Method of oil pool development

FIELD: oil and gas industry.

SUBSTANCE: method involves pumping of working agent through injectors and recovery of the product through producers. The section is selected at the deposit with the following characteristics: remaining reserves of at least 3000 thousand t, reservoir pressure equal or less than initial reservoir pressure, water cut of the produced product within limits of 80-99% and injectability of injectors within limits of 40-140 m3/day at wellhead pressure of 4-15 MPa and permeability of at least 500 mD against results of hydrodynamic research. At this section an injector is selected with perforation interval according to hypsometric marks lying at the maximum height and at least 1 m above the perforation interval of the nearest producer. In the selected injector the injection volumes are limited up to values less than 50 m3/day. For the other injectors placed at 1 m below the perforation interval of the producer the injection volumes are increased per 5% in comparison with volumes injected earlier. In this mode injection is made within 3 months under control over changes in operation mode for producers by measurements of bottomhole pressure and water cut. Similar operations are made with other groups of wells for the selected section of development.

EFFECT: higher oil recovery of the deposit.

2 ex

 

The invention relates to the oil industry and can find application in the development of oil deposits.

There is a method of developing a heterogeneous oil field, which includes the drilling of a field row on an uneven grid of wells, the injection of the displacing agent in injection wells and selection of products from production wells. Well injection number after porting the front of the displacing agent in the first row of wells transferred to the category of production and exploit their mode of formation pressure below the saturation pressure, but not below the critical pressure of elastic-plastic deformation of the skeleton of the productive formation to achieve maximum cost-effective watering. Next, conduct research to establish interlayers with residual oil saturation. Then the selection of the products are produced from wells with the greatest number of interlayers with residual oil saturation and higher hypsometric mark. Download resume in wells located in the lower parts of the structure (Patent RF №2194153, published. 10.12.2002).

The closest to the proposed invention the technical essence is a way to develop oil deposits with plantar water, whereby to produce the injection of working agent through the discharge with the vazhiny, the selection of products through the production wells and the creation of a system of control and regulation of pressure between oil and water-bearing parts of the reservoir. The pressure in the reservoir is maintained at the level of values that establish a static level in the estuary zone of the extraction wells. Under the selection of oil choose producing wells with high hypsometric marks formation. From the trunks of these wells are removed sadavoy liquid. Fill them with oil of the same deposits. Roofing part of the productive formation in these wells again reveal in the oil environment of the wells with formation of perforations depth exceeding the thickness of kolmat zone. The selection of oil carried out periodically. When selecting oil use the well bore from the mouth as a reservoir for sediment and accumulation of oil (RF Patent No. 2151860, published. 27.06.2000 - prototype).

A common disadvantage of the known technical solutions is the low oil recovery reservoir.

In the proposed invention solves the problem of increasing oil deposits.

The task is solved in that in the method of development of oil deposits, including the injection of working agent through the injection well and reservoir selection of products through the production wells, according to the invention, the Deposit of select plot development with residual reserves in the amount of not menee t, having a pressure equal to or less than the initial reservoir pressure, water content of the produced formation products within 80-99% and injectivity of injection wells is in the range of 40-140 m3/day when wellhead pressure within 4-15 MPa, characterized by the permeability on the hydrodynamic researches of wells not less than 500 MT in this area choose an injection well, the perforation interval which according to the hypsometric marks located at the maximum height and above 1 m the perforated interval the nearest production well, in the selected injection well to limit the volume of injection to less than 50 m3/day, other injection well below 1 m the perforated interval of the production well, produces an increase of the injected amount of 5% or more previously pumped volumes in this mode have pumped a period of not less than 3 months to monitor changes in the mode of production wells by means of measurements of downhole pressure and water content, such work is carried out with other groups of wells selected plot development.

The invention

In the development of oil deposits of part of the oil remains bypassed due to insufficient coverage of the influence of the height of the deposits. Existing methods enable the processing aimed at increasing coverage impact area deposits, that does not lead to increased production of reserves in height. In the proposed invention solves the problem of increasing oil deposits by increasing the coverage of impact deposits working medium in height. The problem is solved as follows.

In the development of oil deposits carry out the injection of the working agent through the injection well and reservoir selection of products through the production wells. On deposits choose plot development with residual reserves in the amount of not less than 3000 tons, with a reservoir pressure of 12-14 MPa or equal to the initial Plast pressure of 16 MPa, the water content of the produced formation products within 80-99% and injectivity of injection wells is in the range of 40-140 m3/day when wellhead pressure within 4-15 MPa, characterized by the permeability on the hydrodynamic researches of wells not less than 500 MT. On this site choose the injection well, the perforation interval which according to the hypsometric marks located at the maximum height and above 1 m the perforated interval the nearest production well. When the distance to the nearest production well over 500 m in the selected injection well to limit the volume of injection to less than 50 m3/day, with the distance to the nearest production well is less than 500 m limit pumping up to full recovering the file. Other injection well below 1 m the perforated interval of the production well, produces an increase of the injected amount is 5% higher than the pumped volume. In this mode have pumped a period of not less than 3 months to monitor changes in the mode of production wells by means of measurements of downhole pressure and water cut. Such work is carried out with other groups of wells selected plot development.

Specific example

Example 1. Develop an oil field with the following characteristics: the depth of 900-1200 m, reservoir pressure 12-14 MPa, reservoir temperature 26-36°C, the porosity of 5-40%, permeability 5-1000 MDA, the thickness of the productive layer of 0.1-12 m, the viscosity of the oil 12-35 MPa*s, the density of the oil 0,865-0,925 g/cm3the collector - Sandstone-siltstone, type deposits are massive.

Spend the injection of working agent - produced water through 5 injection wells and sampling of formation products in 20 producing wells.

On deposits choose plot development with a residual inventory of 3,000 tons, with the current reservoir pressure of 12-14 MPa, with a water content of produced formation products within 80-99%, by injectivity of injection wells is in the range of 40-140 m3/day when wellhead pressure within 4-15 MPa, characterized by the permeability on Gidrodinamika is Kim research wells not less than 1000 MD. On this site choose one injection well, the perforation interval which is 1150-1165 m This interval according to the hypsometric marks is 1 m or more perforation interval of all producing wells in this area. The nearest production well over 500 m In the selected injection well to limit the volume of injection to the values of 5-50 m3/day, i.e. less than 50 m3/day. Other injection well below 1 m and more, produces an increase of the injected amount is 10-15% higher than the pumped volume. In this mode have pumped a period of not less than 3 months to monitor changes in the mode of production wells by means of measurements of downhole pressure and water cut.

Such work is carried out with other groups of wells selected plot development.

Example 2. Perform as example 1. The nearest production well is less than 500 m In the selected injection well limit the injection of up to a complete stop. Other injection well below 1 m the perforated interval of the production well, produces an increase of the injected amount to 5-10% higher than the pumped volume.

In the oil recovery deposits increased by 1-2% and amounted to 1.5%.

Application of the proposed method is expected to improve the recovery of oil deposits.

The way of the development of oil deposits, including the injection of working agent through the injection well and reservoir selection of products through the production wells, wherein the Deposit choose plot development with residual reserves in the amount of not less than 3000 tons, having a pressure equal or less than the initial reservoir pressure, water content of the produced formation products within 80-99% and injectivity of injection wells is in the range of 40-140 m3/day when wellhead pressure within 4-15 MPa, characterized by the permeability on the hydrodynamic researches of wells not less than 500 MT in this area choose an injection well, the perforation interval which according to the hypsometric marks located at the maximum height and above 1 m the perforated interval the nearest production well, in the selected injection well to limit the volume of injection to less than 50 m3/day, other injection well below 1 m the perforated interval of the production well, produces an increase of the injected amount of 5% or more previously pumped volumes in this mode have pumped a period of not less than 3 months to monitor changes in the mode of production wells by means of measurements of downhole pressure and water content, such remoteprinter with other groups of wells selected plot development.



 

Same patents:

FIELD: oil and gas industry.

SUBSTANCE: method involves pumping of working agent through injectors and recovery of products through producers. For the purpose of development a pool or a poll part is selected with formation pressure at least equal to the initial one, water cut of 60% and more and recoverable reserves of at least 40 thousand t. Then the post-event analysis is made for the selected section in regard to changes in dynamics of formation and bottomhole pressure and the least worked-out section with content of clay fraction of 2.5% and more. Upon the preformed analysis several design point of drilling for vertical inclined well are replaced by one injector with horizontal completion. The horizontal shaft is placed in the stratum with thickness of at least 3 m. The shaft is constructed at the border of the reservoir collector transition from clayey sandstone to aleurolite. Upon input of the horizontal injector into operation liquid is injected into the stratum under permanent control of changes in operation mode of the surrounding producers by means of bottomhole pressure measurement and product water cut. When bottomhole pressure rises up to the value sufficient to intensify product recovery operations on optimisation of subsurface pumping equipment are made to a bigger standard size. Upon the preformed analysis several design point of drilling for vertical inclined well are replaced by one producer with horizontal completion. The horizontal shaft is placed in the stratum with thickness of at least 3 m. The shaft is constructed at the border of the reservoir collector transition from clayey sandstone to aleurolite. Upon input of the horizontal producer into recover of reservoir liquid is made under permanent control of changes in operation mode of the surrounding producers by means of bottomhole pressure measurement and product water cut. When bottomhole pressure decreases per 10% below saturation pressure operations on injection increase are made through the affecting injectors.

EFFECT: improving oil recovery in the deposit with clayey collector.

2 cl, 2 ex

FIELD: oil and gas industry.

SUBSTANCE: cut-off system includes equipment of the well with at least one packer with or without return valve downstream connected to the cut-off landing nipple directly or through one or several tubes, and running in and out of an electric submersible pump unit at the pipe string. At that the cut-off valve consist of a lock, a case with input and output passing channels, sealing collars, a controlled element and a locking group. According to the invention the system is equipped with a hollow shank interconnected hydraulically from bellow to the cut-off controllable element and to the cavity of the pipe string over the electric submersible pump unit from the above. For this purpose the pipe string and hollow shank upstream and downstream the electric submersible pump unit are equipped respectively with axial and off-centre upper and lower couplings with taps interconnected by a hydraulic channel passing close to the electric submersible pump unit. At that the upper coupling has either a through axial channel or a through off-centre channel or a through axial landing channel. When the upper coupling is made with the landing axial channel then a divider for two cavities is run in at the additional pipe string of a less diameter with a side return valve. The lower coupling is connected hydraulically to remote measuring equipment. Besides the hollow shank with or without crossover unit is equipped with a disconnector with a running tool or without it. At that the cut-off valve is either run in to the well or set to the landing nipple before running in of the electric submersible pump unit or run in to the well at the running tool under the hollow shank and placed to the landing nipple. At that the disconnector under the hollow shank is connected to the disconnector or its controlled element or the landing nipple. The cut-off valve with a lock is equipped by a pressure adjuster and its sealing collars are set either lower or upper than the output passing channel. The case and controlled element of the cut-off valve form a working chamber connected through the hollow shank and hydraulic channel to the cavity of the pipe string or additional pipe string over the electric submersible pump unit. The controlled element is made as a piston or plunger or bellows capable of the locking group opening and closing at start-up and shutdown of the electric submersible pump unit or at the target generation or release of excess pressure in the additional pipe string or the pipe string. The closing group is made as a support saddle assembly and a gate or as a cylinder and a plunger gate. The piston or bellows or the gate is spring-loaded under the preset force. The cut-off valve is made with or without control mechanism to fix position of the controlled element rotated at the rod or in a case of a coded bushing with through or blind cam slots designed for the limiter in the case or at the rod respectively.

EFFECT: improving operational efficiency of the pumping well due to prevention of the productive stratum bullheading downstream the packer at replacement of the electric submersible pump unit.

3 cl, 21 dwg

FIELD: oil and gas industry.

SUBSTANCE: procedure for treatment of bottomhole zone of a producer includes filling in of the productive stratum interval with a solution for asphalt, resin and paraffin depositions with partial flushing to the well bottomhole. Vacuum and pulse simulation is carried out with simultaneous extraction of the reaction products. The interval of the productive stratum is filled in with hydrochloric acid solution, which is flushed partially to the well bottomhole. The process is withheld and vacuum and pulse simulation is carried out with simultaneous extraction of the reaction products. At that in one cycle of vacuum and pulse simulation about 0.01 m3 of liquid is pumped out. During vacuum and pulse simulation upon flushing of the solution for asphalt, resin and paraffin depositions quantity of pulses is increased 3-6 times more than upon flushing with hydrochloric acid solution, moreover volume of the reacted solution to be extracted is equal to the volume of the injected solution for asphalt, resin and paraffin depositions.

EFFECT: improving treatment efficiency of a bore-hole zone.

3 ex

FIELD: oil and gas industry.

SUBSTANCE: invention is related to oil producing industry and may be used successfully for development of oil and gas deposits with hard to recover reserves opening up both carbonate and terrigenous reservoirs, including oils of high viscosity. The concept of the invention is as follows: the method includes oil production from producers, injection of displacement agents to injectors, surveying of geological environment in productive strata and use of physical simulation techniques, registration and analysis of radiated emissions from geological environment both before and upon simulation. According to the invention spatial-temporal aggregate of simulation centres is defined by registration and analysis of time series of radiated emission signals from geological environment areas that cover fields with different fluid saturation, fracturing and stress as well as node areas of high instability within the square area and volume of strata. At that the aggregate is determined before simulation and corrected in its process. Analysis of radiation emission signals is made with consequential transformation of time span and determination of time differences in variation cycles of radiation emission intensity corresponding to fractal substructures of the environment ranging them from the smallest ones. Thereafter in the determined centres against the square area or volume the areas or time spans are specified from which or in compliance with which polyfrequency wave and/or pulse action is made simultaneously at two or more frequencies. At that data on oscillation frequency or pulsed frequency are specified with corrections in process of simulation against the above time differences determined in analysis process of radiation emissions.

EFFECT: improving efficiency of the development method due to simulation of strata by physical emissions thus providing effective oil influx to wells and expanding functionality of the method.

16 cl, 1 ex, 1 dwg

FIELD: oil-and-gas industry.

SUBSTANCE: proposed method consists in application of wave dilation technology. Note here that operation of pumping units in wells is synchronised, said units being equipped with wave dilation effects promoters. To ensure said synchronisation, downhole hardware is furnished with sensors for registration of elastic vibrations and channels for transmission of received signal to the surface at pumping unit operation control board. Note also that synchronisation of every pumping unit in the field is effected in frequency of signal generated pumping unit of master well.

EFFECT: higher efficiency of extraction and oil yield.

FIELD: physics, acoustics.

SUBSTANCE: invention relates to oil and gas industry and can be used on fields with different structural types, including depleted fields and fields with hard to recover reserves. Seismoacoustic investigations during oil extraction include a downhole acoustic radiator generating elastic vibrations in the form of a cylindrical wave horizontally directed into a formation; using seismic detectors mounted on the earth's surface on a profile to detect and measure amplitude-frequency parameters of longitudinal and transverse waves propagating through the formation, said waves being caused by deformation of rocks by elastic vibrations of the downhole acoustic radiator; simultaneously with the seismoacoustic investigations, using the elastic vibrations of the downhole acoustic radiator to create a pressure gradient for displacing oil and extracting oil.

EFFECT: high accuracy of seismoacoustic investigations and higher oil recovery factor.

1 dwg

FIELD: oil-and-gas industry.

SUBSTANCE: in compliance with this method, two rotary pumps are lowered on flow string. Said pumps are driven by downhole motor with two pro-shaft extensions. Top rotary pump feeds into flow string. Bottom pump serves to break bonds of colmatant and to discharge it in, for example, sludge trap. Top pump serves to change well fluid dynamic level and to force produced fluid to the surface. Development process is controlled from the surface by, for example, control station with frequency inverter of downhole motor.

EFFECT: higher efficiency.

2 dwg

FIELD: oil-and-gas industry.

SUBSTANCE: set of inventions relates to oil production. Oil production system comprises mix of oil with carbon bisulphide and/or carbon oxysulphide, separating substance consisting of hydrolysis agent suitable for hydrolysis of carbon bisulphide and/or carbon oxysulphide. Besides, it includes oxidation agent suitable for oxidation of carbon bisulphide and/or carbon oxysulphide, or absorbing gas containing nitrogen. Device to inject said separating agent intended for oil separation from carbon bisulphide and/or carbon oxysulphide by hydrolysis or oxidation of carbon bisulphide and/or carbon oxysulphide, or by desorption of carbon bisulphide and/or carbon oxysulphide from oil.

EFFECT: higher oil recovery, efficient production of carbon disulphide.

17 cl, 8 dwg

FIELD: oil-and-gas industry.

SUBSTANCE: invention can be used for improvement of oil reservoir performances at various stages by bringing the direct effects on deposit of resilient mechanical oscillations of preset intensity and frequency. It increases the efficiency of mechanical effects and drive life and decreases the power consumption. Vibroexciter drive comprises housing with feed and discharge channels, reactive-type drive rotor made of cermet fitted on commutator-shaft running in bearings fitted on the drive housing, replaceable inserts from cermet provided with calibrated orifice in its axis and temporary plug with the seat for said insert.

EFFECT: commutator-shaft is driven by productive bed gas flow at rpm preset by calibrated orifice flow section made with allowance of gas well yield.

3 dwg

FIELD: oil-and-gas industry.

SUBSTANCE: proposed method comprises control over crude oil phase state. To prevent formation of solid phase in crude oil with paraffinic sediments, first, saturation of crude oil with paraffins is defined with due allowance for saturation temperature of degassed oil and content of paraffins. Influence of pressure and amount of gas dissolved in oil is evaluated under reservoir conditions with allowance for current seam pressure and crude oil gas content. Deposit operation conditions are set when seam pressure and pressure of oil saturation with gas are similar or equal while paraffins in oil are saturated or close thereto. At content of paraffins of 0.5-2 wt % in seam oil operation conditions are selected at seam oil extraction with pressure compensation by injection of cold water. Note that seam pressure is not decreased below initial pressure and phase state of seam oil with paraffins is not disturbed.

EFFECT: higher efficiency of the process.

1 tbl

FIELD: oil extractive industry.

SUBSTANCE: method includes electro-hydraulic treatment of bed at resonance frequency and extraction of oil from bed. According to invention bed is excited by resilient pulses at broad frequency range from 0 to 10 kHz. Frequencies are set, at which bed is treated. Resonance frequency is kept by singular, periodical, radially focused electro-hydraulic pulses with generation frequency, divisible by bed resonance frequency. Concurrently in adjacent well bed excitation frequency is controlled by resilient pulses and corrected according to measurements results.

EFFECT: higher efficiency.

2 dwg

FIELD: mining industry.

SUBSTANCE: invention comprises following scheme. Oil is produced from producing wells. Potassium salts are extracted from mines and processed. Solutions are pumped into deep lying porous rock formations preliminarily revealed between oil-bearing and potassium formations. Those porous rock formations are chosen which are located below underlying stone salt. Pumping of solutions is effected through injecting wells until pressure drop in oil-bearing formation is compensated to a value sufficient to prevent deformation in potassium formations, this value being calculated using special math formula. Oil formation is then run while maintaining compensating pressure in chosen porous formation.

EFFECT: significantly reduced environmental loading and increased safety of mining operations.

3 cl, 1 dwg

FIELD: oil and gas production.

SUBSTANCE: when treating well bottom zone, the latter is exposed to magnetostriction action under conditions of 50% depression of formation pressure. Magnetostriction action is carried out from the roof to the subface of formation including stepwise treatment of each linear meter for 2.5-3.5 h.

EFFECT: increased efficiency of removing of mud components from well.

FIELD: oil and gas production.

SUBSTANCE: when treating well bottom zone, a reagent, in particular water-oil emulsion with up to 30% water and with surfactant additives, among them nonionic components, is pumped into formation. Number of electric discharge pulses is set basing on real porosity of formation taking into consideration empiric dependence of the number of electric discharge pulses per 1 m of formation on the porosity of rocks, which dependence was preliminarily obtained on core material. Pulse treatment of bottom zone of well is effected in a reagent medium with electric discharges from electric-discharge machine, which is displaced and periodically fixed for treating a local area of well bottom zone.

EFFECT: enhanced well bottom zone treatment efficiency.

FIELD: oil and gas extractive industry.

SUBSTANCE: method includes pumping of replacing agent through force wells. Cyclic vibro-seismic treatment with alternating frequencies is performed on bed, using ground vibration sources. Composition and amount of extracted fluid is determined after and before treatment. Dominating frequencies of bed are detected on basis of reaction of micro-seismic noise thereof on vibro-seismic treatment. Additional vibro-seismic treatment is performed by signal being a total of at least two monochromatic signals with frequencies equal to dominating frequencies of block of productive oil deposit bed. Treatment is performed till development of cracks, while placing blocks in resonance oscillations, and separating of inner potential energy, providing for intensification of processes of forming of clusters in extensive zone from blocks of productive bed having different sizes.

EFFECT: higher oil yield.

1 ex, 1 dwg

FIELD: oil and gas extractive industry.

SUBSTANCE: method includes lowering assemblage with brushes on tubing column into perforation interval. Interval is filled with chemically active environment. By driving tubing column, assemblages are rotated and concurrently reciprocally displaced. Inter-tubular space is separated above perforation range. Bed is drained with forming of sign-alternating liquid displacement in perforation interval and weak depression pulses. Washing out of treatment products is performed by pumping out reaction products with dirt through apertures in the brush.

EFFECT: higher efficiency.

1 ex, 2 dwg

FIELD: oil extractive industry.

SUBSTANCE: method includes pumping working agent into wells of force rows and/or locked force blocks, extraction of liquid and gas from extraction wells, separation of force and product wells on portions and groups and physical effect on productive beds, in particular change of direction of filtering flows. Prior determination of relative remainder extracted oil deposits in productive bed is provided along watered product wells and portion as a whole. Calculation of adapted, on basis of parameters of oil displacement in whole portion, oil saturation level in product of liquid for values of relative remainder oil resources in each product well. Than product wells are singled out, in which actual oil level is not less than adapted for relative remainder oil resources of this well. These wells together with water-less wells are left in constant operation in mode of maximal liquid extraction. Remaining extraction wells as well as force wells are enabled in periodical operation in groups. At the same time in one semi-cycle a group of force wells is enabled in operation in mode of minimal working agent volume pumping mode, and product wells being in area of effect of these - in mode of maximal liquid extraction, or vice versa. In following semi-cycle modes of operation of product and force wells are swapped with opposite ones. Grouping of product wells and modes of their operation are corrected in accordance to changes of relative remainder extracted oil resources, actual and adapted oil level in wells in time.

EFFECT: higher oil yield of productive beds.

20 cl, 3 tbl, 1 ex, 2 dwg

FIELD: mining industry.

SUBSTANCE: method includes concurrent heat and wave processing of bed. Said effect is performed by feeding heat carrier into bed through pressure oscillations generator, mounted in force or extracting wells. Wave effect is performed with value of oscillations frequency, which are determined from analytical dependencies.

EFFECT: higher efficiency.

3 cl, 3 dwg

FIELD: oil industry.

SUBSTANCE: method includes taking oil from product wells, forcing water into force wells, maintaining face pressure at product wells higher than oil pressure of gas saturation, and at force wells - lower than pressure of bed hydraulic fracturing. Well operation technological modes are measured, pressure restoration curves are taken, filtering parameters of bed are determined. According to invention for each of wells, with consideration of their interference, partial derivative of total deposit oil debit is determined on basis of face pressure. Then by utilizing partial derivative of total oil debit on basis of face pressure graph of total oil extraction is built dependent from totals of absolute values of depression and repression. On basis of characteristic bend on the graph optimal mode of technological effect on deposit is determined and realized.

EFFECT: higher oil yield, higher efficiency.

1 ex, 1 tbl, 1 dwg

FIELD: oil industry.

SUBSTANCE: method includes determining dominating frequency of productive bed by performing prior vibration-seismic action using surface oscillations source at different frequencies and analysis of seismic graphs from seismic receivers in product wells. Vibration-seismic effect on watered portion of productive bed of oil deposit is performed by a group of surface oscillations sources, operating at dominating frequency of productive bed. Bed fluid is extracted via product wells. After vibration-seismic effect on watered portion of productive bed of oil deposit by a group of surface oscillations sources, operating at domination frequency of productive bed, concurrent vibration-seismic effect is performed using two sub-groups of said group of surface oscillation sources. Each sub-group of group operates at determined from mathematical dependence. Average frequency of surface oscillations sources of whole group is equal to dominating frequency of productive bed. Difference in frequencies, on which each sub-group operates, is determined in accordance to linear size of watered portion of productive bed of oil deposit and is satisfactory to mathematical dependence. Concurrent vibration-seismic effect by two sub-groups of said group of surface oscillations sources is performed with forming of wave having length exceeding length of wave with dominating frequency.

EFFECT: higher oil yield.

2 ex

Up!