having cells filled with monolithic cement concrete to form intermediate layer and with fiber threads randomly directed and uniformly distributed over the whole volume to form upper layer.
Pavement built with the use of reinforced monolithic cement concrete Pavement built with the use of reinforced monolithic cement concrete / 2248425
Pavement comprises sand underlayer with hydrophobous roll material and monolithic cement concrete layer. Pavement is provided with geomesh arranged on underlayer. Geomesh has threads working in tension in longitudinal and transversal directions and forming lower monolithic layer. Pavement comprises three-dimensional honeycomb geogrid having cells filled with monolithic cement concrete to form intermediate layer and with fiber threads randomly directed and uniformly distributed over the whole volume to form upper layer.
Roadbed and roadbed forming method Roadbed and roadbed forming method / 2273687
Roadbed arranged on ground comprises base, water drainage channels extending along the base, reinforcing device located on the base and embankment formed over reinforcing device. Reinforcing device comprises drainage cuts and sand-gravel mix located in the cuts. The drainage cuts are formed in ground base and extend across roadbed for depth exceeding base height and reaches filtering ground level. The drainage cuts have width and pitch providing ground consolidation in road building period. Reinforcing layer is arranged over drainage cuts to provide liquid filtering in all directions without reinforcing layer properties change as load applied to roadbed increases. Sand-gravel mix compacted with vibrorollers is also arranged on reinforcing layer. Method involves forming drainage cuts across roadbed, wherein the drainage cuts have width and pitch providing ground consolidation in road building period and depth equal to depth of filtering ground location; filling the cuts with sand-gravel mix; compacting thereof; arranging reinforcing layer over the drainage cuts; pouring sand-gravel mix over the reinforcing layer; compacting sand-gravel mix and forming embankment including several layers. Each embankment layer is compacted with vibrorollers.
Method for gravel road and/or earth road reconstruction Method for gravel road and/or earth road reconstruction / 2280117
Method of gravel and/or earth road reconstruction with the use of loosening head and emulsified bitumen involves researching road to be reconstructed to determine if it is suitable for paving stabilization with the use of emulsified bitumen. Road research method involves measuring road traffic volume, earth type, strength and thickness of rock road base; determining thickness of load-bearing layer to be stabilized with the use of emulsified bitumen to provide predetermined road traffic volume; taking boring samples from paving; analyzing the taken boring samples; determining gravel or earth compatibility with emulsified bitumen; calculating emulsified bitumen volume compatible with road paving material and providing necessary strength. Then loosening head is activated to loosen upper gravel or earth layer during head movement along the road. Emulsified bitumen is injected in loosened road paving and mixed with loosened paving material to obtain gravel or earth stabilized by emulsified bitumen.
Method to stack tires and to connect tire stacks with each other Method to stack tires and to connect tire stacks with each other / 2282693
Method involves laying tires one upon another in several layers so that tread tire parts are in close contact with each other; connecting the tires by inserting fastening members in tire interiors. Tires are grouped in the first tire layer and then perforated strips are installed in interior of each tire. Number of strips depends of number of adjacent tires. Perforated strip orifices are spaced apart a distance corresponding to tire layer thickness. Then adjacent tires are pulled together by means of fastening pins having flat non-threaded parts. The pins are located from top and bottom of tire sides. Then next tire layers are laid and connected in the same way to provide stack having necessary height. Spaces defined in tire stacks and between the tires are filled with filler.
Heat-insulation layer of road structure Heat-insulation layer of road structure / 2283910
Heat-insulation layer comprises at least one panel with cells filled with fiber material. The panels are formed of polymeric material, namely solid compacted polyethylene and are connected with each other to form single structure. The cells are hollow and face ground by opened parts thereof. Cells are provided with drain orifices made in cell surfaces.
Construction of earth roadbed Construction of earth roadbed / 2288986
Invention can be used to strengthen weak base, increase strength and load-bearing capacity of roadbed. Proposed construction includes earth roadbed with shoulders and slopes, support longitudinal trench filled with material arranged in earth roadbed with geosynthetic material placed over top of trench. Longitudinal trench arranged along axis of earth roadbed or several longitudinal trenches are made with width of 0.6-10 at depth of 1.2-2.6 m filled with friction material, and geosynthetic material with minimum breaking strength of 15kN/m in longitudinal direction and of ≥ 20 kN/m in cross direction is placed over top of trench with back lapping into embankment providing formation of semiholders from two sides of earth roadbed.
Method for road building across peatbog (variants) Method for road building across peatbog (variants) / 2293814
Method involves forming ground embankment in layers, wherein ground for each layer is delivered to elongated building site by transport, which moves in technological flow direction. Empty transport returns in direction opposite to technological flow. Ground is laid on base, leveled and compacted by building equipment. The embankment body is serially carried out in sections, wherein before each embankment layer forming in each section building sire is divided into longitudinal strips, wherein the strips are alternated in each layer. In accordance with the first variant (in summer period when ground is laid on non-frozen peat cover) the building site is divided into three strips, the first layer is formed from two extreme strips and central strip is formed in advance of extreme ones so that length of central strip exceeds that of extreme ones for value of not less than 2.5bcr. Strips are alternated during next layers forming.

FIELD: construction, particularly road paving.

SUBSTANCE: method involves in-situ preparing crushed-stone based mix; laying the mix on ground or drain layer in one or several layers; moistening the mix; impregnating thereof with emulsified asphalt and compacting the base. The crushed-stone based mix includes blast-furnace slag in amount of 30% by weight and steel slag in amount of 70% by weight or only blast-furnace slag. Before base compaction bitumen-mineral emulsion including liquid phase, namely potassium carbonates or sodium carbonates in amount of 1-10 l/m2 is added in slag-and-crushed-stone mix. The emulsion is poured over the mix and mixed thereto along with following mechanoactivation of obtained composition with medium-heavy and heavy road-rollers. Base is compacted with ramming road-roller.

EFFECT: increased strength and uniformly-distributed road paving stability during operation thereof, possibility of base structurization with time.

1 cl, 1 ex, 3 dwg

 

The invention relates to the field of construction, namely the method of the road surface.

From the patent literature known way of device foundations of roads, including the following operations: preparation of the soil, the delivery on the roads and the introduction of granulated blast furnace slag crushing of the soil and mixing it with the slag, the introduction of lime-slag binder and mixing it with lakegrove mixture, moistening the mixture to the optimum moisture content, layout and seal it (see A.S. USSR №576297, IPC SW 19/00, AS 7/18, bull. No. 38, 1977).

The disadvantages of the method are technological complexity and insufficient durability of the pavement.

The known device technology base and coating of crushed stone, gravel and sand mixtures, processed organic binders mixing on the road (see SNiP 3.06.03-85 p.49). The way the device bases for roads(streets) and airfields includes the preparation of a mixture of crushed stone mix on the road, for example, using a grader, layout it in one and/or two layers on the soil or drainage layer, moisture (humidity crushed stone and gravel, processed emulsion is not less than 5%), impregnation with bitumen emulsion, for example, the brand EBA-3, ABC-3), and seal the base rollers weighing 6-8 tons, 3-5 passages is on the same track. The disadvantages of this method are the lack of increase in strength in time for road base 1 category. As you know, traditionally, the base is arranged from natural (limestone, dolomite) crushed stone. Endothermic reaction occurring from solar energy, softens the bitumen film in the intergranular space, where asphalt coating becomes megaplasmids structure with a significant decrease of the elastic modulus. In the bearing capacity of the coating decreases and corresponds only to the radius of the print wheels of the transport.

When this vehicle dynamic loads through the weakened floor are treated crushed stone base, where the disintegration of fractional gravel turns into a stone detail and powder, perceiving a significant amount of water (process water thermal regime), because of ice formation destroys the structure is not only the Foundation, but also deforms the coating with the formation of microtrain.

The objective of the invention is to develop a method of road base with fatigue strength, low dynamic flow and deformation resistance.

The technical result is robust, structure-in-time basis, with high and uniform stability of the roadway is the process of operation. The result of solving the aforementioned problem is to improve the speed dial the strength of the substrate in the first month of hardening and long-lasting increase in the strength of the substrate over time.

The problem is solved by the characteristics specified in the claims, in common with the prototype, such as the way the device bases for roads and airfields, comprising preparing a mixture of crushed stone mix on the road, the layout it in one or two layers on the soil or drainage layer, wetting, impregnation with bitumen emulsion and compaction of the base, and a distinctive, essential features, such as use slamdancing mixture containing blast furnace slag 30 wt.% and 70 wt.% steelmaking slag or 70 wt.% blast furnace slag and 30 wt.% steelmaking slag, or when the content of 100 wt.% blast-furnace slag, and before the seal base in slamdancing mixture is injected bitumen-mineral emulsion containing liquid phase carbonates of potassium or sodium in the amount of 1-10 l/m2for example, the method of the spill, mix with subsequent mechanical activation of the mixture sequentially medium and heavy rollers and compaction of the base produced by the compacting roller.

A new operation of mechanical activation in the method is carried out according to the formula of the invention consistently environments which they and heavy rollers, and the seal base - compacting roller. Subsequent mechanical activation of the Foundation is carried out by the vehicle during operation of the road.

Below is a causal relationship between the distinctive features of the invention and achievable technical result:

- use way slamdancing with a mixture of blast furnace slag 30-70 wt.%, 70-30 wt.% steelmaking slag content of 100 wt.% blast furnace slag can improve the bearing capacity of foundations;

- use for impregnation of a mixture of bitumen and mineral emulsion containing liquid phase - carbonates of potassium and sodium in the amount of 1-10 l/m2for example, the method of the spill gives you the ability to activate the slag powder for hydration hardening of the base,

if you take bituminous mineral emulsion is less than 1 l/m2not achieving the desired activation of the mixture and the desired curing properties. If you take bituminous mineral emulsion more than 10 l/m2,there is too much liquid phase, negatively affecting the process of hardening of the base in time. If the liquid phase has an acidity of less than 7, the mixture prevails cationic and anionic component of the emulsifier, i.e. will not be created conditions for activation hardening base;

- introduction to process new transactions - mechanoactivated is, this is a new way of intensification of physical and chemical processes in the mixture. It is based on the change of the reactivity of solids under the action of mechanical forces. Activation by grinding is widely used in the production of phosphate, used to improve soil fertility, has found application in the production of silicalite - new construction material. In road and airfield construction mechanical activation is proposed for the first time.

The above distinctive features, each separately and all together, are aimed at solving the problem and are significant. The use of the proposed combination of essential distinctive features in the prior art was not found, therefore the proposed solution meets the patentability criteria of "novelty".

One set of new essential features of a General known provides a solution to the problem is not obvious to a person skilled in the art and demonstrates compliance of the claimed technical solution to the patentability criterion of "inventive step".

The invention is illustrated by description of a specific but not limiting example of implementation.

Example.

Preparation of mixes can be ka is in stationary mixers type (less efficient way), and directly on the road surface technology, including the following operations: preparation of mixture of crushed stone mix on the road (for example, a grader, depending on the volume of mixed materials), layout it in one and/or two layers on the soil or drainage layer, moisture (humidity not less than 5%), impregnation with bitumen emulsion and seal the base.

Use slamdancing mixture containing blast furnace slag 30 wt.%. and 70 wt.% steelmaking slag(figure 3) or with the content of blast furnace slag 70 wt.%. and 30 wt.% steelmaking slag (figure 2), or with the content of blast furnace slag 100 wt.%. (figure 1).

Before the seal base in slamdancing mixture is injected bitumen-mineral emulsion containing liquid phase with a cationic emulsifiers (for example, potassium carbonate or sodium silicate, and not silicate salts of weak acids and others) with a pH of 10 in the amount of 8 l/m2for example, the method of the spill, mix with subsequent mechanical activation of the mixture on the 1st stage sequentially medium and heavy rollers (mass 8-10 tons), and the seal base - compacting roller (weighing over 10 tons), at the 2nd stage during the operation of vehicles.

Examples of the composition of the mixes are shown in figures 1, 2, 3. The graph shows the technical result from the use of the invention. In figure 1, 2, 3 is provided to change the structural properties of pavement depending on the type of rubble and service life of the roadway. From curves 1 graphs it follows that the bearing capacity of the pavement with a basis of crushed blast furnace slag has a structural trend. With increasing life strength properties increase to 7 MPa.

With a decrease in the blend quantity of the crushed blast-furnace production strength properties of the pavement decreases and correspond to figure 2 - 5 MPa, and figure 3 - 4 MPa. Reasons (1, 2) made of natural stone materials (limestone, gravel), carrying capacity (curves graph 2) regulatory responsibility only within 15 years. In subsequent periods of service of bearing capacity of Foundation and decreases according to the criteria of strength and modulus of elasticity Er respond to only 30% of the normative.

Figure 3 curve 2 the basis is the rubble of steel inactive toxins, where the lines of the graph indicate that load-carrying capacity is maintained at the level of normative with a slight decline after 20 years of operation. As grinding slag aggregates transport under dynamic loads, slag powder in combination with emulsifiers in the solution acquires the properties of binder hydration hardening, transforming the basis of a loose structure in semi-rigid or rigid plate.

Receiving mechanical activation - grinding slag active crushed stone is ri laying Foundation and under floor transport dynamic loads eliminates the grinding slag aggregates, saves fuel costs, electricity, transport and human resources.

The prototype bearing capacity of the base 60 kg/cm2and the proposed method is 75-80 kg/cm2.

The above examples confirm the implementation of the use of the invention as described in the claims.

The way the device bases for roads and airfields, comprising preparing a mixture of crushed stone mix on the road, the layout it in one or two layers on the soil or drainage layer, wetting, impregnation with bitumen emulsion and compaction of the base, characterized in that use slamdancing mixture containing blast furnace slag 30 wt.% and 70 wt.% steelmaking slag, or 70 wt.% blast furnace slag and 30 wt.% steelmaking slag, or when the content of 100 wt.% blast-furnace slag, and before the seal base in slamdancing mixture is injected bitumen-mineral emulsion containing liquid phase - carbonates of potassium or sodium in the amount of 1-10 l/m2for example the method of the spill, mix with subsequent mechanical activation of the mixture sequentially medium and heavy rollers and compaction of the base produced by the compacting roller.

 

© 2013-2014 Russian business network RussianPatents.com - Special Russian commercial information project for world wide. Foreign filing in English.