Method to pour concrete mixture under process equipment at final stage of its assembly

FIELD: construction.

SUBSTANCE: method to pour a concrete mix under process equipment at the final stage of its assembly includes installation of a curb along the foundation contour and an accumulating tray with submersible vibrators included in it. Vibration treatment of the concrete mixture in the process gap between the equipment stand and the foundation is carried out on the entire way of its movement from the accumulating tray to the vibration shell by means of rods placed along the entire area of pouring, ends of which are fixed in a rigid vibration shell, located at the equipment side opposite to the accumulating tray.

EFFECT: higher efficiency of works due to less time spent to fill a process gap with a concrete mix, provision of even distribution of density of a concrete mixture along entire area, higher strength of poured concrete, no limitations in dimensions and configuration of equipment in plan.

2 cl, 1 dwg

 

The proposed method relates to the field of installation of technological equipment and can be used in the gravy concrete mix for equipment.

Known methods gravy concrete mix under technological equipment by vibrating transportation using webroot.com or vibratory feeders (see Usebility, Assurance. Concrete work. - Kiev: Budivelnik, 1977. - P.59).

The disadvantages of these methods are the need to use bulky equipment, the inability to ensure uniform compaction of the concrete mix over the entire area fill space.

The closest technical solution of the present invention is a method gravy concrete mix under technological equipment (sit 188-68 MMS the USSR "Instructions besplatna installation of equipment for the chemical industry / Central Bureau of technical information. - M., 1968), including formwork Assembly along the contour of the Foundation, installation leaning on the Foundation of the tray of the drive, having in its composition immersion vibrators, vibrating treatment of the concrete mixture in the tray of the drive.

The disadvantages of this method are the limited technological capabilities, i.e. low velocity of propagation of the concrete mixture in the gap between the frame of the equipment and the fundamental is the fact that the impossibility of a uniform supply of concrete mixture over the entire area add space for large size equipment.

Task to be solved by the present invention is directed, is the expansion of technological possibilities of using the method of gravy concrete mix under processing equipment due to the vibration treatment of the mixture over the entire area of the technological gap between the base part mounted equipment and the Foundation for increasing the mobility of the mixture and to achieve the necessary uniformity of the density of the concrete in polivoces space.

The invention consists in that the way the gravy concrete mix under processing equipment includes forming the contour of the base and tray-drive by its constituent immersion vibrators and vibrating treatment of the concrete mixture all the way of its movement in the gap by hosting the rods at a distance of 200-300 mm from each other, the ends of which are fixed in a rigid vibraimage located on the opposite side of the tray-drive side hardware, with the axis of the rods are parallel to the direction of movement of the concrete mixture.

Method pour the concrete mix under technological equipment at the final stage of installation is illustrated cher the hedgehog, which figure 1 - is a perspective view of the method.

Method pour the concrete mix under technological equipment is carried out as follows. At a certain distance from the frame mounted and balanced from the point of view of accuracy of the installation equipment 1 collect the casing 2, with the upper level must be above the level of the supporting part of the frame 8. Next, over the entire area of the space between the Foundation and the equipment place the rods 5 in increments of 200-300 mm, Then on one side of the equipment supported on the base 5 is mounted a receiving tray drive with 3 included in its composition immersion vibrators 4. On the opposite side of the tray-side equipment set hard wibrobia 7, in which are fixed the ends of the rods. With the yoke rigidly connecting the vibrator 9, through which it informs the terminals of the longitudinal oscillations of 10 (in a plane parallel to the horizontal surfaces of the frame and Foundation). Then start feeding the concrete mix 6 in the tray storage with simultaneous inclusion of immersion vibrators in the tray, and then the vibrator is located on the holder. Flow are continuously maintaining a constant level of the mixture in the tray above the level of the supporting part of the base equipment. The flow stops when the concrete mix on the opposite side of the tray-side technology for the ora, and mark the surface of the concrete mix should be above the level of the supporting part of the equipment. After cessation of the concrete mix continue vibrating rods until a desired density of the concrete in the technological gap. Then disconnect the vibrator, remove the clip, remove the tray drive with immersion vibrators. The rods are left in the body of concrete gravy that when mass transfer equipment through the gravy on the Foundation perform the role of reinforcement.

The proposed method has the following advantages over the known solutions:

- ability to pour concrete mix under processing equipment in all sizes and configuration to the plan;

- increase productivity by reducing time to fill the technological gap with concrete due to the vibration treatment of the entire volume of concrete mix in the gap;

- uniform distribution of density of the concrete mix over the entire area of gravy;

- increase the strength of concrete gravy due to its reinforcement rods.

1. Method pour the concrete mix under technological equipment at the final stage of its installation, including the installation of a casing along the contour of the base and tray-drive by its constituent immersion vibrators, characterized in that the vibration is th treatment of the concrete mixture in the technological gap between the frame and Foundation are all the way of its movement from the tray drive to wyprobujmy through rods, spread over the entire area of the gravy, the ends are fixed in a rigid vibraimage located on the opposite side of the tray-drive side hardware.

2. Method pour the concrete mix under technological equipment at the final stage of the installation according to claim 1, characterized in that the rods are placed in increments of 200-300 mm along the direction of movement of the concrete mix.



 

Same patents:

FIELD: construction.

SUBSTANCE: device is arranged so that a telescopic delivery device is made as capable of aiming at the required elevation of an erected structure by means of a hydraulic cylinder, delivery of a supply hose connected with the last link of the telescopic delivering device, to a higher elevation, by creation of an excessive volume of consistent material in it under action of an auger loader and a closed roller valve on the supply hose, delivery of a consistent material for needs of this elevation; delivery of a supply hose to a lower elevation, by squeezing of an excessive volume of consistent material from the telescopic delivering device with the closed roller valve of the supply hose under action of a hoist and a reversed auger loader; delivery of a consistent material for needs of the above elevation with the roller valve open on the supply hose and the auger loader connected for normal operation.

EFFECT: higher efficiency during its operation.

1 cl, 1 dwg

FIELD: transport.

SUBSTANCE: invention relates to construction machinery. Proposed device comprises control board arranged on the machine or made self-contained, transducers of spatial position of boom and/or its sections, and/or machine rotary platform. It comprises also electronic control unit to receive and process signals from transducers and control board, set up and memorise system of coordinates and generate signals for operator and/or those to control machine drives, and display. Display serves to show data coming from electronic unit and/or control board. Electronic control unit decomposes instructions from control board into control signals for boom and/or its sections, and/or machine rotary platform so that control element displacement along one main direction corresponds to boom travel along one axis of set coordinate system. In compliance with 1st version, display, electronic control unit and/or control board can display coordinate system on display furnished with sensor screen, while electronic control unit and display can set up coordinate system using signals generated by sensor screen by operator actions. In compliance with 2nd version, proposed device additionally comprises gripper vertical position transducer, while electronic control unit receives and processes signals from said transducer, and generates gripper actuator control signals.

EFFECT: higher efficiency and accuracy of control.

24 cl, 1 dwg

FIELD: construction.

SUBSTANCE: invention relates to the field of transportation of thick masses by means of pipelines. Injection pipeline for transportation of thick masses, in particular liquid concrete for construction of a structure, is equipped with several pipes detachably split with each other in points of butt joints, serially arranged in longitudinal direction of pipeline. At the same time at least one of pipes is fixed in immovable support. Besides at least one subsequent pipe is pulled with the possibility of displacement along axis via guide element rigidly mounted on the structure. At the same time guide element forms floating support for basing of the according pipe. Device for fixation of injection pipeline for thick masses on the structure comprises at least one guide element fixed on the panel of floor slab or on the structure wall for alignment of one of the pipes, which is installed movably in direction of axis in guide element. At the same time guide element forms floating support for basing of the according pipe.

EFFECT: reduced tension in injection pipeline and improved possibility for replacement of separate pipes.

39 cl, 13 dwg

FIELD: construction.

SUBSTANCE: device consists of a control unit and an angle measurement unit with the former calculating the lifting arm position coordinates based on the angle measurement data to have been collected and exercising control over varied drive mechanisms accordingly. The device is additionally equipped with a remote control unit that broadcasts wireless remote control commands to support control over translocations. The directional control command consists of X-axis component, Y-axis component and Z-axis component referenced to a rectangular coordinate system with the rectangular coordinate system plotted within a space where its X, Y and Z axes correspond to each of the axial components of the directional control command of the remote control unit. When the remote control unit conveys a directional control command the control unit defines the lifting arm end in-plane relocation direction relying on the X-axis component, the Y-axis component and the Z-axis component of the directional control command to have been received and decomposes the total transposition into a sum of motions of specific arm sections and the rotating platform so that the lifting arm end become relocated exactly in the direction assigned by the control command.

EFFECT: rectilinear control over the lifting arm end relocation trajectory.

23 cl, 12 dwg

FIELD: construction.

SUBSTANCE: invention is related to the sphere of construction. Device for reception and application of concrete mixture on surface of bases contains mobile facility with platform, arm with receiving section that is connected with concrete-delivery pipeline that passes through hollow support installed on platform, end section of concrete-delivery pipeline and turning mechanism. Besides, device is equipped with additional arm, which is installed under platform coaxially with arm of receiving section and connected with end section of concrete-delivery pipeline with the possibility of provision of its alternating turn to both sides from arm axis by at least 120 degrees by means of mechanism, which is made in the form of two hydraulic cylinders and star. Arm with receiving section of concrete-delivery pipeline is equipped with mechanism of circular turn that is arranged in the form of geared couple with drive from hydraulic motor that is fixed in platform. At that arm of receiving section of concrete-delivery pipeline is made as three-hinged, and arm of end section - as two-hinged.

EFFECT: increase of concrete application surface area and provision of safety of works performance.

2 cl, 4 dwg

The invention relates to the field of hydraulic engineering construction and can be used when pouring massive concrete structures

The invention relates to construction machinery, namely, concrete transport machines

The invention relates to hydraulic construction and can be used in the construction of the complex in the form of the massive structures of buildings hydroelectric power plants in harsh environments

The invention relates to the field of construction, namely the production of wall, etc

FIELD: construction.

SUBSTANCE: method for erection of foundation under machines consists in deepening of massive reinforced concrete foundation foot of rectangular or prismatic shape in plan into ground base by ≥¼ of its height, but at least 1 m, its hydraulic insulation against hazardous effect of aggressive ground waters and arrangement of centre of gravity of machine and center of gravity of foundation foot area on the same vertical line, at the same time support surface of foundation is accepted as having area calculated according to given dependence. Support surface of foundation, which is rectangular in plan, is arranged with foot of spherical convex shape, at the same time given dependences are used to identify radius, angle of sector of elastic half-contact of sphere with ground, pressure of structural strength of ground for stretching, critical pressure under center of sphere, besides sphere of foundation is deepened. Support spherical surface is prevented against displacements with slippage and against tilting under action of external dynamic load by increasing edge horizontal support part of foundation rectangular in plan, protruding beyond edges of spherical support central surface, or by anchoring foundation to soil by means of piles. Also arrangement of foundation for machines is proposed.

EFFECT: increased bearing capacity, increased service life.

4 cl, 2 ex, 15 dwg

FIELD: construction.

SUBSTANCE: inventions relate to the field of foundation engineering of deep burial for important objects, such as nuclear power plants. Method for erection of nuclear power plant foundation consists in engineering-geological survey with detection of soil foundation layers depth, which complies with depth of active compressing thickness H, its physical-mechanical properties: angle φ of inner friction, c - specific adhesion, γ - density, E0 - module of common deformation, µ0 - coefficient of Poisson, which correspond to design elastic compressing load under deep buried foundation, in erection of mine pit with shape that corresponds to foundation, filling of filled layer of soil onto mine pit bottom and its compaction, erection of curb with reinforcement frame inside and its filling with high grade concrete. Foundation, which is solid in plan, is given convex spherical shape, which is inscribed in plan into configuration of monolithic foundation by radius of circumference, radius of sphere is identified by given dependencies, as well as maximum angle of elastic semi-contact of foundation sphere with soil foundation, pressure of structural tensile strength of foundation, central critical pressure under center of sphere in maximum elastic base. Bottom of mine pit for concave foundation is arranged with response spherical groove.

EFFECT: improved bearing capacity of foundation, improved elastic contact interaction of foundation with underlying soil foundation.

2 cl, 7 dwg

FIELD: construction.

SUBSTANCE: invention is related to means of protection against hazardous effect of vibration and may be used in construction, in particular in arrangement of vibration-insulated foundations for machines and equipment with dynamic loads. Foundation on vibroprotective elements comprises bath, foundation unit arranged in it with clearance versus walls and bottom and hingedly joined to vibration isolators installed in bath bottom. Vibration isolators are joined to foundation unit by means of hinged lever, which connects foundation unit to support element of vibration isolator, which comprises elastic element, body and pendulum suspension. Body is arranged in the form of box with lower base and upper plate with hole for threaded pin of pendulum suspension, which are connected to each other by three side ribs, with creation of window for accommodation of support lever, on which vibration-insulated object is arranged. Elastic element is arranged in the form of three serially connected elements: elastic ones and elastic-damping element arranged in between. Elastic elements with one of their bases are installed in bushes, which are fixed accordingly on upper plate of body and cover, and rest against washers with their other bases, and washers are joined with elastic-damping element. Pendulum suspension is arranged in the form of threaded pin, which is connected by one end to support lever for fixation of vibration-insulated object, and by other end - to nut and thrust washer, which is joined to cover attached to elastic element. Elastic-damping element is arranged in the form of steel-wire weaving or metal thread waste.

EFFECT: increased efficiency of spatial vibration insulation and simplified design.

2 dwg

FIELD: vibration protection, particularly to erect vibroinsulated foundations for machines and equipment subjected to dynamic loads.

SUBSTANCE: vibroinsulated foundation comprises bath, foundation block arranged in the bath so that the foundation block is spaced from bath walls and bottom and is pivotally connected to vibroinsulators. Each vibroinsulator is attached to foundation block by means of pivoted lever, which connects foundation block with support member of vibroinsulator. Each vibroinsulator has pendulum hanger made as threaded rod with spherical profile on one end thereof and comprises threaded bush fastened to the rod and having spherical profile. Both spherical profiles cooperate with conical surfaces of support vibroinsulator member and upper conical bush correspondingly. The resilient member of vibroinsulator is made as a number of serially connected resilient elements secured to bush along outer diameters thereof. The bush is fixedly connected to vibroinsulator base. Inner resilient element diameters are attached to bush, which encloses rod. One bush end abuts the last resilient element, another end cooperates with upper conical bush. Each annular resilient element may be formed as at least two flat resilient coaxial rings, namely inner and outer ones, which are fastened with each other by at least three resilient flat plates or resilient rods having round or polygonal sections. Each annular resilient element may be formed of at least two flat coaxial resilient rings, namely of upper and lower ones, connected with each other by at least three resilient flat plates, which are inclined to ring axes, or resilient rods having round or polygonal sections.

EFFECT: increased efficiency of volumetric vibroinsulation and simplified structure.

3 cl, 5 dwg

FIELD: vibration protection means for building industry, particularly vibroinulated foundations for machines, engines, or ordnance.

SUBSTANCE: vibroinsulated foundation comprises bath and foundation block arranged in the bath so that the foundation block is spaced from bath walls and bottom. The foundation block is higedly connected with bumpers, which in turn are attached to foundation block by means of hinged lever. The lever connects foundation block with support member of bumper. The bumper has pendulum suspension means made as threaded rod with spherical profile on one rod end and threaded bush also having spherical profile. Both spherical profiles cooperate with conical surfaces of upper and lower plates correspondingly. Resilient member is made as serially connected resilient disc means formed as disc springs connected with each other along outer diameters by means of ring having T-shaped profile and along inner diameters by means of ring having inner surface cooperating with outer bush surface. One bush end is fixedly secured to the base, another bush end is slidably installed in guiding bush.

EFFECT: increased efficiency of three-dimensional vibration protection and simplified foundation structure.

2 dwg

FIELD: vibration protection means for building industry, particularly vibroinulated foundations for machines, engines, or ordnance.

SUBSTANCE: vibroinsulated foundation comprises bath and foundation block arranged in the bath so that the foundation block is spaced from bath walls and bottom. The foundation block is higedly connected with bumpers, which in turn are attached to foundation block by means of hinged lever. The lever connects foundation block with support member of bumper. The bumper has pendulum suspension means made as threaded rod with spherical profile on one rod end and threaded bush also having spherical profile. Both spherical profiles cooperate with conical surfaces of upper and lower plates correspondingly. Resilient member is made as serially connected resilient discs connected with outer bush surface along inner disc diameters. One bush end is fixedly secured to the base, another bush end is slidably installed in guiding bush.

EFFECT: increased efficiency of three-dimensional vibration protection and simplified foundation structure.

2 dwg

FIELD: vibration protection means for building industry, particularly vibroinulated foundations for machines, engines, or ordnance.

SUBSTANCE: vibroinsulated foundation comprises bath and foundation block arranged in the bath so that the foundation block is spaced from bath walls and bottom. The foundation block is higedly connected with bumpers, which in turn are attached to foundation block by means of hinged lever. The lever connects foundation block with support member of bumper. Bumper has resilient member formed as two serially connected elastic resiliently-damping members divided with washer. Pendulum suspension means of the bumper is made as threaded pin having the first end connected to hinged lever and the second end connected to nut and thrust washer, which are connected to bush. The bush is attached to resilient member. The thrust washer is made of resilient material. Resiliently-damping member is formed as pleached strands or tangled wires.

EFFECT: increased efficiency of three-dimensional vibration protection and simplified foundation structure.

2 dwg

FIELD: vibration protection means for building industry, particularly vibroinulated foundations for machines, engines, or ordnance.

SUBSTANCE: vibroinsulated foundation comprises bath and foundation block arranged in the bath so that the foundation block is spaced from bath walls and bottom. The foundation block is higedly connected with bumpers, which in turn are attached to foundation block by means of hinged lever. The lever connects foundation block with support member of bumper. The bumper has pendulum suspension means and comprises compression spring cooperating with the base and with the pendulum suspension means. The pendulum suspension means is made as threaded rod connected to spherical washer formed on one end thereof and with threaded bush also attached to spherical washer end not connected with threaded rod. The spherical washers cooperate with not less than 3 balls located on conical surfaces of support members and cooperating with upper spring end and object to be protected against vibration correspondingly. Buffer limiting elastomeric members are installed in base.

EFFECT: increased efficiency of vibration protection and simplified foundation structure.

2 dwg

FIELD: mechanical engineering, particularly large electrical machines and foundations for turbogenerator and hydraulic generators.

SUBSTANCE: foundation slab comprises stator body base including support part connected with foundation. Arranged between support part and foundation is damping panel including reinforcement formed as vertical rods. Foam plastic member is put on the vertical rods and grouted with concrete grout. Vertical rods are connected one to another in horizontal plane with wire arranged at least in two levels in vertical plane of damping panel. Vertical rods extend through support part, pass into stator body base and into foundation.

EFFECT: reduced dynamic pressure applied to foundation slab and increased structural rigidity.

1 dwg

FIELD: construction, particularly new building erection and existent building reconstruction under any engineering-geological circumstances.

SUBSTANCE: foundation structure comprises shallow foundation and reinforcement members. Reinforcement members are made as vertical bars of precast or cast-in-place piles having diameters less than 200 mm and arranged along foundation perimeter. The piles are spaced a distance from outer foundation faces. The distance is equal to 0.1-0.5 of reinforcement member diameter. Distance between neighboring piles is equal to 2-4 reinforcement member diameters and reinforcement member length is 15-20 diameters thereof.

EFFECT: increased load-bearing capacity due to creating compressive operational conditions under different engineering-geological circumstances, increased dynamic rigidity of foundation base and reduced foundation deformation and vibrational amplitude.

9 dwg

FIELD: construction, particularly new building erection and existent building reconstruction under any engineering-geological circumstances.

SUBSTANCE: foundation structure comprises shallow foundation and reinforcement members. Reinforcement members are made as vertical bars of precast or cast-in-place piles having diameters less than 200 mm and arranged along foundation perimeter. The piles are spaced a distance from outer foundation faces. The distance is equal to 0.1-0.5 of reinforcement member diameter. Distance between neighboring piles is equal to 2-4 reinforcement member diameters and reinforcement member length is 15-20 diameters thereof.

EFFECT: increased load-bearing capacity due to creating compressive operational conditions under different engineering-geological circumstances, increased dynamic rigidity of foundation base and reduced foundation deformation and vibrational amplitude.

9 dwg