Method for hydraulic mining of coal beds

FIELD: mining.

SUBSTANCE: first preparatory field mines are driven - level haulage and ventilation drifts with identical geodetic elevations, block crossdrifts and accumulating drifts with an inclination for a self-flow transport, stripping wells are drilled at the right angle to the bed plane, then, line cuts are washed by the hydraulic method. Level haulage and ventilation drifts stretch at identical geodetic elevations to form a ventilation scheme with horizontal depression. The area of line cuts is increased to initiate the process of caving of a hanging massif in a stope. The stope bottom is formed by washing of line cuts with an inclination providing for accumulation of caved coal through self-flow. The caved coal is magazined to control shift of side rocks in the stope. Chambers that are adjacent to the mined space are separated by barrier sight pillars. Oversize material is crushed, and coal mass is periodically discharged in dosing manner into the accumulating drift to provide for stope bottom movement up the pitch.

EFFECT: elimination of air leaks through a mined space, reduced contamination of coal by caved rocks, higher reliability of breaking face functioning and labour safety.

2 dwg

 

The technical field

The invention relates to the mining industry and can be used for deserted dredging steep and inclined coal seams.

Prior art

The prior art method of designing cool coal seams, revealed in the author's certificate SU 823580 published 23.04.1981, which includes conducting storey drifts transport and ventilation, drilling down dip of the reservoir and the recess floor stripes on the uprising of the downhole jetting units, and storey drifts conduct the field, from the transport passage to the reservoir, in the preparation of each band performed at least two ducky that connect within the reservoir through the cavity and with the ventilation drift on the center of the strip through the rock tube to reservoir drill before meeting its end-to-end cavity, and then moves into the notch the strips. Fresh vent stream is fed to the mining area along the transport passage, outgoing goes on ventilation horizon.

The closest to the essential features of the claimed invention is a method deserted dredging thin abrupt outburst and prone to rash of coal disclosed in the author's certificate SU 1788254, which includes on the floor of the field Tran the tailor (under gravity hydrotransport) drift, drilling revealing wells and maintenance of sewage treatment works in the excavation posts remotely monitor unit with delivery of extracted coal from the face hydrotransport on the field drift, and zagadki-vruby removed to a depth equal to the width of the extraction column, and then produce a collapse of the overhanging array, control the magnitude of its exposure within the excavation area. Fresh air is fed to the mining area along the transport passage, outgoing stream is diverted to the vent horizon.

The disadvantages of this method are: air leakage through the goaf, the formation of oversized and, as a consequence, saucepan wells during collapse of the overhanging coal array and problems with the delivery of coal at him, uncontrollable nature of the rock wall rock in a mining face, the limited scope of the method - resistant rock, roof and floor.

Disclosure of inventions

The technical result, which directed the claimed invention, is the elimination of air leakage through goaf, reducing clogging of coal collapsed rocks, increasing the reliability of longwall mining and safety.

This technical result is achieved due to the fact that in the way that hydraulic dredging ug is selected layers, first conduct a preparatory field develop - storey haulage and ventilation drifts with the same geodetic marks, block crosscuts and accumulating drifts with a slope under gravity hydrotransport, Buryats opening of the bore at right angles to the plane of the pasta, then hydraulically wash slotted vruby, when this story haulage and ventilation drifts are on the same geodetic elevations for the formation of the scheme of ventilation with a horizontal depression, then increase the area of the slit cuts to initiate the process of Samoobrona overhanging array in the treatment chamber, the bottom of the treatment chamber formed by the leaching of the slot cuts slant to allow accumulation collapsed coal by gravity, then collapsed coal magazineabout to control the lateral movement of rocks in the treatment the chamber and adjacent to the goaf camera separate non-load-bearing pillars, while the oversized destroy and periodically dosed unload coal mass accumulating in the roadway to ensure prodigene slaughter camera on the uprising.

Brief description of drawings

The invention is illustrated by drawings, where:

figure 1 presents the scheme of the preparation and testing of steep and inclined coal seams;

figure 2 shows a section along a-a in figure 1.

Position 1: 1, 2 - haulage and vent the air field storey drifts; 3 is a block crosscuts; 4 - field accumulating drifts; 5 - collapsed coal in the treatment chamber; 6 - opening wells; 7 - slit shear; 9 - gutters; 10 - camera primary dewatering of coal; 11 - a collection of slurry water; 12 - loading of coal in the car or on the conveyor; 13 - placona Luggage; 14 - hole on the surface

Position figure 2: 4 - field accumulating drift; 5 - collapsed coal in the treatment chamber; 6 - opening bore; 8 - jet working body; 15 - becoming filing: 16 - machine feeder working body.

The best option of carrying out the invention

The method consists in the following. On the steep and sloping prone to spontaneous combustion of coal seams conduct preparatory field production - storey haulage 1 and vent 2 drifts with the same geodetic marks, block crosscut 3 and accumulating drifts 4 with a slope under gravity hydrotransport, Buryats opening bore 6 at right angles to the plane of the pasta. Then hydraulically wash slotted vruby 7 on the seam thickness and width of the treatment chamber before the deposition of the overhanging array magazineabout collapsed mass 5 to prevent premature collapse of the wall rock, crushed oversized high-pressure jets and dosed unload the coal mass in the well 6 on accumulating drift 4 gravity hydrotransport. P and this slot vruby 7 forming the bottom of the camera slant boards for accumulation collapsed coal by gravity. Leaching slot cuts 7 are manufactured using jetting unit with the machine feed 16, becoming the feeder 15 and the working body 8 constituting trueforms device with the possibility of swinging movement in the plane of the layer and reciprocating in his power.

The working body 8 of the unit after the collapse of the overhanging array works under the dam, there are formed high-pressure jet ranged to flush slot cuts 7 and melee for the destruction of oversized.

Washing slit cuts 7, allows to obtain an overhanging array coal, which settles (has been coming down) with increasing area exposure to values exceeding the critical value, by gradually increasing the sizes of gaps along the length (power layer) and depth, and impact on an array of jet.

The exclusion of air leakage through the mined-out area is provided through the use of schemes of ventilation with a horizontal depression between storey haulage 1 and vent 2 drifts that are with the same geodetic marks. Horizontal depression between fresh and outgoing ventilation jets unlike vertical depression between them (see prototype) blocks the leakage of air through the goaf, location is the uprising of the reservoir.

To reduce clogging of the coal rock out space adjacent working chambers separated from him enclosing the entire width of 1.3 meters Clogging of the coal in the chamber to limit the application of the method of controlling lateral strains by magazynowania coal 5 after the collapse.

Scope the method is extended to the seams with side rocks unstable and secondary stability. When unstable lateral rock excavation pillars I, II, III are processed by a single camera. To increase the load accumulating on the roadway excavation posts you can work paired and triple chambers at Bokova rocks average of sustainability and sustainable, respectively.

Improving safety ensure that all work is done only in field excavations, air leaks through the goaf blocked exhaust chambers are isolated hermetic jumpers installed in the wells 6.

Way hydraulic dredging of coal seams, characterized in that the first conducting preparatory field production - storey haulage and ventilation drifts with the same geodetic marks, block crosscuts and accumulating drifts with a slope under gravity hydrotransport, Buryats opening of the bore at right angles to the plane of the pastes is, then hydraulically wash slotted vruby, when this story haulage and ventilation drifts are on the same geodetic elevations for the formation of the scheme of ventilation with a horizontal depression, then increase the area of the slit cuts to initiate the process of Samoobrona overhanging array in the treatment chamber, the bottom of the treatment chamber formed by the leaching of the slot cuts slant to allow accumulation collapsed coal by gravity, then collapsed coal magazineabout to control the lateral movement of rocks in the treatment chamber, and adjacent to the goaf camera separate non-load-bearing pillars, while the oversized crushed and periodically dosed unload coal mass accumulating in the roadway to ensure the promotion of the bottom camera the uprising.



 

Same patents:

FIELD: mining.

SUBSTANCE: system capable of using naturally reheated fluids produced from hydrothermal channels with the purpose to develop and use practically unlimited quantity of thermal energy contained in specified fluids. The system comprises the main system made of three parts: a funnel, pipe sections and any combination of several mechanical fixtures. The extracted thermal energy is used to drive steam turbines or other equipment for generation of power, which is transported to earth surface, water desalination or for any other production, requiring thermal energy. Besides, the specified thermal energy may simultaneously or separately be introduced into the extracting plant for extraction of resources in order to extract precious metals, mineral and chemical substances without system modification.

EFFECT: provision of a reliable mechanism for extraction of thermal energy from an ocean bottom and such precious resources as minerals, metals and chemical substances.

37 cl, 5 dwg

FIELD: mining.

SUBSTANCE: method includes exposure and development of reserves by open-cut method, exposure, preparation and working-out the reserves in cut edges by underground method, transportation of rock mass and maintaining protective pillars. When eliminating the front of open mining at safety distance there performed is an exposure of underground mining unit in cut edge that includes several beds. There passed are ventilation and pulp-haulage drift ways that are cut by pulp-haulage roadway, and from the surface there drilled are wells along coal beds till pulp-haulage roadway. Broken working is done from well upwards and downwards by hydraulic or drill-hydraulic methods, and pulp transportation is done by wells and pulp-transportation mines till draining complex.

EFFECT: invention allows increasing the coefficient of mineral resources extraction and reducing environmental losses.

6 cl, 2 dwg

FIELD: mining.

SUBSTANCE: method consists in mining of the deposit with wells, creation of a cavity, and destruction and change-over of mineral product to hydraulic mixture. Mixture is mixed and hollow rock is deposited at the bottom of the formed cavity; coal-water suspension is pumped out to the surface and transported via pipes to the consumer. In order to destruct mineral product, high methane content of coal beds is used; at that, methane content in the formed cavity is controlled; and when the most explosion hazardous concentration of methane, which is equal to 10%, is achieved in that cavity, explosion is initiated. After mineral product is delivered to the consumer, the whole cycle of works is repeated. In order to prevent methane ignition, its concentration is reduced to explosion hazardous one by releasing methane via wells to the surface to consumers.

EFFECT: invention allows increasing the safety and efficiency of mine works owing to using internal energy of mine rock massif.

FIELD: mining.

SUBSTANCE: method includes mining of a coal bed by chambers in an ascending order by a hydraulic method from surface and using underground mines, drilling machines, hydraulic monitors, and also a hydraulic elevator. At first a well is drilled from surface to the bed at the side of the roof, where pipes are placed for the hydraulic monitor, hydraulic elevator and methane suction, afterwards coal excavation starts in a split slot. Then another well is drilled in the produced slot along the coal bed, where pipes are installed for the hydraulic monitor and methane suction. Besides, in process of coal excavation in a chamber along bed rise with usage of underground mines the coal pulp arrives to an accumulating drift, which replaces the hydraulic elevator. At the same time methane is also sucked along the pipes to the surface.

EFFECT: wider area of method application, higher safety of minerals mining.

4 dwg

FIELD: machine building.

SUBSTANCE: method involves lifting of elements of underwater mineral deposits consisting of flow of transporting medium, transportation of hydraulic fluid in supply airlift pipeline, supply of compressed air to mixer of lifting pipeline, creation of multicomponent mixture after compressed air is supplied to hydraulic fluid mixture and transportation of multicomponent mixture flow in lifting airlift pipeline. At that, first, phantom cross section is chosen in the flow intended for transportation of elements of underwater mineral deposits, and for chosen phantom cross section there specified is the range of change of pressure value. Flows of water and air-and-water mixture are created in supply and lifting pipelines by supplying compressed air with the compressor to mixer of lifting pipeline Value of actual pressure is monitored in the chosen phantom cross section, as well as actual range of change of the monitored value is determined. Compliance of the certain actual range to the specified one is checked, and elements of underwater mineral deposits are supplied to water flow of supply airlift pipeline in case certain actual range belongs to the specified one.

EFFECT: increasing development efficiency of underwater mineral deposits at big marine depths due to shortening the total start-up time of airlift plant; avoiding the disturbance of transportation of solid material and gumming of pipelines during airlift start-up.

2 cl, 3 dwg

FIELD: mining.

SUBSTANCE: method to extract materials from thick underground formations is carried out by means of formation opening with a well, placement of a well hydraulic monitor unit in it, creation of a naturally balanced vault above a production chamber within the productive horizon and washout of formation rocks with pulp delivery to the surface. In order to increase efficiency of well hydraulic production of minerals, excessive pressure is pulled in the production chamber, which meets the following condition: Pchamb.≥Pform.+0.03 MPa, where: Pchamb. - pressure of working fluid in the production chamber, Pform. - formation pressure. At the same time the pressure in the chamber is continuously monitored with sensor installed in lower and upper parts of a movable pipe of the hydraulic monitor unit, and the excessive pressure in the production chamber is provided by control of the working fluid supply into the well, with high-quality of hydraulic insulation of the annular space with mortars based on bentonite powders with specific viscosity from 50 sec. until "non-liquid" state.

EFFECT: higher efficiency of well hydraulic production of minerals.

2 cl, 1 dwg

FIELD: mining.

SUBSTANCE: method involves mining activities performed during summer season by water jet by means of devices installed in underground cavities pre-drilled from surface of the well along longitudinal axes of pillars at certain distance from each other with pulp lifting to the surface and its supply via pulp line to flushing device in order to extract useful component and laying of dehydrated flushing remainders formed during washout process of sands so that distributed filling masses are formed. Pillar recovery is performed in two stages during two years. During the first year the pillars are recovered partially so that gaps are left between cavities washed out between them, which are developed using the same method in the next year; at that, in order to strengthen compression properties of filling masses, they are frozen with natural cold during winter period.

EFFECT: avoiding execution of underground mine workings at pillar extraction; possibility of selective development of technogenic deposit; arrangement of dehydrated flushing remainders in the worked out space and its complete use; avoiding cavings in the ground surface; recovery of rock mass continuity and stabilisation of its temperature mode; minimum contamination of environment; eliminating the necessity for execution of recreation works.

2 dwg

FIELD: mining.

SUBSTANCE: method of hydraulic borehole mining of mineral resources at inclined position of beds involves construction of hydraulic mining and auxiliary wells. Hydraulic mining and auxiliary wells are located in lines along the strike of inclined beds and cross them. Bottoms of vertical hydraulic mining wells are drilled downstream, and bottoms of auxiliary wells having vertical and inclined parts of well, the vertical part is drilled to similar inclined beds and the inclined bed enters similar productive formations, both from upper beds and within productive formations, and is directed towards hydraulic mining wells. Distance between location lines of hydraulic mining wells and auxiliary wells is determined with stability of inter-layer beds-bridges of the worked out area of loose ore beds, and distance between hydraulic mining wells and between auxiliary wells is determined with technical drilling capability of inclined branches towards hydraulic mining wells providing disintegration of loose ores between location lines of hydraulic mining and auxiliary wells of all similar beds subject to development and crossed with hydraulic mining and auxiliary wells.

EFFECT: increasing the scope of mining operations, controlling the mining volume of ore mass as to depth of hydraulic mining well, reducing the scope of construction work of hydraulic mining wells and operating equipment on mining per unit of time.

2 dwg, 2 ex

FIELD: mining.

SUBSTANCE: device includes pulp lifting pipe string with pulp removal head, which is installed inside casing string of the well, air supply pipe string with nozzle provided on its lower end, which is installed inside pulp lifting pipe string with possibility of vertical movement through the head, water supply pipe string installed inside air supply pipe string and having the outlet through side surface of suction tip. Steam supply pipe is installed in upper part of water supply pipe string; there is flange coupling on casing string and pulp lifting pipe string, which tightens those strings between each other; air supply device with two cocks and pressure gauge is installed on casing string below flange connection; inside pulp lifting pipe string there installed is additional water supply pipe string the lower end of which is located on the level of lower end of suction tip and level metre the upper end of which is passed through flange coupling and tightening device, and the jack connected to one of inner pipe strings is installed on the head cover.

EFFECT: improving development efficiency of underground reservoir in permafrost sedimentary rocks.

4 cl, 2 dwg

FIELD: mining.

SUBSTANCE: development method of underground reservoir in permafrost sedimentary rocks involves drilling of sand permafrost formation with a well, installation of process columns in it, supply of water, compressed air, heat carrier via them, development of working-out-capacity by thermal destruction of frozen rocks and air-lifting of developed hydraulic fluid of sand to the surface with water supply for weighing of deposit to the air-lift suction zone and additional water to working-out-capacity with control of water-air boundary level position by regulating the flow of supplied water. Well head is tightened and excess pressure is increased in underground reservoir by supplying compressed air to the well; during thermal destruction of frozen rocks there used as heat carrier is steam which is supplied with constant flow together with additional water; additional water flow is changed to control the water-air boundary level position, and recirculated water forming during separation of sand from lifted hydraulic fluid is supplied to weigh the deposit.

EFFECT: improving development efficiency of underground reservoir in permafrost sedimentary rocks.

1 dwg

FIELD: mining.

SUBSTANCE: method to mine mineral beds includes separation of a mined area of a mine field into mineral columns, preparation of columns by means of arrangement of area developing entries, working of columns with longwall faces equipped with mechanised complexes and dismantling of mechanised complexes in dismantling chambers after completion of actual mining in the longwall faces. If a distance between the longwall face and the location of the dismantling chamber is more than the width of the zone of high stresses that arise in front of the longwall face bottom, at the border of the mined column in front of the longwall face bottom they drive an auxiliary dismantling mine. The bed is loosened in the area that adjoins the auxiliary dismantling mine at the side of the longwall face, by means of drilling of wells in the bed. Actual mining in the longwall face is continued until the auxiliary dismantling mine is stripped with its bottomhole. At the same time the width of the zone of loosened bed in the area that adjoins the auxiliary dismantling mine at the side of the longwall face is determined from the following expression.

EFFECT: reduced costs related to dismantling of a mechanised complex, reduction of time to perform dismantling works and their increased safety.

2 dwg

FIELD: mining.

SUBSTANCE: method consists in identification of a length of active gas release zones, preparation of extraction pillars by tunnelling and strengthening mines in the rock massif, mining of extraction pillars and removal of methane in degassing wells. At the same time the length of active gas release zones is defined by variation of volume deformations of rock massif. At the same time the values of volume deformations of rock massif are produced by numerical methods on the basis of analysis of components of deformation and stress tensors with account of the time factor. The tensor characteristic is gas permeability of rocks under conditions of their natural occurrence. Medium values of rock massif gas permeability are assessed by the given mathematical expression. After determination of length of active gas release zones, with account of produced data, schemes of well drilling, their diameter and number are selected.

EFFECT: increased efficiency of methane removal, higher load at a working face and increased safety of clearing works by gas factor.

6 dwg

FIELD: mining.

SUBSTANCE: method of layer mining of thick flat coal beds includes separation of a bed into layers, separation of layers into mineral columns, mining of layers with long working faces in descending order, leaving a layer-to-layer pack, with arrangement of developing ventilation and travelling roadways of the upper layer, leaving column-to-column pillars. Preparation of the mined layer of the extracted bed is carried out in pair mines, namely, with an area ventilation mine and an unloading mine near the ventilation one, an area conveyor mine and an unloading mine near the conveyor one, and unloading mines are tunnelled without supporting, outstripping the area mines, at the same time the distance between pair mines and the value of bottomholes outstripping of the unloading mines above bottomholes of area mines is determined according to formulas.

EFFECT: increased stability and manufacturability of mines arrangement in a mined layer, reduced losses of minerals when mining lower layers.

2 dwg

FIELD: mining.

SUBSTANCE: method includes development of beds with longwalls along the strike using mechanised complexes. For this purpose during development of each underlying bed a longwall is arranged so that the remaining coal sight pillars near ventilation and conveyor drifts of the overlying bed are above the middle part of the extraction column, and extraction of coal beds is carried out in descending order.

EFFECT: higher safety of development of contiguous beds and lower labour inputs for roof management.

2 dwg

FIELD: mining.

SUBSTANCE: between sub-levels and compensating gates dividing sub-levels into mining blocks there are furnaces with slope parallel to angle of formation of caved ground in mined area relatively to the line of bed course. Ventilation roadway for ventilating the below sub-level is made after mining and forced falling of the roof at above sub-level, note that above the ventilation roadway there maintained is a protective pillar that temporary prevents rock falling. In below sub-level the roof is controlled by stepped bypassing of caved ground from the above sub-level to bottom-hole area of below sub-level, exposed for allowable passage, note that allowable passage of roof exposure in bottom-hole area of below sub-level and corresponding extended distance between the blocks in comparison to the above sub-level is defined by the expression.

EFFECT: invention allows increasing coal production efficiency.

3 cl, 9 dwg

FIELD: mining.

SUBSTANCE: method includes simultaneous coal extraction at upper and lower seams with advancing the broken working at upper seam and coal transportation to skip shaft from all longwall faces of worked-out seams of series. Penetration of vertical transportation blind pits from grouped field haul roadway to conveyor cross-cuts of all longwall faces is done at series travelling side. At series ventilation side there are vertical ventilation blind pits from grouped field ventilation roadway to ventilation cross-cuts of all longwall faces creating pyramid-shaped network of mines connected between themselves from lower to upper seam. The descending air stream from all series longwall faces is directed to ventilation bore through grouped field ventilation roadway made in the roof of upper seam. With the help of bulkheads with holes mounted in pyramid-shape network of mines there provided is a diagonal movement of air streams in the pyramid with exhaust of methane-air mixture from outgoing longwall faces and mines areas and formation of general mine ventilation air stream for extracting methane to the mine surface.

EFFECT: invention allows improving the efficiency of methane-air mixture exhaust from mine.

5 dwg

FIELD: mining.

SUBSTANCE: method consists in mining of the deposit with wells, creation of a cavity, and destruction and change-over of mineral product to hydraulic mixture. Mixture is mixed and hollow rock is deposited at the bottom of the formed cavity; coal-water suspension is pumped out to the surface and transported via pipes to the consumer. In order to destruct mineral product, high methane content of coal beds is used; at that, methane content in the formed cavity is controlled; and when the most explosion hazardous concentration of methane, which is equal to 10%, is achieved in that cavity, explosion is initiated. After mineral product is delivered to the consumer, the whole cycle of works is repeated. In order to prevent methane ignition, its concentration is reduced to explosion hazardous one by releasing methane via wells to the surface to consumers.

EFFECT: invention allows increasing the safety and efficiency of mine works owing to using internal energy of mine rock massif.

FIELD: mining.

SUBSTANCE: underground development method of the Elginsky coal deposit involves separation of the deposit into upper and lower formations, performance of paired tunnels and paired inclined working-outs, use of one branch of inclined working-outs and tunnels for coal transportation from loading points to coal-preparation plant, development of the deposit using an underground method sequentially in downstream order. Paired tunnels are performed on the lowest formation H2 of the northern deposit part to geological breakdown; cross galleries are made after geological breakdown out of tunnels transversely to the formation spread of the south-eastern part; those formations are opened with inclined shafts and worked out with a storeyed development system with coal transportation via inclined winzes and slopes to cross galleries, and then tunnels.

EFFECT: invention allows ensuring the efficiency of development of the south-eastern part of the deposit, complete extraction of coal and possibility of applying that method at any stage of the deposit development.

2 dwg

FIELD: mining.

SUBSTANCE: before the face enters the formation roof, wells are drilled towards each other on the side of extraction gates, in pairs as to formation and parallel to the support line at the distance from the well projection to the bottom of formation to the nearest point of removal chamber, which is equal to 0.7-0.8 of periodic step of convergence of the main roof; they are charged and blasted after the support line, by means of which a support is created on the side of worked-out space for a hanging plate of the main roof throughout the length of face by using the roof rocks fallen during blasting operations. Coal pillar arranged between mechanised support and removal chamber is provided with artificial flexibility and extracted under protection of the plate of the main roof, which is borne against the rocks fallen during the well blasting operations. The specified artificial flexibility is provided for the pillar by drilling from removal chamber of wells at the formation roof towards the face.

EFFECT: considerable improvement of safe operations at entry of the complex into removal chamber in wide range of conditions of coal beds occurrence.

2 cl, 3 dwg

FIELD: mining.

SUBSTANCE: as face advances from special chambers passed above preparatory minings on the side of extraction galleries there drilled opposite each other are wells parallel to formation at the distance from lower plane of the main roof to wells, which is determined by the following formula: Lllr=l3(1+√Kl) / (Kl -1), where Kl - rock loosening coefficient of the main roof at their blasting with loosening; l3 - distance from the main roof to fallen rocks, m; lllr - line of least resistance of blasting cone, m. Then, they are charged and blasted after the support line in the worked-out space. At each explosion there created is support from roof rocks fallen out of funnels throughout the face length, by means of which free falling of main roof, which is torn by explosion, is prevented.

EFFECT: considerable increase in mining of gas-bearing formations by means of mechanised complexes in wide range of coal bed in bedding zone of coal formations.

4 dwg

FIELD: mining industry.

SUBSTANCE: method includes driving of layer transporting and ventilation mines along soil and ceiling of bed, in massive and in extracted space, cutting of cleaning mines in cross-section of bed at angle of 27°, mechanized delivery of coal along bed mines to coal furnaces and vertical dropping of coal to furnaces. Extraction of slanted transverse bed is performed along bed diagonals having direction to horizon at angle of 27°, to provide for free sliding of coal without degradation. Delivery of coal from cleaning mine placed at angle of 60° to layer mine, to back field mine is performed by self-delivery from any place of extraction field along layer mine, field coal-lowering mine and field slanting coal furnace, being at angle of 27° to horizon. Field slanted coal furnaces are placed at distance from one another along 20 m normal. Field coal mines in form of fans of three mines are connected on field slanted coal furnaces at distance of fan start from one another of 60 m with output of mines ends to each layer mine of group of three above-lying slanted-transverse layers for whole diagonal length of extraction field at distance between mines outputs along layer soil of 60 m. Ceiling of cleaning mines may be supported without load, utilizing mechanical traction on the side of ventilation furnaces for pressing moveable support tool to layer ceiling.

EFFECT: higher efficiency.

2 cl, 3 dwg