Method for coupling of floating caisson, having funnel-shaped foundation-shells, with base

FIELD: construction.

SUBSTANCE: method for coupling of a floating caisson, having funnel-shaped foundation shells, with a base (also with unprepared bottom of a water area), includes fixation of the design position of the floating caisson by means of its installation onto mounting supports or piles and filling with a material of artificial base into internal cavities of the funnel-shaped foundation shells. Actions of base protection (including an artificial one) are implemented from washing with flows of water that washes it.

EFFECT: increased reliability and durability of a base in a floating caisson, increased manufacturability: its coupling with a base.

7 cl, 1 ex, 1 tbl, 6 dwg

 

The invention relates to the construction and hydraulic engineering construction, namely the floating method of construction, and can be used to pair floating floating caissons with unprepared bottom waters.

In construction and hydraulic engineering is commonly called the Foundation part of the building, transmitting force from this building to the ground. Exactly the same meaning has the term "Foundation" ("the Foundation-shell", "funnel Foundation-shell") in this document: the Foundation of the floating array-giant is part of a floating array of giant, transmitting force from this array-giant on the ground. When this is not essential, as it is implemented communication Foundation with the rest of the facilities: fully tight coupling or connection with the hinges. The term "array-giant" is used interchangeably with "floating array-giant"and "unprepared bottom waters" or "the bottom of the waters" is a special case of "reason". The term "artificial ground" is used to refer to material placed in the pairing process array-giant with bottom waters and located in the space between the bottom surface waters and the contact surface (sole) of the basement membrane. Pair of array-giant prepared in one or neustupny (aligned bed, bed without rownania surface, the local dumping, dumping on the perimeter, etc.) bottom waters should be considered equivalent to the pair of array-giant unprepared with the bottom of the waters, because this circumstance does not prevent the achievement of new technical results and does not change the essence of the proposed method. After pairing with the base floating array-giant is a stationary structure.

Pontoon construction method compared with the traditional (for jumpers) provides a significant reduction in the consumption of concrete, relief structures, the transfer of the most difficult works in the industrial conditions of the construction base and accelerate the pace of construction. One of the major problems in the construction of floating structures method remains the problem of pairing floating floating caissons with bottom waters. Particularly attractive compared to other options such as, for example, the method standpipe wells, underwater concreting, the installation of pile foundations, using props, development and dredging of bottom waters and others, it seems the solution to this problem using floating floating caissons, are equipped with a funnel-shaped foundations-shells, the inner cavity of which is filled with ground material, subsequently performing the functions of art is public grounds. Funnel Foundation-shell is a generally vertically oriented shaft wirausaha to the bottom of the closed cross-sectional mostly rectangular or square shape with two holes, one of which is located in the upper part and is used for loading of soil material, and the other below, is intended to ensure contact of the artificial soil Foundation with bottom waters (natural basis). Such foundations is relatively new and the technology of production work on the device of their bases have not received their proper development.

There is a method of pairing a floating array of giant, having a funnel-shaped basement membrane, with unprepared bottom waters, implemented in the project cut-off dam French PES Organon and Lancieux [Tidal power plant / Lberman, Vincilaan, Selver and others; under the editorship of Dr technology. Sciences Lbergman. - M.: Energoatomizdat, 1987. - 296 S.; RIS, g]. The method of pairing a floating array of giant, having a funnel-shaped basement membrane, with bottom waters includes fixation floating array-giant in the project situation by introducing it in the bottom waters and filling the internal cavity of the funnel-shaped Foundation-shell riprap.

Not what ATAC solutions is the need of the implementation of the array in the soil (decompression method) for fixing its design position, that increases the complexity and cost of works.

Known chosen as the prototype of a way of pairing floating array of giant, having a funnel-shaped foundations-shell, with unprepared bottom waters proposed for the project North PES in the Long lip of the Barents sea [log C.t.s. No. 4 on October 25, 2011 / article "Two varint technology pairing floating floating caissons with unprepared bottom waters and the complex of measures on optimization of the design decisions of the cutting dam North PES", Fig.2, and /Baranov A.V./ pdf see on the website hydroteh.ru]. The method of pairing a floating array of giant, having a funnel-shaped foundations of the shell base includes fixing the design position of the array-giant by its mounting pillars or piles and filling material artificial establishment of the internal cavities of the funnel-shaped foundations-shells.

The disadvantage is the lack of measures to protect the base (including artificial) from erosion by the streams of wash water.

The present invention is to improve the reliability and durability of the Foundation of the floating array of giant, having a funnel-shaped foundations-shell, as well as increasing the efficiency of pairing it with the base through the implementation of activities sewn basis of the project from erosion by the streams of wash water (flow, wind-driven waves, increased flow rate when the overlap of the closure channel and so on).

The object of the invention is a method of pairing a floating array of giant, having a funnel-shaped foundations of the shell base (including unprepared bottom waters), including the fixation of the design position of the array-giant by its mounting pillars or piles and filling material artificial establishment of the internal cavities of the funnel-shaped foundations-shells, wherein implementing protection grounds (including artificial) from erosion by the streams of wash water.

The proposed solution allows to increase the reliability of reason at the expense of protecting it from erosion.

The invention has development (refinement), consisting in that the internal cavity of the funnel-shaped foundations-shells are filled with material of the artificial base, non-blurry streams of wash water. This allows to significantly improve the manufacturability protect the base from erosion.

The invention has the second development (refinement), consisting in that the internal cavity of the funnel-shaped foundations-shells are filled with material of the artificial base eroded by the streams of wash water, but form smoothmuscle. This allows to significantly improve technologic is here to protect the base from erosion, and also use the artificial material of the base is relatively small fraction (for example, sand and gravel).

The invention has the third development (refinement), consisting in the fact that the attachment base of the erosion produced to fill the internal cavities of the funnel-shaped foundations of shell material of the artificial base. This helps protect against washout base in the vicinity of the array of the giant.

The invention has a fourth development (refinement), consisting in the fact that the attachment base from erosion produce to the level not lower than the lowest point of the foundations of the wrapper array-giant. This helps protect against washout base in the vicinity of the array of giant, as well as to use the material of the artificial base, unstable against its erosion. This can be especially useful if you need to select the material of the artificial base, on the basis primarily of its deformation and strength properties in the case when you need it the crushing weight of the array-giant to increase the degree of filling the internal cavities of the foundations of the wrapper, as well as the absence in the construction area of sufficient number and capacity fields of materials larger fraction.

The invention has the fifth development (refinement), consisting in the fact that for fastening the basis of the project from erosion occiput protective layer (or multiple layers, including different fractions) of the riprap. This allows the use of well-tested and used (classic) option protecting foundations from erosion.

The invention has the sixth development (refinement), consisting in the fact that for attaching the base from erosion stack and fix the flexible mats (including concrete, Reno mattresses and the like). This improves the adaptability and speed of production work to protect the Foundation from erosion.

The use of the proposed solution allows to achieve new technical results compared to the prototype. A causal relationship between the set of essential features of the claimed object and achievable technical results are given in table 1 (see below). The essence of the proposed method is illustrated by drawings:

- figure 1 shows a cross section of a floating array of giant, having a funnel-shaped foundations of shell, fixing in which the project location is provided to be installed on the piles (or mounting supports), and the protection of the artificial base from erosion provided with filling material of the artificial base, non-blurry streams of wash water or washing away, but forming smoothmuscle;

- figure 2 shows a cross-section of a floating array of giant, with noncooperative foundations-shell, fixing the design position which has to be installed on the piles (or mounting supports), and the protection of the base and the artificial base from erosion provided by the filling of the protective layer of riprap;

- figure 3-6 shows the phases of the pair of floating array of giant, having a funnel-shaped foundations-shell, with unprepared bottom waters.

The proposed method is as follows (see figure 2). Floating array of giant, having a funnel-shaped Foundation-shell (1), fixed in a project position with the mounting supports (2)to protect the foundations from erosion occiput protective layer of non-blurry riprap (3), fill the inner cavity of the funnel-shaped Foundation-shell (1) soil material of the artificial base (4). If necessary, provide for the crushing of material to substrate weight array giants, including application of vibration (for this purpose, in addition use vibrators and the like).

Enablement of the claimed invention is shown in the following example.

Example No. 1. Pair with unprepared bottom waters floating array of giant, having a funnel-shaped foundations-shell.

Work produced in the following way (see figure 3-6). Floating array-giant in the region have the funnel foundations-shell, positioned above the place of its installation on the bottom, usually with the help of the tug fleet. Then lower mounting supports array-giant to realize their reliable contact with the bottom and ballasteros an array of giant reaches the design position. After the generate fastening of the base of the array-giant from erosion by dumping non-blurry riprap and fill the inner cavity of the funnel-shaped foundations of shell material of the artificial base (non-cohesive soil). In the end produce the ballasting array-giant for its settlement sustainability.

In the same way can be implemented pairing with unprepared bottom waters other floating floating caissons similar design: transmission towers, monuments, piers, blocks dams PES (pvas and Wales), thrust blocks of fixed offshore platforms and other

Note:

1. In the article "Two variants of technology pairing floating floating caissons with unprepared bottom waters and the complex of measures on optimization of the design decisions of the cutting dam North PES" (Ukr. C.t.s. No. 4, 2011) describes a floating array of giant managed Foundation-shell (see Fig.2, b), for which substrate protection from erosion perform similar to the solution described in this application. Thus, in particular, in figure 4, and zobrazen the artificial material of the base, non-blurry streams of wash water or washing away, but forming smoothmed, and figure 8 shows the mounting base with the filling of the protective layer of riprap (sea side).

Table 1.
A causal relationship between the set of essential features of the claimed object and achievable technical results
A new technical result is compared with the prototypeIndicatorsHallmark (improved performance)
PrototypeObject
inventions
1234
Improving the reliability and durability of the Foundation (including artificial).There are no events protect the base from erosion by the streams of wash water. Require periodic repair and restoration of the grounds.Implement measures to protect the base from erosion by the streams of wash water. Does not require what is repair and restoration of the grounds. Implement measures to protect the base from erosion by the streams of wash water: occiput protective layer of riprap; stack and fix the flexible Mat; use non-blurry artificial material grounds or washed away, but forming smoothmuscle and other
Increasing processability pair of giant array with the base.There are no events protect the base from erosion by the streams of wash water. Work is possible under favorable weather conditions and stops currents.Implement measures to protect the base from erosion by the streams of wash water. Works practically does not depend on weather conditions and current velocities.Mount the base of the erosion produced to fill the internal cavities of the funnel-shaped foundations of shell material of the artificial base.

1. The method of pairing a floating array of giant, having a funnel-shaped foundations of the shell base (including unprepared bottom waters), including the fixation of the design position of the array-giant by its mounting pillars or piles and filling material artificial Foundation internal Palast the second funnel foundations-shells, characterized in that the implementing protection grounds (including artificial) from erosion by the streams of wash water.

2. The method of pairing a floating array of giant, having a funnel-shaped foundations-shell, with the base according to claim 1, characterized in that the internal cavity of the funnel-shaped foundations-shells are filled with artificial material base, non-blurry streams of wash water.

3. The method of pairing a floating array of giant, having a funnel-shaped foundations-shell, with the base according to claim 1, characterized in that the internal cavity of the funnel-shaped foundations-shells are filled with artificial material base eroded by the streams of wash water, but form smoothmuscle.

4. The method of pairing a floating array of giant, having a funnel-shaped foundations-shell, with the base according to claim 1, characterized in that the fastening base of the erosion produced to fill the internal cavities of the funnel-shaped foundations of shell material artificial grounds.

5. The method of pairing a floating array of giant, having a funnel-shaped foundations-shell, with the base according to claim 4, characterized in that the fastening base from erosion produce to the level not lower than the lowest point of the foundations of the wrapper array of the giant.

6. The method of pairing PL is vucago array-giant having a funnel-shaped foundations-shell, with a basis according to any one of claims 1 to 5, characterized in that for fixing the foundations from erosion occiput protective layer (or several layers, including different fractions) of riprap.

7. The method of pairing a floating array of giant, having a funnel-shaped foundations-shell, with a basis according to any one of claims 1 to 5, characterized in that for fixing the foundations from erosion stack and fix the flexible mats (including concrete, Reno mattresses and the like).



 

Same patents:

FIELD: construction.

SUBSTANCE: shallow-draught self-lifting floating plant comprises a body with an upper deck, a bottom, side walls and supports with lifting mechanisms. Along all or a part of side walls outside the body from the bottom level there are floatage compartments not reaching to the upper deck.

EFFECT: provision of maximum increase of floatage of a plant with minimum increase of its mass, which makes it possible to minimise subsidence of a plant for its operation in shallow areas.

4 dwg

FIELD: oil and gas industry.

SUBSTANCE: group of inventions refers to designs and formation methods of ice-resistant drilling facilities for development of shallow marine continental shelf. Drilling facilities include a self-lifting floating drilling rig with a cantilever, which has a housing and supports, at least one of which is ice-resistant, as well as drilling platform facilities with an ice-resistant housing, which can be installed in a fixed manner at the sea bottom and has upper superstructure for arrangement of equipment. Housing of the drilling rig is equipped at least with two retractable slides oriented towards the drilling platform facilities and mounted so that they can be moved in horizontal plane to transfer the load from the rig housing by means of the above slides to the drilling platform facilities. In the drilling platform facilities housing there are seats corresponding to retractable slides of the self-lifting floating drilling rig. Ice-resistant support of the drilling rig is mounted so that it can be borne against the soil to transfer the load to the sea bottom. The rest supports of the rig are non-ice-resistant and mounted so that they can be lifted above the rig housing after the load transfer from the housing through the drilling platform facilities and ice-resistant support to the sea bottom.

EFFECT: improving reliability at simplifying the design of the facilities, as well as enlarging its operating capabilities by installing the facilities in shallow water.

4 cl, 10 dwg

FIELD: construction.

SUBSTANCE: ice-resistant monopod self-rising floating drilling rig has a support base and an upper body with a sliding console and a drilling tower, mounted as capable of vertical displacement by means of climbing the support pillar, firmly attached with the support base. The support pillar of the rig is arranged as transparent. The diameter of the specified support pillar makes at least 0.25 and not more than 0.3 of the support base diameter. To protect the drilled well against ice impact, the rig is equipped with a protective pillar, mounted in the space under the drilling tower with the possibility of deepening into soil and attached with the upper end to the upper body of the rig. For the possibility to evacuate the well upon completion of drilling, in the stern part of the support base there is an opening. The protective pillar is fixed with the upper end to the upper body of the rig by means of the bracket mounted on the latter.

EFFECT: invention makes it possible to increase reliability of a structure under conditions of freezing water areas, in soils with low bearing capacity.

2 cl, 5 dwg

FIELD: construction.

SUBSTANCE: complex comprises an ice-resistant support base, made of water-displacing sections, and a superstructure mounted on the support base as capable of vertical displacement along support pillars arranged in the form of an autonomous self-rising floating drilling rig, comprising a body, support pillars with a mechanism of rising and a drilling tower. The support base is made as composite of the support and ice-breaking parts, besides, the ice-breaking part is made as capable of placement and joining with the upper part of the support part of the base under the bottom of the self-rising floating drilling rig installed on the support part. The rig body is installed as resting along the perimetre onto the ice-breaking part of the base for provision of minimum body sagging in its middle part. The method includes manufacturing, transportation and installation of an ice-breaking drilling complex for developing a shallow continental shelf.

EFFECT: higher reliability and safety of complex design and method of its establishment.

4 cl, 7 dwg

FIELD: process engineering.

SUBSTANCE: method of fitting said body in unequipped bottom comprises filling inner cavities of said funnel-like shell beds with soil material. Said body is fixed in design position by installing it on mounting supports.

EFFECT: practically feasible installation, decreased labor input and material input.

2 cl, 9 dwg, 1 ex

FIELD: construction.

SUBSTANCE: invention relates to hydraulic engineering construction of structures and may be used for year-round drilling under conditions of the Arctic shelf. The platform comprises a bottom ballasted plate with an inbuilt support unit and a superstructure. The bottom plate is made in the form of an upper part, a lower part and a sliding sectional support unit of telescopic type. The support unit comprises telescopic sections that are separated at the installation point with a sliding mechanism. Telescopic sections, the sliding mechanism and all required auxiliary devices are installed in sluice compartments. All telescopic sections are of identical height, cylindrical or prismatic shape, and comprise guide slots on the inner and outer surface. Inner and outer cuts of the sections are selected for each other so that arrangement of sections is provided within each other with a gap sufficient for sliding and sealing of sections along the section guides relative to each other, in accordance with the telescope principle. The lower section's cut is larger than the upper one's. Sections of the support unit are arranged in a reinforced ice version. The invention also discloses methods of transportation, assembly and disassembly of a self-lifting mobile ice-resistant drilling platform of telescopic type.

EFFECT: increased reliability of a platform, lower labour intensiveness of methods of its transportation, assembly and dismantling.

13 cl, 3 dwg

FIELD: construction.

SUBSTANCE: shoe comprises a body and a unit of shoe attachment to a support pillar. It has zero or positive buoyancy and is arranged as capable of changing zero or positive buoyancy to buoyancy of a low negative value. The shoe body comprises a hole for stretching of a support pillar, besides, the specified hole is arranged in the centre of the shoe and comprises vertical guide slots for interaction with racks of the support pillar. The unit of shoe attachment to the support pillar comprises two stops, every of which is equipped with a guide sleeve placed in a body, a sliding block installed in the guide sleeve, and a manual drive to move the block in the guide sleeve.

EFFECT: simplified assembly of a shoe to a pillar.

11 cl, 5 dwg

FIELD: machine building.

SUBSTANCE: proposed system comprises foundation 12, hydroelectric turbine 10 to rest on said foundation 12, and afloat sea ship 14 that allows detachment of said foundation. Ship 1 allows detachment of foundation 12 and its lowering, and/or lifting to position right under the ship, and its attachment to ship. Foundation 12 comprises support 32 to pass upward through ship 14 when foundation 14 is attached to ship from below. Ship 14 has opening 30 for foundation 32 to pass through when foundation 12 is mounted under ship 14 to allow turbine 10 mounted on support 32 to pass there through.

EFFECT: simplified mounting.

13 cl, 7 dwg

FIELD: construction.

SUBSTANCE: superstructure is built on a building slip in a dock on a support deck installed on side walls of the dock. A transport barge that has taken the ballast is introduced into the dock under the superstructure, and the superstructure is installed by means of ballast pumping away from the barge on its deck with its subsequent transportation to a marine oil and gas field. A hydraulic engineering pocket is arranged in place of installation of a support part of a marine oil and gas production facility on the marine oil and gas field. Length, width and depth of the latter make it possible to lead the transport barge to the support part, to install the superstructure onto the support part after taking the ballast by the transport barge, and also to move the transport barge away from the marine oil and gas field after pumping of ballast from it.

EFFECT: invention makes it possible to eliminate using additional crane facilities for transportation and assembly of a superstructure of marine oil and gas production facilities onto a transport barge, and possibility to exclude construction of a marine channel for passage of a transport barge to an oil and gas field in shallow waters.

16 dwg

FIELD: construction.

SUBSTANCE: method to install a platform support block provides for support block transportation, its submersion to the sea bottom and installation onto soil. Ballast reservoirs are used during transportation. Ballast reservoirs are inner cavities of structure elements. During installation the first installation unit is ballasted down. The shaft is put into vertical position. Its eyes are brought to the level above sea surface. Spacers are ballasted to ensure hinged connection of their eyes with eyes of the vertical shaft. The ballast is pumped from the support ring pontoons and/or radial spacers and/or vertical shaft. Spacer ends are put in contact with the support ring due to slight surfacing up of the first installation unit. Spacers are rigidly fixed. Assembly pontoons are ballasted. Its lowering to the prepared bottom section is provided.

EFFECT: simplicity of structure installation, possibility of serial construction, high repairability and possibility of re-equipment in the dock.

6 dwg

FIELD: mechanics.

SUBSTANCE: device for anchoring floating structures incorporates mooring bar with ends furnished with the appliance to turn the aforesaid rod about its axis of rotation. At that the rod free end is provided with a sleeve letting the chains or cable to pass there through. The anchor chain passed through one of the aforesaid sleeves is fastened at one end faces of the said floating structure. Besides that, to up the structure stability, the proposed device can be furnished with links connecting the free ends of both mooring rods to the structure in question.

EFFECT: anchoring system causing no floating structure trim difference and providing for stable positioning with minor drift, reduced distance between anchor and floating structure.

11 cl, 15 dwg

FIELD: mining.

SUBSTANCE: system for stabilisation of sea platform mounted of gravitation foundation and anchored at sea bottom consists of multitude of sets of upper blocking elements installed on keel at lower part of platform, of great number of caissons installed at sea bottom, of great number of removable insertions each installed in each of caissons and of set of lower blocking elements in each insertion. Each set of the lower blocking elements is designed to engage with one of sets of the upper blocking elements by means of block system, when the keel is set above caissons. Insertions correspond to a tight attached to the keel cementing material pumped into insertions through the keel. The system stabilises the platform relative to forces of lateral shear and also facilitates easy removal of the platform off the caissons with insertions attached to the keel by applying upper lifting force. Further the platform can be transported and mounted of the second set of caissons arranged at the second site of sea bottom.

EFFECT: group of inventions facilitating mounting of platform ensuring good resistance to lateral shear forces and eliminating difficult and expensive operations for installation of shear skirts.

19 cl, 9 dwg

FIELD: construction industry.

SUBSTANCE: installation method of bottom complex for performing works on shelf involves assembly of tower erected on the ground and consisting of cone- and taper-shaped sections mounted in series on foundation base with sealing skirt embedded in bottom. Foundation base is installed with hoisting winches and ropes on water-borne vehicle and transported to installation site. Foundation is lowered with coordinated rope movement to bottom. Complex is built up with sections as to height which is more than depth of complex installed on bottom of water area. Vertical position of longitudinal axis of complex is ensured with simultaneous operation of jacks and vibrators arranged on external side along the perimetre of the base. Internal volume of tower is dried. Removal method of bottom complex involves filling of internal tower volume with water. Water-borne vehicle is submerged by means of method of ballast water into tanks. Sag of ropes is chosen with hoisting winches and they are fixed. Ballast water is pumped from tanks. Vibrators and jacks are activated simultaneously till skirt of foundation completely comes out of bottom ground. Complex is transported to new installation place. Complex of equipment includes tower to be installed on ground, and water-borne vehicle. Tower has foundation base with enlarged surface area and sealing skirt, hollow housing with cross section decreasing as to height so that upper section of housing installed on the ground is located above water level. Water-borne vehicle has two hinged housings equipped with tanks, and ballast water receiving and discharge systems.

EFFECT: providing reliable installation of complex on unprepared bottom ground, stability of complex at lateral loads with no anchors available.

10 cl, 3 dwg

FIELD: transport.

SUBSTANCE: invention relates to sea oil extraction platforms. Proposed SPAR platform 200 comprises hull 2202 with central hast 204. Air- and watertight partition 210 runs across central shaft to make variable-buoyancy compartment 220 in central shaft. In compliance with some versions, central shaft bottom is exposed in sea, while in compliance with other versions, central shaft bottom is sealed. At least one pipe 224 to house riser 227 runs through partition and said variable-buoyancy compartment. Said pipe has exposed top face to allows drainage of water accumulated in central shaft to make air- and watertight seal in joint with bulkhead. In some versions, two or more air- and watertight partitions 206, 208, 210 are arranged across central shaft to form one or more air- and watertight ballast tanks 216, 218 arranged fixed between every adjacent pair of bulkheads.

EFFECT: increased platform buoyancy due to its adjustment by central shaft.

16 cl, 4 dwg

FIELD: construction.

SUBSTANCE: ice-resistant support block of a marine engineering facility comprises a cylindrical shaft, a support unit and supporting braces. The shaft is made as hollow. The shaft is hingedly connected to supporting braces. The support unit comprises a support ring. The support ring is formed by at least three rectilinear pontoons. Pontoons are rigidly connected by their ends. The support ring is rigidly fixed to the cylindrical shaft by hollow radial spacers. Supporting braces are rigidly connected to the support ring by lower ends. Pontoons of the support ring, radial spacers, a cylindrical shaft and hollow supporting braces are made as capable of their floatability adjustment from positive to negative one.

EFFECT: invention provides for the possibility of serial construction, reduced labour intensiveness of installing a support block on site and its removal from soil, high repairability and capability of re-equipment in the dock.

8 cl, 6 dwg

FIELD: construction.

SUBSTANCE: method to install a platform support block provides for support block transportation, its submersion to the sea bottom and installation onto soil. Ballast reservoirs are used during transportation. Ballast reservoirs are inner cavities of structure elements. During installation the first installation unit is ballasted down. The shaft is put into vertical position. Its eyes are brought to the level above sea surface. Spacers are ballasted to ensure hinged connection of their eyes with eyes of the vertical shaft. The ballast is pumped from the support ring pontoons and/or radial spacers and/or vertical shaft. Spacer ends are put in contact with the support ring due to slight surfacing up of the first installation unit. Spacers are rigidly fixed. Assembly pontoons are ballasted. Its lowering to the prepared bottom section is provided.

EFFECT: simplicity of structure installation, possibility of serial construction, high repairability and possibility of re-equipment in the dock.

6 dwg

FIELD: construction.

SUBSTANCE: superstructure is built on a building slip in a dock on a support deck installed on side walls of the dock. A transport barge that has taken the ballast is introduced into the dock under the superstructure, and the superstructure is installed by means of ballast pumping away from the barge on its deck with its subsequent transportation to a marine oil and gas field. A hydraulic engineering pocket is arranged in place of installation of a support part of a marine oil and gas production facility on the marine oil and gas field. Length, width and depth of the latter make it possible to lead the transport barge to the support part, to install the superstructure onto the support part after taking the ballast by the transport barge, and also to move the transport barge away from the marine oil and gas field after pumping of ballast from it.

EFFECT: invention makes it possible to eliminate using additional crane facilities for transportation and assembly of a superstructure of marine oil and gas production facilities onto a transport barge, and possibility to exclude construction of a marine channel for passage of a transport barge to an oil and gas field in shallow waters.

16 dwg

FIELD: machine building.

SUBSTANCE: proposed system comprises foundation 12, hydroelectric turbine 10 to rest on said foundation 12, and afloat sea ship 14 that allows detachment of said foundation. Ship 1 allows detachment of foundation 12 and its lowering, and/or lifting to position right under the ship, and its attachment to ship. Foundation 12 comprises support 32 to pass upward through ship 14 when foundation 14 is attached to ship from below. Ship 14 has opening 30 for foundation 32 to pass through when foundation 12 is mounted under ship 14 to allow turbine 10 mounted on support 32 to pass there through.

EFFECT: simplified mounting.

13 cl, 7 dwg

FIELD: construction.

SUBSTANCE: shoe comprises a body and a unit of shoe attachment to a support pillar. It has zero or positive buoyancy and is arranged as capable of changing zero or positive buoyancy to buoyancy of a low negative value. The shoe body comprises a hole for stretching of a support pillar, besides, the specified hole is arranged in the centre of the shoe and comprises vertical guide slots for interaction with racks of the support pillar. The unit of shoe attachment to the support pillar comprises two stops, every of which is equipped with a guide sleeve placed in a body, a sliding block installed in the guide sleeve, and a manual drive to move the block in the guide sleeve.

EFFECT: simplified assembly of a shoe to a pillar.

11 cl, 5 dwg

FIELD: construction.

SUBSTANCE: invention relates to hydraulic engineering construction of structures and may be used for year-round drilling under conditions of the Arctic shelf. The platform comprises a bottom ballasted plate with an inbuilt support unit and a superstructure. The bottom plate is made in the form of an upper part, a lower part and a sliding sectional support unit of telescopic type. The support unit comprises telescopic sections that are separated at the installation point with a sliding mechanism. Telescopic sections, the sliding mechanism and all required auxiliary devices are installed in sluice compartments. All telescopic sections are of identical height, cylindrical or prismatic shape, and comprise guide slots on the inner and outer surface. Inner and outer cuts of the sections are selected for each other so that arrangement of sections is provided within each other with a gap sufficient for sliding and sealing of sections along the section guides relative to each other, in accordance with the telescope principle. The lower section's cut is larger than the upper one's. Sections of the support unit are arranged in a reinforced ice version. The invention also discloses methods of transportation, assembly and disassembly of a self-lifting mobile ice-resistant drilling platform of telescopic type.

EFFECT: increased reliability of a platform, lower labour intensiveness of methods of its transportation, assembly and dismantling.

13 cl, 3 dwg