Method of open working out of steep deposits with internal spoil disposal

FIELD: mining.

SUBSTANCE: method in which the quarry along the length is divided by the lines, of which the first is worked out to a target depth with an external spoil disposal and working out of the subsequent ones is carried out using an internal spoil disposal, placing the overburden in the mined-out space of the adjacent line with the common formation of the dump tiers with the development of mining work. And simultaneously with the start of mining operations in the quarry of the first stage within the quarry of the second stage along the deposits the front quarry is built with angles of the slopes of sides close to the angles of reclamation, the cross-overs are located in it for providing cargo communication of the upper working horizons of the quarry of the first stage with the surface, with the reduction of mining operations in the quarry of the first stage on its longitudinal side the loop cross-overs are made adjacent to the bottom of the quarry in the area of the end side, which is formed with a slope towards the temporary side, marking the limit of the quarries of first and second stage, when achievement in the mining operations in the quarry of the first stage of the current depth. The separation of the sides of the front quarry is carried out, turning them into working, and after complete working out the reserves of the quarry of the first stage the working out the reserves of the quarry of the second stage is carried out, while linking its main openings to the main openings of quarry of the first stage in the locations of the loops, the inner dump in the worked-out area of quarry of the first stage is formed as inclined and horizontal tiers, at first directly with the surface from the side not occupied with main openings, the inclined tier is made with bulldozers with width of the platform on top equal to zero, and then using a draglines it is extended by the amount of boom extension, after this the horizontal tiers are dumped in series from the bottom up from the loop cross-overs with the high ensuring their sustainability, to complete formation of the inner dump.

EFFECT: decrease in the distance of inner transportation of overburden from the working area to the inner dump.

8 dwg

 

The invention relates to an open development of mineral deposits, and more particularly to an open development steeply sloping fields with the use of internal reserves.

The known method [1] open pit steeply sloping fields with the use of internal reserves.

Mining with this method begins with the construction of the career of the first stage at full depth with moving waste rock in external dumps. After creating the career of the first stage is transferred to the second stage is to conduct operations in the career of the second stage. Mining activities begin to develop in the direction of the end throughout the depth. In backordered developed space create internal dump, which develop after podvigina ledges working Board. This blade in place further overburden. Transportation of the mineral and overburden in the system with internal stacking produced by road transport. Freight transportation communication working Board with layers of inner blade carried out by the transport berms located on one of the longitudinal outside of the pit.

On the same Board is satisfied with the internal semi conventions for delivery to the surface of the fossil. In the case where the height of the shaft tier exceeds the height of the ledge, these conventions will also be used for freight transportation communications workers of ledges with tiers of the blade. Prestaciones congresses due to the fact that as podvigina front works congresses flooded inland dumps. Therefore, transport outside of the Board to replace retiring new semi congresses. The life of a semi congresses at various horizons varies: in the upper horizons new conventions create through 1-1,5 years, on the bottom after 6-8 months.

However, due to the large additional volumes of Stripping on the device exposing openings, this method is not used in the development of steep deposits. Its scope is limited to relatively shallow occurrence of a useful mineral, when the angle of incidence equal to or less than the angle of maturity transport pit, or when a constructive angle side more angle on the conditions of sustainability.

The closest technical solution is the way to develop steep deposits queues using internal stacking [2]which career field is divided by the length of the queue. The first and foremost being the full depth and hauling waste rock to external dumps. The opening of the first stage is the capital of trenches mixed the CSOs of inception: two or three of the upper horizon opened trenches external location and the lower horizons - trenches internal laying. After testing the first stage of the work included the adjacent turn, adjacent to the worked-out space of the first stage. The second stage is being moved overburden in the mined-out area of the first stage.

Opening business horizons and their freight transportation bond with the surface and internal tiers of the blade through capital tranches internal laying, have repaid the longitudinal outside of the pit.

However, this method also has significant drawbacks. The main drawback is significant (2-3 times) to increase internal transport overburden compared to the internal volume of traffic at the external dumping. It is because of overburden of upper horizons career of the second stage are carried at the lower horizons of the career of the first stage, and overburden lower horizons career of the second stage is located in the upper horizons career first queue.

The invention solves the problem of reducing volumes of traffic in terms of surface mining steeply dipping deposits with internal dumping.

The technical result to be obtained by use of the invention is reduced and the internal volume of the transport of overburden by reducing the number of revealing the workings and improvement schemes of their location at the opening of business horizons quarries of the first and second queue.

This technical result is due to the fact that in the known method of surface mining of steeply dipping deposits with internal dumping, in which the pit length is divided into a queue from which the first practice to the design depth with external stacking, and the development of the subsequent turns are using internal dumping, placing Stripping in the mined-out area adjacent turns, simultaneously with the beginning of the development of mining operations in the career of the first stage within the career of the second stage along the deposits build good careers with angles of slope close to the corner of maturity, there have conventions to ensure freight transportation links top business horizons career the first phase with the surface, as the reduction of mining operations in the career of the first stage on its longitudinal Board suit loop congresses, adjacent to the bottom of the quarry in the area of the end side formed with a slope in the direction of the interim Board, which differentiates career first and second stage, when reaching the mining operations in the career of the first stage current depth

Ht=Nto-Ninh1/h2,

where Nto- the final depth of the pit is the first stage, Nin- depth advanced career, h1and h2correspondingly soon the th reduction of mining in the open pits of the first and second queue, produce separation of the boards, best career, turning them into work, and after full development of the reserves of the career of the first stage produce mining stocks of the second stage, tykwa its opening production from quarry workings of the first stage in the locations of the loops, the inner blade in the developed space career of the first stage is formed in the form of inclined and horizontal tiers, initially directly from the surface side of the Board not involved in revealing the workings, dozer way form an inclined layer with the width of the pad at the top is equal to zero, then using the rope-bucket excavators expand it to the size of the boom, then sequentially from the bottom up with a loop of congresses produce filling of horizontal tiers of height, to ensure sustainability, to complete the formation of the inner blade.

This set of essential features of the proposed method will reduce the amount of Stripping activity associated with the additional spacing of the pit required for revealing the workings, and significantly reduce the transportation distance overburden career of the second stage in a goaf career first queue.

The method is illustrated in the drawings, in which figure 1, 2, 3 shows the position of the mountains who's work in the claimed method at the time of completion of the advanced career with revealing the workings, ensure the opening of the top business horizons career first stage, figs.4, 5 regulation of mining operations at the end of the spacing flanges advanced career with bringing them to a working condition and full working off the career of the first stage, 6, 7, 8 regulation of mining operations at the time of the final stage of field development and formation of the inner blade based on the sequential filling of inclined and horizontal dump tiers.

The inventive method is as follows. The length of the pit is divided into several queues (in the drawings shows the division into two stages. The first phase 1 work on the project depth with the movement of overburden to external dumps (not shown).

Simultaneously with the beginning of the development of the reserves of the career of the first stage within the career of the second stage 2 along the reservoir 3 (see figure 5) build good careers 4 corners of the slope close to the corner of maturity on the sides which have the congresses 5 (see figure 1) to provide freight transportation communications workers of ledges 6 career of the first phase with the surface. As the reduction of mining operations in the career of the first stage (see figure 4, 5) in its longitudinal Board 7 suit loop congresses 8, adjacent to the bottom 9 a career in the area of the end flanges 10, which is formed with a slant towards the temporary Board is 11, separate career first and second stage. Upon reaching the mountain works in the career of the first stage current depth

Ht=Nto-Ninh1/h2,

where Nto- the final depth of the pit is the first stage, Nin- depth advanced career, h1and h1accordingly, the speed reduction of mining operations in open pits first and second stage, to produce a separation of the boards best career 4, turning them into working 12, and after full development of the reserves of the career of the first stage produce mining stocks career second stage, tykwa thus revealing his generation 13 (see Fig.6, 7, 8) revealing the workings career first stage 8 in the locations of the loops 14 (in the drawings shows one of them). Internal dump in the developed space 75 career of the first stage is formed in the form of inclined 16, 17 and horizontal 18, 19 storeys. Originally directly from the surface side of the Board not involved in revealing the workings, dozer way form an inclined layer 16 with a width of pad at the top is zero. Then using the rope-bucket excavators expand it to the size of the boom, creating a sloping layer 17. After that, sequentially from the bottom up with a loop of congresses 8 produce filling horizontal layers 18, 19 height, ensuring the overall stability, to complete the formation of the inner blade.

The inventive method provides compared to prototype a significant reduction in internal traffic due to the fact that the working volumes of overburden career of the second stage are approaching the height of the tiers of the inner blade on which they reside. In addition, the claimed method provides a significant improvement in the mode of mining operations in the construction of advanced career.

Sources of information

1. Drums V.F. Development of steep and inclined seams open way with the placement of tailings in mined-out space /Wraparound, Piommasow, III //Coal. - 1959. No. 12. - P.12-15.

2. A.S. 337516 the USSR, MKI IS 41/00, the Method of surface mining steeply dipping deposits with internal dumping / Rutkowski astray freight No. 725101/22-3; Appl. 03.04.1961; publ. 05.05.1972, bull. No. 15.- SP.

Method of surface mining steeply dipping deposits with internal dumping, in which the pit length is divided into a queue from which the first practice to the design depth with external stacking and testing of the second stage is carried out with application of internal dumping, placing Stripping in the mined-out area adjacent turns, characterized in that simultaneously with the beginning of the development of mining in which arere the first stage within the career of the second stage along the deposits build good careers with angles of slope, close to the corners of maturity, there have conventions to ensure freight transportation links top business horizons career of the first phase with the surface, as the reduction of mining operations in the career of the first stage on its longitudinal Board suit loop congresses, adjacent to the bottom of the quarry in the area of the end side formed with a slope in the direction of the interim Board, which differentiates career first and second stage, when reaching the mining operations in the career of the first stage current depth
Ht=Nto-Ninh1/h2,
where Nto- the final depth of the pit is the first stage, Nin- depth advanced career, h1and h2accordingly, the speed reduction of mining operations in open pits first and second stage,
produce separation of the boards, best career, turning them into work, and after full development of the reserves of the career of the first stage produce mining stocks career second stage, tykwa its opening production with revealing the workings career first stage in the locations of the loops, the inner blade in the developed space career of the first stage is formed in the form of inclined and horizontal tiers, initially directly from the surface side of the Board not involved in revealing the workings, bulldozer soobobfrirm inclined tier with a wide platform at the top is equal to zero, then using the rope-bucket excavators expand it to the size of the boom, then successively from bottom to top with a loop of congresses produce filling of horizontal tiers of height, to ensure sustainability, to complete the formation of the inner blade.



 

Same patents:

FIELD: mining.

SUBSTANCE: method comprises formation of the working area, technology of mining overburden benches and providing cargo communication of the working horizons to the surface, the overburden benches of the working area are taken of the increased height (25-30 m), based on the condition of their mining using excavators with extended working equipment, the benches are combined into groups of three in each. At that for the upper and lower benches in the groups the minimum working areas are provided with dimensions equal to the width of the transport platforms, providing two-way traffic of technology vehicles and its manoeuvring, for the middle benches the width of the platforms is taken equal to the sum of the width of minimum working area and the width of the recess stope with ready-to-dig volumes of overburden, providing the necessary speed of reduction of mining operations in each group of overburden benches of the working area during the formation of the breakdown of the blasted rock mass based on conditions of placing it on the middle and lower benches. And the breakdown of the rock remaining on the middle benches, is divided into two layers, the upper of which are worked out with excavators with top loading into vehicles that are on the platforms of upper benches, the volumes of the lower layers and volumes of the overburden dumped with explosion on the lower benches are worked out with individual excavators with loading to vehicles at the same level with them. After working out the ready for excavation volumes of overburden in all groups of benches and formation of the corresponding volumes on the adjacent underlying benches and displacement of the boundary of the groups occurring at that down by one bench, their working out is repeated in the above procedure, opening the overburden benches of the working area of is carried out using steep sliding cross-overs with the longitudinal slope of 12-15 and width, providing placement of the breakdown of the blasted rock mass during their extension and at the same time the through passage of the technological transport, the extension of steep cross-overs is carried out using track and wheel loaders by dividing the breakdown of the blasted rock mass to the horizontal and inclined layers with the height defined taking into account the trajectory of motion of the loader bucket.

EFFECT: reduction of current stripping ratio in the initial period of working out of the field.

3 dwg

FIELD: mining.

SUBSTANCE: control method comprises control of the intensity of the high temperature thermodynamic laser irradiation to the area of the laser radiation, regulation of change of the wavefront of the laser radiation, control of milling cutting force P, the parameters of the rock material rigidity f through the registration sensor of the rock material rigidity, mounted on the frame of fibre optic laser emitter, the speed control of movement of the surface miner Vki, introduction to program of algorithm of calculation of the wavefront of laser radiation power W, depending on the parameters of rock material rigidity f and the approach increment of fibre optic emitters li based on the equation.

EFFECT: invention enables to improve the efficiency of management of technological preparation for excavation of rock material and provides remote control of destruction of rock material.

2 cl, 10 dwg

FIELD: mining.

SUBSTANCE: invention relates to the mining industry and can be used in open development of mineral deposits. The method comprises opening the deposit and recovery of mineral deposits with ledges with formation of the inclined surfaces of slopes and pit edges, drilling wells, loading of wells with explosives, breaking of the rock mass with blasting of explosives in units, distributed on the pit ledges, loading and transportation of the rock mass to the sites of its storage or further processing. The location sites and size of rock blocks are determined, hovering on the slopes of the ledges. From the earth's surface or upstream sites of ledges the workers and drilling equipment is descended on the lifelines to the upper surface of the hovering rock block. In the hovering rock block the wells are drilled with the distance between the wells not exceeding the maximum distance equal to the twice depth of distribution in the rock mass in the vicinity of the well of area of the rock destruction that occurs when blasting explosives in the well. The wells are drilled parallel to the surface of the slope of the ledge, and the distance between the wells and the surface of the slope of the ledge is taken as equal to the depth of distribution in the rock mass in the vicinity of the well of area of the rock destruction that occurs when blasting explosives in the well.

EFFECT: improving the safety of open mining operations.

2 dwg

FIELD: mining.

SUBSTANCE: method is performed using the automated system which comprises a laser device with the possibility of longitudinal displacement and is provided with a damper platform placed on the surface miner frame and pivotally connected to the frame of the laser device. The laser device is placed on the frame guides with the ability to move longitudinally along the guides on the rolling bearings using the drive connected with the automatic control unit, and is made in the form of a cassette with fibre-optic emitters placed along the moving direction of the surface miner.

EFFECT: improved technological efficiency due to forming in the surface layer of the processed areas of zones with overlapping of laser slots, providing high concentration of stresses, alternating loads and deformation during laser processing of significant surface; performance improvement of process of destruction, disintegration and decrease in the volume of fraction requiring additional subsequent crushing due to combining the process of cutting slits and layers-strip cutting of rock materials by surface miners, and providing environmental safety.

2 cl, 5 dwg

FIELD: mining.

SUBSTANCE: invention relates to mining and can be used in dredging of valley and floodplain detritus. This method comprises construction of stream diversion channel, service pool for dredge and system of water treatment plants. Stream diversion channel is composed by natural bed in drag bank made at working the deposit in lengthwise direction with earth prism filling to inner slope of dredge bank. Extraction of mineral during stream diversion channel is carried out by asymmetric manoeuvring of dredge to ensure maximum cross-section area of dredge bank. Water level in service pool and water treatment plats is kept level with stream diversion channel water horizon.

EFFECT: higher environmental safety, decreased scope of works.

3 cl, 2 dwg

FIELD: mining.

SUBSTANCE: proposed method comprises drilling the vertical wells, charging the latter, placing the charges, short-delay blasting of said wells and selective excavation. Blasting of blocks is performed in bulk. Note here that all three dimensions of blasted block, i.e. width, length and height, are set irrespective of the position of contacts and the number of ore bodies. After block blasting, portion of shotpile is dumped over slope roof with working of the first pass over rock on the side of ore body hanging side. Depending on attitude of ore body in blasted block, selective working of productive bench is performed in two sub-benches with mining in layers.

EFFECT: decreased losses of ore and ore dilution.

1 dwg

Coal strip mining // 2523246

FIELD: mining.

SUBSTANCE: proposed method comprises the steps that follow. Top soil layer is removed to be preserves or to be transferred to territories to be reclaimed, loosening, loading and conveying stripped rock to make the waste dumps, dislodging, loading and coal transfer to storage and reclamation of dumps. Note here that seam weathered coal approaching the day surface is extracted and stored separately. Waste dumps are levelled to apply soil and weathered coal layers thereon. Produced layer is loosened with stripped rock and rolled.

EFFECT: higher efficiency.

FIELD: mining.

SUBSTANCE: proposed method comprises opening of deposit by galleries at quarry unworked edge, working of deposit in blocks with excavation of minerals by chambers, release of crushed mineral to underground openings and bringing it to grass. Note here that deposit is developed by galleries at dividing unworked edge to horizons equal to height of production bench. Charges are laid in gallery blast-holes and wells. Cut opening is produced by blasting blast-hole and well charges of the gallery central group. Rock is excavated and loaded to carries via loading funnels. Blast-hole and well charges are blasted to force the deposit of the gallery flank groups to cut opening. Conical bank of blasted rock is formed, loaded and transported. Deposits of central and two flank directions are developed to isolate prior development zones by quality of mineral stock.

EFFECT: creation of working zone in central and two flank directions at unworked edge at selective working of deposits.

3 dwg

FIELD: mining.

SUBSTANCE: invention relates to mining particularly to openworking of rocks. Zoning is adjusted by registration of changes in thrust and lift engine performances to tie the latter via bucket spatial position in digging cycle for registration of bench bottom quality, granulometric composition and shape of cut rock bulk at transition from near well space to gotten well space. Characteristics of bench bottom working are allowed for by changes in performances of thrust engine at the level of bench bottom. Rock granulometric composition is defined by changes in performances of lift engines at filling and retention of filled bucket. Bulk compactness is defined by changes in performances of lift engine at scooping height registration at transition from gotten near well space to gotten well space.

EFFECT: higher efficiency of zoning and quality of blasting.

4 dwg

FIELD: transport.

SUBSTANCE: access ramp for trucks in open-pit mine combined with inclined safety berm of open-pit mine includes empty and loaded branches and additional ramps to safety berms of open-pit mine located on side slopes of ramp for trucks. Herewith, empty and loaded branches of access ramp for trucks are separated and located in different half-trenches the bases of which are inclined safety berms of open-pit mine replacing sections of horizontal safety berms of open-pit mine along path of ramp for trucks and interconnected by additional ramps for auxiliary equipment located on side slopes of half-trenches, and additional ramps connecting access ramp for trucks with safety berms of open-pit mine are located at both sides of it.

EFFECT: reduction of quarring costs due to simplification of works for final pit edge formation and reducing volume of excavation removal caused by its through cut for berm of ramp for trucks.

1 dwg

FIELD: mining art, in particular, open-pit mining of mineral resources by high benches.

SUBSTANCE: large-diameter single holes are replaced by a pair of divergent holes of a smaller diameter, in which one hole is always vertical, and the other one is inclined towards the bench; the single holes of the larger diameter are replaced with a pair of divergent bundles of parallel converged holes, in which one bundle is vertical, and the other is inclined towards the bench; the single holes of the larger diameter are replaced with a pair of divergent holes of a smaller diameter, in which one hole is vertical, and the other is inclined towards the bench and positioned in the vertical plane parallel with the first one and distant from it by 1-2 hole diameters; the single holes of the larger diameter are replaced by a pair of divergent bundles of parallel converging holes, in which one bundle is vertical, and the other is inclined towards the bench and positioned in the vertical plane parallel with the first one and distant from it by 1-2 hole diameters.

EFFECT: enhanced efficiency of blasting of the benches.

7 cl, 6 dwg

FIELD: mining industry.

SUBSTANCE: method includes dividing quarry on rows, of which first one is extracted to planned depth with external dump-forming, and extraction of following rows is performed with use of internal dump-forming, placing dug rocks to extracted space of adjacent row with common displacement of dump front with development of mining operations. Second and following rows of quarry are divided on basis of height on extraction levels, extraction of uppermost level is performed with placement of dug rocks in upper dump level of extracted space of adjacent row, using surface transporting communication lines, and during extraction of second extractive level dumping of dump level of inner dump is primarily performed by forming pioneer dump at longitudinal processed edge of quarry, on upper area of which transporting lines are placed and dumping of dump level is performed from there, with descent of mining operations in working area of extractive level profile of upper dump area is altered to provided necessary cargo communications of working horizons of extractive level to dump level, after extraction of extractive level remaining pioneer dump is dug to upper mark of following extractive level, and extraction of following extractive levels is performed analogically, using reformed upper area of pioneer dump.

EFFECT: higher efficiency.

10 dwg

FIELD: mining industry.

SUBSTANCE: method includes cutting steps with varying angles. Angles of double step slopes, different on basis of quarry depth, are formed with consideration of decrease of irregularity parameters with deposit depth, with natural block level of upper horizons and influence from mass explosions and wind erosion of rocks with gradual increase of their steepness until forming of vertical slopes of double steps during additional operations in quarry, while angles of slopes and edge portions on upper horizons in highly fractured rocks may be 50-55, in rocks of average and non-specific fracture levels - 70-60 and in low-fractured rocks may be 80-85, and edge portions 60-90 m high in deep portion of quarry with vertical double steps and preventive berms 10 m have slant angle 80-85.

EFFECT: higher efficiency.

6 dwg, 1 tbl, 1 ex

FIELD: mining industry.

SUBSTANCE: method includes extraction of quarry to planned depth with use of quarry ore chutes with accumulating bunkers, cutting ore chutes with deepening of mining in quarry, crushing ore blocks and pieces from face from bunker walls by explosives, loading ore to railway vehicles, cutting and shutting upper portion of ore chutes at each level when mining approaches there is performed by division on beds and semi-shelves with charges in wells, providing for crushing of rock to needed dimensions and safety of mine walls, and further decrease of pieces size and increasing efficiency of ore chute operation by excluding ore suspension is achieved by use of crushing assembly in form of bowl with plate at base, working as anvil under layer of rock, from where ore mass is self-propelled to bunker, and from there by feeder is sent to crusher and further through intermediate conveyer to main conveyer.

EFFECT: higher efficiency.

4 dwg, 1 ex

FIELD: mining industry.

SUBSTANCE: method includes extracting quarry to planned depth by ore and rocks extraction by displacement of shelves along horizons with transferring to crushing plants, crushing rocks and then delivering them by lifting device to the surface, during extraction of quarry to planned depth at first stage during construction of board at the end of quarry in zone of decrease of power of deposit in stable rocks conveyer rope system is constructed, connected to hoisting machine, to bed with recesses, allowing to raise crushed material to large height at steep angle and with deepening of mining and displacement of crushers to lower horizons conveyer system is extended to provide for optimal transport shoulder for gathering vehicles.

EFFECT: higher efficiency, higher productiveness.

2 cl, 6 dwg, 1 ex

FIELD: mining industry.

SUBSTANCE: method includes opening deposit of mineral resource along its length, extraction of opened rocks in shelves, forming on one of the portions of deposit of forward extracted space reaching planned bottom, moving rocks to external dumps and into extracted space, processing and transporting of mineral resource. Deposit extraction is performed in two directions - perpendicularly to length of deposit with deepening and along length to quarry bottom, while volume of extraction of mineral resource along length is increased and volume of extraction of resources perpendicularly to length is proportionally decreased.

EFFECT: higher efficiency.

2 cl, 3 dwg

FIELD: mining industry.

SUBSTANCE: method includes serial extraction of drifts with placement of opened rocks of drifts in extracted space of previous drifts, continuous combined processes of softening, extraction and movement of rock to dump. Drifts are positioned along cut trench, extraction is performed by adjacent horizontal shavings of face area, rock of each drift is moved by throwing directly to extracted space and compacted in range by realization of kinetic energy of rock.

EFFECT: higher efficiency.

2 dwg

FIELD: mining industry, applicable for slanting of high benches at development of magmatic deposits of mineral resources by open pit.

SUBSTANCE: the method includes drilling of contour holes for formation of a screening peephole, buffer and breaking holes to a depth corresponding to the height of one working subbench with a redrill, the middle row of breaking holes is made with an incomplete drill, charging of the openings and their blasting, dispatch of the rock, after blasting first of outline openings, for formation of the screening peephole, and then of breaking holes and mucking of the rock, similar operations are performed on the underlying subbench of the lower high bench, at the development of the lower high bench, the development of the upper and lower benches is conducted by doubling of the working subbenches, at the development of the lower subbench of the upper high bench the outline openings are drilled to the whole height of the doubled bench, the buffer openings are drilled at a distance of 12 to 13 diameters of the charge from the outline openings and to a depth at least corresponding to the height of one working subbench with a redrill equal to 6-8 diameters of the charge, the first and last rows of the breaking holes are drilled with a redrill, equal to 4-5 diameters of the charge, and the incomplete drill of the middle row of the breaking holes makes up 7-8 diameters of the charge, after blasting of the buffer and breaking opening and mucking of the rock a crest is formed, from whose surface on the side of the slope outline and buffer openings are drilled, the first ones - to the height of doubled subbenches, and the second ones - to the height at least of one lower working subbench, then the breaking openings to the same height as in the above - and underlying subbenches and for production of a natural protective bank on the upper section of the lower high bench in the section of the berm the formed ridge is liquidated by drilling, charging and blasting of the openings of small diameter and depth.

EFFECT: enhanced stability of high benches on the outline of the open pit.

2 cl, 3 dwg, 1 ex

FIELD: mining industry.

SUBSTANCE: method includes opening deposit at distance 150 meters from river and forming of natural filtering wall between river and trench, pumping of water from trench into river, extraction of mineral resource, revegetation of dumps, filling of trench with water, accomplishment of formed water body. Mineral resource is extracted from two serially opened trenches - auxiliary, revegetated as water body, and main, positioned at opposite side of river, and soil from opening of which is used for revegetation of auxiliary trench, while in main trench along whole board on the side of river right beyond mining operations inner dump is formed with width not less than 250 meters and with height at same level with earth surface, water from trenches is fed into river, and then into water body through intermediate collectors, while after forming of water body currents of soil waters between trenches and river are made balanced, balance level is estimated on basis of water levels in auxiliary trench and river.

EFFECT: higher efficiency.

1 dwg, 1 ex

FIELD: mining industry.

SUBSTANCE: method includes extraction of quarry to planned depth in stages with construction f boards with parameters, allowed from stability condition, shutting boards, finishing mineral resource massif. Building and shutting of temporary boards during extraction of steep layers of next level after change of order of extraction of opening and ore zones is started after construction and spacing in center of cut of well-like mine with vertical shelves, with parameters, which are provided for by minimal radiuses of rounded edges enough for movement of rock via spiral chutes to surface to outer dumps, with narrowing space towards bottom at level of opened level of deep portion of deposit with lesser total coefficient of opening of stage and finally board is constructed by steep vertical shelves in deep zone.

EFFECT: higher efficiency.

1 ex, 10 dwg