Method of tailing dump in mountain trenches recultivation

FIELD: ecology.

SUBSTANCE: invention relates to mining industry environmental safety and mountain landscapes protection against chemical contamination, coming with surface and underground water flows on tailing dump side. Method involves recultivation by means of loamy layer application and compaction. At that, recultivation is performed in three stages, first forming trenches in 15–30 m from tailing dump coastal zone (beach), with depth below tailing dump bottom for 3–5 m, with width of 1.5–2 m, with subsequent excavation of carcinogenic substances bottom deposits from tailing dump bottom, which are transported and stored in spent and abandoned mines at depth of past mining operations, and tailing dump bottom is filled with irlit-containing absorbent clays, creating geochemical barrier for water flows on tailing dump side.

EFFECT: technical result is creation of geochemical barrier for protection of surrounding landscapes against further spreading of chemical contamination, simplification of tailing dump reclamation.

1 cl, 2 ex

 



 

Same patents:

FIELD: technological processes.

SUBSTANCE: invention relates to the reclamation of sludge pits, production of artificial earth mixtures based on drilling sludge and can be used in the mining and oil-producing industries. The method consists in the subsequent collection of liquid oil, then, bituminised oil from water surface of the pit, pumping-out of a water phase from the pit, creation of cutting backfills, collection of the bituminised oil from the surface of the drilling sludge, collection of the bituminised oil, oil sludge and oil-contaminated soil from the diking surface of the drilling sludge pit, mixing of the obtained drilling sludge with peat and sand in the following ratio, vol %: drilling sludge not more than 75.0, peat not less than 18.0, sand not less than 7.0, at the total content of the components, which is equal to 100 vol % in the volumes providing the obtainment of soil performing a function of soil-forming rock, with further quality control of the soil, reinforcement of its surface, creation of a fertile layer and by planting; with that, the total volume value of the soil performing the function of the soil-forming rock, volume of a material for the creation of cutting strips, volume of a material for the reinforcement of the soil surface, volume of a material for the creation of the fertile layer is chosen based on the equality or non-exceedance of the volume of the drilling sludge pit.

EFFECT: obtaining the soil performing the function of the soil-forming rock - a component of natural environment, which has improved quality characteristics.

2 cl, 7 tbl, 1 ex

FIELD: ecology.

SUBSTANCE: material for reclamation of solid domestic waste landfills and quarries comprises the natural soil and industrial wastes. As the industrial wastes it comprises final slag formed during the production of ferrovanadium using aluminium-silicothermal manner with the mass ratio of natural soil to the industrial wastes equal to 1:1.

EFFECT: expansion of range of technical means.

2 dwg, 1 tbl

FIELD: construction.

SUBSTANCE: method includes separate excavation, displacement and piling of soil layer and overburden rocks into separate band dumps, mining of a pit field, filling of the mined space with construction wastes to the border of the upper level of ground water, and the composition of the wastes is close to natural minerals with different size of fractions, in layers with subsequent compaction of each layer, laying of a draining layer with construction wastes having thickness of not more than 0.6 m and with fraction size of 150-200 mm. At the same time they first perform design and planning works for construction of roads, passages, hydraulic engineering and land reclamation structures, then above the draining layer they do primary fill of the mined space of the pit with a mixture made of overburden rocks and ground construction wastes with fraction size of the latter not more of 100 mm that are mixed in equal proportions. Fill is carried out to complete filling of the mined space of the pit, then a layer of soil mixture with seeds of perennial herbs of meadow-weed group is applied onto the surface planed with a bulldozer, and at least in one year they perform final planning, then ploughing of the planed surface with subsequent levelling, afterwards roads are connected, and hydraulic engineering and land reclamation structures are arranged, and the restored area is divided into sections to bury remains.

EFFECT: reduced volumes of soil excavation for creation of a fertile layer and improvement of environmental situation.

FIELD: agriculture.

SUBSTANCE: in the river valley the dams of embankment are constructed for creation of fields of filtration and prevention of spreading of sewage water from the reclamated plot. At that the sewage water from the dredging water reservoir with a high content of suspended clay particles is fed through the hoses on the planned surface of the reclamated plot, and the place of pulp supply is periodically changed on the area of the reclamated plot.

EFFECT: return of the clay material in the pore space of coarse-grained sediment dredging that leads to saturation of deposits with fine soil and to improvement of the hydrothermal regime and increase in soil fertility.

2 dwg

Coal strip mining // 2523246

FIELD: mining.

SUBSTANCE: proposed method comprises the steps that follow. Top soil layer is removed to be preserves or to be transferred to territories to be reclaimed, loosening, loading and conveying stripped rock to make the waste dumps, dislodging, loading and coal transfer to storage and reclamation of dumps. Note here that seam weathered coal approaching the day surface is extracted and stored separately. Waste dumps are levelled to apply soil and weathered coal layers thereon. Produced layer is loosened with stripped rock and rolled.

EFFECT: higher efficiency.

FIELD: construction.

SUBSTANCE: method includes separate mining, movement and piling of soil layer and stripping rocks into separate belt dumps, mining of a open-pit field, filling of the mined space to the border of the upper level of ground waters with construction wastes. Afterwards they perform design and planning works to construct roads, passages, hydraulic engineering and land reclamation structures. Then they start filling the mined space in two stages. At first they do the primary filling of the mined space of the pit with a mix made of stripping rocks and ground construction debris with fraction size of the latter of not more than 100 mm mixed in equal proportions. Filling is done until complete filling of the mined space of the pit, then along the surface planned by a bulldozer they apply on top a layer of a soil mixture with seeds of perennial herbs of meadow-weed group, and final planning is carried out not sooner than in one year. Then the planned surface is ploughed, with subsequent levelling and filling of the entire surface of the mined space with a layer of sand with thickness of at least 100 mm with subsequent light levelling. Afterwards roads are connected, hydraulic engineering and land reclamation structures are arranged, and the entire surface of the planned surface of the mined space is divided into sections, in each one they perform burials of certain years and for the standard depth of burial.

EFFECT: reduced labour inputs for restoration works, protection of soil against wind and water erosion.

FIELD: mining.

SUBSTANCE: invention relates to mining and may be used for recultivation of anthropogenic structures and strengthening of dust-producing surfaces. The method includes treatment of stored tailings with a binding compound, sowing of perennial herbs and compaction of the surface layer. At the same time previously, for formation of a pedogenic layer, they treat the surface of the tailing dump with a zeolite hydraulic mix at the ratio of zeolite-water equal to 1:2 and perform tillage of the surface layer. And treatment of soil with a binding compound, sowing of perennial herbs and compaction of the surface layer is carried out simultaneously, at the same time binding compounds are water-soluble polymers.

EFFECT: creation of a pedogenic layer due to application of zeolite tuffs onto the surface of the tailing dump, making it possible to exclude application of fertilisers, to strengthen development of herbal root systems, thus to increase efficiency of biological recultivation of a tailing dump.

2 cl, 2 ex, 1 dwg, 1 tbl

FIELD: mining.

SUBSTANCE: sowing of herbs and hard-shrub species is carried out in indents of uneven surface of mine dumps. Simultaneously with that Nitraria sibirika is sown into grooves cut on the tops of process crests of dumps.

EFFECT: reduced time for complete design coverage of anthropogenically damaged lands with plants.

FIELD: mining.

SUBSTANCE: method includes filling of the mined space to the border of the upper level of ground water with construction wastes, arrangement of the drainage layer with construction wastes, formation of a hill in the centre of the pit by dumping of stripping rocks with subsequent terracing of hill slopes and arrangement of places for burial of remains, at the same time underground tomb structures are arranged on terraces, being designed for several graves, besides, each tomb structure is made with hydraulic insulation, drainage system, drainage and ventilation systems, at the same time the ventilation system is additionally equipped with a separate air duct installed with an angle of inclination of not more than 35 degrees and made in the form of a hollow vertical channel filled with stems of cane located in the ground in close proximity from the tomb structure with the possibility to connect each subsequent grace to it in the tomb structure.

EFFECT: reduced labour costs and costs of recovery works, rational usage of land.

1 dwg

FIELD: mining.

SUBSTANCE: method includes filling of a mined-out space of a quarry to the border of the upper level of ground water with construction wastes, arrangement of a drainage layer with construction wastes, formation of a hill in the centre of the mined-out quarry from stripping rocks with terracing of its slopes, installation of a drainage system, retaining walls, and arrangement of places on terraces for burial of remains, at the same time retaining walls for terraces are made of reinforced concrete cylindrical piles by means of their submersion in soil, pile caps are rigidly connected to each other with the help of concrete mortar, and on terraces they arrange underground vault structures with hydraulic insulation, water disposal system, drainage and ventilation systems, at the same time the first burial is made for depth of more than three meters, and the distance from the cover of the last burial to the level of terrace surface ground shall make at least one meter.

EFFECT: rational use of restored land areas.

1 dwg

FIELD: chemistry.

SUBSTANCE: composition for purification and remediation of soil from petroleum pollution contains nitrogen-phosphorus fertiliser and zeolite-clayey rock in ratio 1:3. Vermiculite is used as Zeolite-clayey rock and organomineral product, formed after mechanical processing of sewage water sediments and active oil, is used as fertiliser.

EFFECT: sorption binding and utilisation of pollutant, reduction of remediation terms and increased degree of purification.

3 tbl, 2 ex

FIELD: agriculture.

SUBSTANCE: for desalination of heavy saline lands, water is supplied to the desalinisation site, the slits 3 are cut, the irrigation pipes 6 with droppers 7 are placed along the central axis of the inter-slit bands, the inter-slit bands are covered with waterproof screens. Then the wash water is fed through the droppers 7, the soil with salt is moved from the walls of the slits 3 at their bottom after the termination of washing, and the slits 3 are poured. Before cutting the slits 3 the deep loosening 2 is carried out. The slits 3 are cut with a bias of the bottom towards the collector and matched with it. Along the central axis of the inter-slit bands the troughs 5 are formed by compacting, in which the pipes 6 with droppers 7 are placed. After moving to the bottom of the slits 3 of soil with salt they are poured first with gravel as the layer of 0.2-0.3 m, then with sand of the field surface. Then, the site surface is levelled and ploughing is carried out with the formation of the arable layer.

EFFECT: increased efficiency of desalination of heavy saline lands with minimal cost of water, diversion of excess precipitation with removal of salts beyond the desalinisation site.

3 dwg

FIELD: biotechnology.

SUBSTANCE: method comprises grinding slaughter tankage, rotary subsurface mechanical treatment using the ripper with cutters on a horizontal shaft 5 and its mechanical drive in the form of a rotary milling chisel plough 6, the distribution of pulp from slaughter tankage and water in the soil in the process of its rotary subsurface loosening. For disposal of slaughter tankage, it is ground to a particle size of 2-5 mm, mixed with water or water containing disinfectant, in the ratio of 1:3-1:5. Then the formed pulp is applied in the soil to a depth of 30-80 cm. The soil is ground to a particle size of 1-25 mm and mixed with the pulp in a ratio of 1:6-1:20. Then the upper layer of soil is treated on the trace of passing of the rotary milling chisel plough 6 with the disinfectant.

EFFECT: increase in the degree of processing of slaughter tankage, accelerated decomposition of disposed biological material in the soil, improvement of soil fertility.

1 dwg

FIELD: agriculture.

SUBSTANCE: invention relates to agriculture. The method of environmentally friendly bioconversion of superfine metallurgical industry wastes containing heavy metals comprises creation of mixtures based on sand, metallurgical sludge, peat and calcium carbonate for growing plants, and for bioconversion the plants of fodder beet (Beta vulgaris L.), large-flowered flax (Linum grandiflorum), sweet corn (Zea Mays) and rapeseed (Brassica napus) are used.

EFFECT: invention enables to simplify the technology of obtaining organo-mineral fertilisers for agriculture in the process of biological recovery of metal production wastes.

4 ex

FIELD: technological processes.

SUBSTANCE: invention relates to the reclamation of sludge pits, production of artificial earth mixtures based on drilling sludge and can be used in the mining and oil-producing industries. The method consists in the subsequent collection of liquid oil, then, bituminised oil from water surface of the pit, pumping-out of a water phase from the pit, creation of cutting backfills, collection of the bituminised oil from the surface of the drilling sludge, collection of the bituminised oil, oil sludge and oil-contaminated soil from the diking surface of the drilling sludge pit, mixing of the obtained drilling sludge with peat and sand in the following ratio, vol %: drilling sludge not more than 75.0, peat not less than 18.0, sand not less than 7.0, at the total content of the components, which is equal to 100 vol % in the volumes providing the obtainment of soil performing a function of soil-forming rock, with further quality control of the soil, reinforcement of its surface, creation of a fertile layer and by planting; with that, the total volume value of the soil performing the function of the soil-forming rock, volume of a material for the creation of cutting strips, volume of a material for the reinforcement of the soil surface, volume of a material for the creation of the fertile layer is chosen based on the equality or non-exceedance of the volume of the drilling sludge pit.

EFFECT: obtaining the soil performing the function of the soil-forming rock - a component of natural environment, which has improved quality characteristics.

2 cl, 7 tbl, 1 ex

FIELD: electricity.

SUBSTANCE: electrolyser-neutraliser of dissociated contaminations contains pipe casing out of current conducting material and electrodes installed in the casing and connected to source of alternating multiphase current. The casing is made of segments adjoining to each other with creation of the tubular element. The tubular element internal surface at input has constriction, and at output has diffuser. The electrodes are installed in sectors or between sectors in direction of the cleaned flow movement. Sectors are tied up by end cone inserts.

EFFECT: increased productivity due to flowing cleaning of contaminants, simplified replacement of electrodes depending on type of the neutralised wastes.

6 dwg

FIELD: agriculture.

SUBSTANCE: in the method after the preliminary collection of oil from the soil surface, perennial herbal plants resistant to oil-contamination are sown in the oil-contaminated soil simultaneously with the introduction of microorganisms-oil destructors in the form of a solution of a biological product comprising microorganisms-oil destructors with mineral fertilisers.

EFFECT: method enables to increase the cleaning efficiency due to the involvement in the processes of biodegradation of oil-contamination of the wider spectrum of petroleum hydrocarbons and to accelerate the process of the soil recovery.

1 tbl, 2 ex

FIELD: agriculture.

SUBSTANCE: method comprises undercutting of contaminated topsoil, throwing to the bottom of the furrow and piling it with an uncontaminated layer. The contaminated soil layer is undercut by the soil tillage body of a scraper type and moved aside to form a ridge, and the uncontaminated soil fertile layer is opened. The open uncontaminated soil layer is undercut by the combined working body and lifted to the conveyor without the layer overturning. The soil layer is transported first up, then down, leaving a passage for the contaminated layer undercut by the lateral working body of a scraper type under the ridge of the contaminated layer formed by the first working body, and together they are moved to the bottom of the furrow. Then the contaminated soil layer is compacted and closed with the uncontaminated layer passing down from the conveyor. After that the soil is levelled and compacted to the operating width of the device. The device comprises a rectangular frame, support wheels, a mechanism of attachment to the tractor and the working bodies. The first and the lateral working bodies are made of a scraper type. The device also has a combined working body composed of two arranged towards each other rigidly interconnected working bodies of the mouldboard type plough. The total mouldboard part of the combined working body is made truncated in the form of a trough. Behind the combined working body there is a conveyor with ascending, horizontal and descending parts, having a drive of PTO of the traction unit through the power shaft, a reducer and a chain drive. Behind the conveyor a pusher is mounted for levelling the surface of the field after the passage of the device and a packing roller, which is a support one in the transfer of the device to the transport position by the hydraulic cylinder attached to the median longitudinal bar of the frame.

EFFECT: improving the quality of treatment of soil contaminated with radionuclides and heavy metals by avoiding mixing of the contaminated and uncontaminated soil layers in the process of their moving.

7 cl, 2 dwg

FIELD: agriculture.

SUBSTANCE: group of inventions relates to the field of agriculture. The method comprises pasturing by animals, destroying of not eaten, harmful and poisonous plants, levelling animal excrement, and removal of uneaten residues by harrows and rakes, fertiliser application, as well as creation of tree and shrub shelterbelts. At that on the area intended for hayfields and pastures area after pasturing by animals the fertilisers are initially applied, and then the uneaten plants are destroyed, tilting them and applying herbicide by method of smearing it on their biomass, including stems and lower surface of leaves. Harrowing and treatment the grass with rake is carried out after the start of regrowth of plants eaten by animals. The device comprises a reservoir for the herbicide, as well as a pump for feeding it to the tubular perforated rods with means for application of the herbicide to the plants. The perforated rods are mounted behind each other in parallel with the ability of horizontal and vertical displacement, and the device for application of the herbicide to the plants is made in the form of capillary cloth located between the pressure plates and attached on the perforated parts of the said rods which are connected and framed with the cloth and placed in the tubular casings with longitudinal slots through which the cloth is passed, compressed by the pressure plates fixed on the edges of the slots. And the perforated tubular rods are communicated with each other by the hose, at that the inlet end of the front tubular rod is connected to the pump and the outlet end of the rear rod through the drainage tube with the valve - with a reservoir for the herbicide to form a flow regulated system. Furthermore, the perforated tubular rods and their casings are attached to the frame, mounted on the propellers, with freedom of vertical and horizontal displacement.

EFFECT: inventions enable to simplify the technology of creation of forage land on fallow lands with simultaneous formation of tree-shrub belts.

6 cl, 3 dwg, 2 ex

FIELD: chemistry.

SUBSTANCE: invention relates to environmental conservation technologies, cutting-edge agricultural technologies and chemistry of organosilicon compounds and can be used to restore the structure of disturbed soils by stabilising water-stable aggregate. In particular, the present invention employs water-soluble humic silanol derivatives that are modified in a special way to endow them with the capacity to be irreversibly sorbed on surfaces of mineral particles and other hydroxyl-containing carriers. Humic derivatives are added to the degraded soil in form of aqueous solutions.

EFFECT: method for use in agricultural technologies includes using humic derivatives as structure-forming agents (soil ameliorants) by via attachment thereof to the surface of soil aggregates in order to endow the latter with water-stable properties.

8 cl, 11 dwg, 8 tbl

FIELD: agriculture.

SUBSTANCE: invention relates to techniques of drainage of agricultural land of nonchernozem belt with closed drainage and the techniques of use of these lands. The method comprises loosening the drained soils to a depth of at least 60 m. In order to ensure the required by the plants of soil humidity conditions, preventing the possible damage to the pipes of closed drainage and providing industrial applicability of deep loosening, the deep loosening is carried out to a depth of hl, determined in each case from the condition of compliance with the following requirements: (hr)min ≤ hl ≤ (hr)max;(1), hl ≤ (hr)min - D - ΣΔhi , (2), where ΣΔhi = Δh1 + Δh2 + Δh3 + Δh4; (3), 60 ≤ hl ≤ ht , (4) where (hr)min and (hr)max are the minimum and maximum depth of penetration into the trench backfill of the closed drainage of the root system of cultivated culture, respectively, cm; (hd)min is the minimum depth of placement of closed drainage pipes of the project at the site where deep loosening is planned to be carried out, cm; D is the outer diameter of the closed drainage pipes at the site (cm); ΣΔhi is the sum of corrections (cm), including: the correction which depends on the accuracy of the topographic altitude survey of soil surface of the drained site, Δh1; the corrections taking into account the technogenic erosion of the soil surface during carrying out crop-engineering and land planning Δh2 and during ploughing Δh3; correction taking into account the depth of the gauge made by the tractor on the soil surface during deep loosening, Δh4; ht is the maximum possible depth of loosening soil due of the technology level and characterising the industrial feasibility of the inventive method; at that in each point of the drainage trench the thickness of the powdering layer of the drainage pipe over the bottom of the trench mp > hd - hl, where hd is the depth of placement of the closed drainage pipe. Prior to loosening the soil on the drained part the value of the set depth of deep loosening is set on the mechanism of the ripper when setting up, preparing it for work.

EFFECT: positive result is to obtain by a landholder of closed drainage durable and reliable in operation, providing design humidity conditions of soil during its operation for at least a normative term of service.

2 cl

Up!