Sinking machine

FIELD: mining.

SUBSTANCE: The invention relates to mining, in particular, to sinking machine for excavation. The sinking machine comprises a hull, a working element, running gear, and a chain-linked conveyor. The hull is assembled from two parts with a ball joint hydraulic connection and jack-supported by blocks o tank and vehicle wheels. Each block has its own hydraulic drive. The working element comprises four rotors, two on large carrier and two on small carrier. The rotors rotate in different directions and are fitted with blades or roller bits. The rotor of one carrier rotate in one direction while the rotor of the second carrier rotation in the opposite direction, their rotation axis is inclined in different directions to ensure twisting in, like a corkscrew, into the working face during continuous feeding controlled by synchrodrives. The sinking machine can be fitted with manipulators with perforation drills. The form the arch shape of the bottomhole the large carrier rotors can move back and forth along the carrier sleeves using hydrocylinders controlled by tracers and verge millers.

EFFECT: increased productivity and excavation speed.

2 dwg

 

Machine heading "TATIANA" - a device designed to create the required mining types and sizes of machines for doing tunneling mates, capital and support, horizontal, ascending and descending cylindrical openings and arched section with a high rate of penetration 500-1000 RM/month.

In the eighties the average annual sinking shafts of the main and auxiliary openings in the USSR, actual and planned, was 50-70 p.m., the sinking of 150 m or more was considered high-speed penetration, for it turned out titles, orders, medals, securities (cars) gifts.

Conducting patent research, the author did not find any significant changes in the structures of tunneling devices and fundamentally new approaches to the management of tunnel works, so the average speed (planned) rose up to 70-100 m Plasma EN 2008121462, 2008116368, laser, fusion ("MOLE") penetrations in the future, mechanized same penetration not yet exhausted all its possibilities.

Now, in the age of mechanization and automation, offers many inventions to increase the rate of penetration, CJSC "Donetsk coal" Novocherkassk Polytechnic Institute proposes to increase the rate of penetration drilling and blasting method EN 2048715, design institutes offer at Uchenie swept roadheaders, such as CCP, RSCC, 4PPT-2, EN 94033685, even with two working bodies and measured including carriers EN 2039244, equipping tool on the desktop authority hydroshock mechanisms EN 2034986, 2004126848. For working driving large cross sections, we offer a shield large diameter installation swept harvesters at different levels of the shield EN 2011831.

DONGIPROUGLEMASH developed tunnel complex "SOYUZ-19". Russia becomes tunnel complexes U.S. firms "ROBBINS" and German company "HERRENKNECHT" (the world's largest machine for tunneling cyclic action). All these rotor, around the cylindrical section of the face, the complexes are very complex, bulky, bulky, power-consuming, difficult to manage, with great efforts of the head on the bottom and very expensive devices.

The modern idea is EN 2008116368, 2008121462 offering to produce the driving of using plasma melting designed to generate breed using melt to fill sabotoge space, casting poles, etc

Similar in approach to solving problems sinking mines is EN 2023153, Fig.2, with eccentric bushings for the design of the generation profile. Design 1, 2 are not able to keep the direction and stable contact of the rotor with the bottom breast due to ease of construction, d is I the example of the CCP and 4PPT - 2 Kopeysk plant, with hard contact of the working body with the bottom jump to bottom, as grasshoppers, lost direction and contact with the bottom, and 1 on the working body require a lot of effort to disassemble slaughter, and caterpillars device because of its ease will slide over the ground and tear of the belt fails, the control mechanism and drive caterpillars due to the lack of rigidity of the location of the harvester dynamics, complex kinematics of transmitting rotation from the motor to the carrier and rotors. There are many proposals devices: SU 99832, 123111, and others, but they all have certain disadvantages listed above.

The closest to solving the problems of penetration is SU 1694909 using a three-beam crawler, advanced kinematics of the working body, but has disadvantages; the planetary working body in two disk perpendicular to the axis of generation, large slip angles of the cones and the increase in energy costs, complex and costly system of special boot device boot Central auger destroyed the breed.

The present invention is directed to a compact, simple in construction, disassembly and Assembly, maintenance, reduced load on the working face, reliability and cost of the device.

The technical result consists in increasing the productivity of the device is Ista, the increase in the rate of sinking up to 500-1000 RM/month.

In the rotary working body across the cross-section generation is attended by all tools (cutters, milling cutter) and require increased effort on the face, great weight, good traction with the ground, roof, sidewalls and high-power propulsion complex on the face continuously or cyclically. The design of these working bodies provides for the slip angles of the cones from 3 to 12 degrees depending on the speed of rotation of the working rotor and drove, and it is already planned increased wear of the cones, bearings and, consequently, increasing energy consumption.

Installation of the working bodies of the rotors on the sleeves was taken at an angle significantly reduces the axial load. Imparting rotation to the lower cage and the rotor, the counter force destruction slaughter will try to move, to turn the harvester, but by connecting to the load the second (large) drove with his rotors, the opposing forces of the first led will be fully compensated and will only require efforts on the destruction of rocks by wave rotors. Because of the small rotors drove in the work involved 50% of the working tools, the burden on them will be 0-MAX-0, and the load value will be small. The large rotors drove participates 1/4 tsp bits, which is too small the load is. Weight, relatively small by design, machine and effort podemcrane blocks wheels enough to strictly consistent rotation with selsyns were taken with rotors that spin, are screwed into the bottom step of tilting the rotors to maintain the stability of the machine, to create efforts for its movement and to compensate for the load on the working face, it is sufficient to work on horizontal, descending and rising workings, even on vertical lines (trunks). Due to the hydraulically operated ball connection of the two housing parts has the ability to change the direction of the penetration up-down, right-left, to develop a pair workings of high velocity drilling, to make a u-turn machines on the pair in the shortest possible time.

The proposed device free from the above drawbacks and has a number of advantages, as he has taken all subsequent processes and is left:

1. Development of the breed.

2. Issuance of destroyed rocks from the bottom.

3. Protection of operating personnel from dripping rocks from the roof.

4. The design profile is set to sweep bemovie cutters.

The benefits.

1. The compact size.

2. The simplicity and ease of construction.

3. Maintainability, reliability. Simple and reliable kinematics of the interrelated parts and components.

4. Agility, the ability to work the s on the slopes and steeply dipping formations. To do u-turns on the pair in the shortest possible time.

5. Snap manipulators (drills, punches).

6. Low energy consumption.

7. A small value.

This technical result is achieved by the fact that the tunneling machine includes an Assembly housing 7 with ball hydraulically operated connection 6 assembled on the housing carrier 3 and 4 rotors 1 and 2 with hydraulic drives, chain conveyor, block 5 motor and tank wheels with hydraulic cylinders and jacks for installation of the machine along the axis of generation, to create a more rigid contact the front of the housing with the side surface generation, reduce vibration from the rotors, mobile blocks the front of the case are established tank rubber wheels on the rear of the chassis are mounted wheels with road tyres, inflated porous rubber (micropore under pressure for the tires. To ensure rigidity of the device (spontaneous slip on the slope, the repair of any unit of the wheels, conducting mates) each part of the body is equipped with 5 blocks of wheels, each with its drive through a worm gear, the thrust jacks are equipped with HPA - hydropneumatic batteries with automatic support a given pressure. To protect the staff, there are special is poddomkratit valve 10 of the roof.

To start the machine in operation assemble it in the open space in front of a specially designed input parameters required rough framing and the size of the machine, make the connection for all communications, produce test units and mechanisms, then the machine power feed is served in the log output. After the supply device to the chest of the face include a pumping station to supply hydraulic rotors 1, 2, led 3, 4, chain conveyor (the drawing is not specified), running blocks wheels 5 mounted on axes 9 at the point of intersection of the axis with the diameter profile of the cylinder 8, and slowly injected into the bottom breast working body, then include the machine in the required modes of operation. The working body at a constant, controlled selsyns filing screwed into the bottom, the design of the arched profile of the cross section by moving the outer rotors on directing a large drove on copier installed in front of a large planet carrier, figure 2 shows the angular position 2* outer rotors, the final design of the corners is bemovie cutters. Broken rock is removed the chain conveyor located at the bottom of the device between the bottom blocks of the wheels. Between the rows of blocks wheels in roof space overlaps poddomenami flaps overlap 10 to protect the service staff is tons of dripping rocks from the roof. The rear part of the housing required in the first place, to create rigidity to the lightweight construction, maintain good contact of the working body with a bottom, distribution of significant efforts by the filing of the face between the blocks of the wheels, preventing rotation of the wheels and increased wear. For the construction of mates have rigid coupling of the device with the ground and the roof, because during the construction of the pairing is the break in the axis of the housing to constructively laid maximum value at the point hydraulically operated ball joint 6, and one side will leave contact with the device to remain in contact will be soil - roof - 1 sidewall front portion of the chassis, and full contact of the second part and so on, than due to the installation of 5 units of wheels on each side of the hull, and, secondly, on the rear of the case possible location of the hardware of the device, as well as equipment for conducting attachment.

For the implementation of the reversal device is disassembled ball joint, and because each part has its own managed move, the rear part 7 of the first makes a turn and goes in pair, then the same procedure, the front part 7; produce hitch parts, connect the oil system running to the oil pump greater productivity, and the device its course is delivered in a new fence is.

Figures 1 and 2 indicated:

1. The small rotors were taken.

2. The large rotors were taken.

2* Nomination rotors for clearance profile of the arch type.

3. Small led

4. A large drove.

5. Blocks with the car wheels.

6. Ball hydraulically operated connection.

7. Case.

8. Line profile generation.

9. Axis installation of the bottom blocks of the wheels.

10. The valve overlap of the roof.

Tunneling device comprising a housing, a working body, chassis, chain conveyor, characterized in that it carries a housing assembled from two parts, assembled by means of hydraulically operated articulated connection, podemcrane blocks of tank and automotive wheels having a hydraulic drive, a working body consisting of the four rotors, two larger and small driver, rotating in different directions, the rotors are equipped with cutters or cones, the rotors of one led mounted for rotation in one direction and another in another, and have the inclination to the axis of rotation in different directions to ensure twisting like a corkscrew in the bottom breast at a constant controlled selsyns supply, while the tunneling machine has the ability to snap manipulators with drills-drills to get the arched profile of the face, the rotors are larger carrier have the ability to perform reciprocating movements is about the sleeves ran cylinders, managed copier, bemovie cutters.



 

Same patents:

FIELD: engines and pumps.

SUBSTANCE: drive device for rotary tool, which operates with oscillation loading, has drive housing, load-carrying sleeve installed with possibility of being rotated in drive housing, drive shaft installed with possibility of being rotated in load-carrying sleeve, carrier of the tool for receiving processing tools, and oscillation excitation device for creating oscillation loading of carrier of the tool. Oscillation excitation device for each carrier of the tool has at least two intermediate shafts which by means of eccentric parts are attached to carriers of the tools and made with possibility of synchronous actuation.

EFFECT: improving support and sealing of drive shaft and load-carrying sleeve, increasing service life of drive devices.

25 cl, 21 dwg

FIELD: coal industry, particularly development machines for hydromines.

SUBSTANCE: method involves performing preparation drilling operations along with well flushing in mine ground with the use of several hollow rods provided with cutting crowns; anchoring tunneling machines by fastening thereof to well walls with the use of spring-piston mechanisms provided with anchoring means and connected to hollow rods so that tunneling machine fastening is carried out without rod removal from wells; cutting new ledge after hollow rod removal from well; fixing anchoring member during ledge cutting after hollow rod removal by applying tension to hollow rod in the absence of water pressure in it. Anchoring member is detached from well wall by moving rod to face simultaneously with supplying pressurized water to the rod before hollow rod removal. Spring-piston mechanism acts on anchoring member in direction transversal to well wall. Then the rod is removed from well and the tunneling machine is moved for distance equal to ledge width and tunneling machine fixation operations are repeated.

EFFECT: increased reliability of temporary tunneling machine anchoring during excavation operation performing.

6 dwg

FIELD: mining industry.

SUBSTANCE: method includes directing breaking hits along layer structure of salt massif. For this executing tool of machine is provided with necessary number of chisels, directed along layer structure of salt massif, chisels are rigidly held in parallel to layers and direction of hit is changes concurrently for all chisels by rotation of machine, reciprocal movement is applied to chisels in the way to make breaking hits in direction of salt massif along layer structure. Due to destruction of salt massif in direction of layer structure, above-lying pieces are broken off, and in a way to minimally damage layers themselves, and break off large pieces of massif without over-pulverization of ore.

EFFECT: higher speed of operation, higher efficiency.

1 dwg

FIELD: mining industry, particularly for performing horizontal and inclined excavations by drilling-and-blasting method.

SUBSTANCE: robot device comprises rock detaching and loading systems having mobile tracked loader and suspended drilling equipment. The device includes manipulation system having platform and manipulator and system providing necessary rock grading. System providing necessary rock grading comprises digital photographic camera, microprocessor image analyzing means and suspended replaceable percussion-cut equipment. The suspended equipment is mounted on platform secured to manipulator arranged on frame which is connected to track undercarriage. Digital photographic camera is secured to manipulator in parallel to suspended equipment axis. To perform control of drives microprocessor means linked with microprocessor image analyzing means through parallel data transmission register are used.

EFFECT: improved capacity, increased operational rate and level of automation, increased safety of drilling-and-blasting excavation performing.

1 dwg

The invention relates to mining machinery and can be used in the construction of mining machinery, using irrigation in the process

Tunneling unit // 2209979
The invention relates to mining and can be used in the mine working

Mountain harvester // 2209311
The invention relates to mining machinery and can be used in the construction of mining machines

The invention relates to the mining industry and is intended for mechanized mining excavation tunneling machines without long stops on the capacity of belt conveyor

Heading-shearer // 2186213
The invention relates to mining technique, namely, drilling machines, intended for carrying out horizontal and inclined mine workings

FIELD: mining industry, particularly for performing horizontal and inclined excavations by drilling-and-blasting method.

SUBSTANCE: robot device comprises rock detaching and loading systems having mobile tracked loader and suspended drilling equipment. The device includes manipulation system having platform and manipulator and system providing necessary rock grading. System providing necessary rock grading comprises digital photographic camera, microprocessor image analyzing means and suspended replaceable percussion-cut equipment. The suspended equipment is mounted on platform secured to manipulator arranged on frame which is connected to track undercarriage. Digital photographic camera is secured to manipulator in parallel to suspended equipment axis. To perform control of drives microprocessor means linked with microprocessor image analyzing means through parallel data transmission register are used.

EFFECT: improved capacity, increased operational rate and level of automation, increased safety of drilling-and-blasting excavation performing.

1 dwg

FIELD: mining industry.

SUBSTANCE: method includes directing breaking hits along layer structure of salt massif. For this executing tool of machine is provided with necessary number of chisels, directed along layer structure of salt massif, chisels are rigidly held in parallel to layers and direction of hit is changes concurrently for all chisels by rotation of machine, reciprocal movement is applied to chisels in the way to make breaking hits in direction of salt massif along layer structure. Due to destruction of salt massif in direction of layer structure, above-lying pieces are broken off, and in a way to minimally damage layers themselves, and break off large pieces of massif without over-pulverization of ore.

EFFECT: higher speed of operation, higher efficiency.

1 dwg

FIELD: coal industry, particularly development machines for hydromines.

SUBSTANCE: method involves performing preparation drilling operations along with well flushing in mine ground with the use of several hollow rods provided with cutting crowns; anchoring tunneling machines by fastening thereof to well walls with the use of spring-piston mechanisms provided with anchoring means and connected to hollow rods so that tunneling machine fastening is carried out without rod removal from wells; cutting new ledge after hollow rod removal from well; fixing anchoring member during ledge cutting after hollow rod removal by applying tension to hollow rod in the absence of water pressure in it. Anchoring member is detached from well wall by moving rod to face simultaneously with supplying pressurized water to the rod before hollow rod removal. Spring-piston mechanism acts on anchoring member in direction transversal to well wall. Then the rod is removed from well and the tunneling machine is moved for distance equal to ledge width and tunneling machine fixation operations are repeated.

EFFECT: increased reliability of temporary tunneling machine anchoring during excavation operation performing.

6 dwg

FIELD: engines and pumps.

SUBSTANCE: drive device for rotary tool, which operates with oscillation loading, has drive housing, load-carrying sleeve installed with possibility of being rotated in drive housing, drive shaft installed with possibility of being rotated in load-carrying sleeve, carrier of the tool for receiving processing tools, and oscillation excitation device for creating oscillation loading of carrier of the tool. Oscillation excitation device for each carrier of the tool has at least two intermediate shafts which by means of eccentric parts are attached to carriers of the tools and made with possibility of synchronous actuation.

EFFECT: improving support and sealing of drive shaft and load-carrying sleeve, increasing service life of drive devices.

25 cl, 21 dwg

Sinking machine // 2442898

FIELD: mining.

SUBSTANCE: The invention relates to mining, in particular, to sinking machine for excavation. The sinking machine comprises a hull, a working element, running gear, and a chain-linked conveyor. The hull is assembled from two parts with a ball joint hydraulic connection and jack-supported by blocks o tank and vehicle wheels. Each block has its own hydraulic drive. The working element comprises four rotors, two on large carrier and two on small carrier. The rotors rotate in different directions and are fitted with blades or roller bits. The rotor of one carrier rotate in one direction while the rotor of the second carrier rotation in the opposite direction, their rotation axis is inclined in different directions to ensure twisting in, like a corkscrew, into the working face during continuous feeding controlled by synchrodrives. The sinking machine can be fitted with manipulators with perforation drills. The form the arch shape of the bottomhole the large carrier rotors can move back and forth along the carrier sleeves using hydrocylinders controlled by tracers and verge millers.

EFFECT: increased productivity and excavation speed.

2 dwg

FIELD: mining.

SUBSTANCE: invention relates to mining. A complex comprises a receiving wedge part with a loading module, a hopper for exploding and loading, an unloading scraper part, a self-movement mechanism, a pump station, a control panel, a hydraulic manipulator with a drilling machine on a portal trolley moving along a loader column, a safety support made of safety shields and stands, moving along guides at hopper boards with the help of sliding carriages. At the same time safety shields have two sections, the front section is hingedly attached to the rear section, and is made as capable of turning down by means of two hydraulic cylinders, arranged under safety shields, at the same time the front section is lowered before blasting and lifted afterwards from a panel of complex control.

EFFECT: improved design of a tunnelling exploding-loading complex.

4 dwg

FIELD: mining.

SUBSTANCE: complex comprises a receiving wedge part with a loading module, a hopper for exploding and loading, an unloading scraper part, a self-movement mechanism, a pump station, a control panel, a hydraulic manipulator with a drilling machine on a portal trolley moving along a loader column, a safety support moving along guides at hopper boards with the help of sliding carriages. At the same time the inner part of guides at boards of the hopper for exploding and loading is arranged in the form of a geared rack, and wheels of sliding carriages of the safety support - in the form of geared wheels moving along the rack, besides, movement to geared wheels is transferred from electric drives installed inside sliding carriages, and their supply is provided by electric cables wound onto drums installed in a tail part of the hopper for exploding and loading and having a mechanism of automatic winding making it possible to pull a cable from a drum as sliding carriages move along the hopper to the bottomhole, and to wind the cable back onto the drum as sliding carriages move away from the bottomhole.

EFFECT: improved design of a tunnelling exploding-loading complex, reduced labour intensiveness and higher efficiency of tunnelling works.

5 dwg

FIELD: mining.

SUBSTANCE: method includes the following stages. Installation of a structure inside or tightly with an underground mine, so that the structure provides for reactive forces when pushing a cutting head in direction of the material by means of a series of rigid materials fixed on the structure, which i arranged so that series of rigid elements may be fixed to it simultaneously at least in two directions, so that parts of tunnel branches could be formed in at least two appropriate directions, of the underground mine designed for transportation of people, mechanisms and extracted material. Formation of multiple parts of tunnel branches entering the material. Formation of the first part of the tunnel branch with the help of a cutting head and a series of rigid elements in the first direction, and afterwards formation of the second part of the tunnel branch in the second direction. During formation of the second part of the tunnel branch, movement of rigid elements from the part of the first tunnel into the part of the second tunnel branch for extension of the series of rigid elements in the part of the second tunnel branch.

EFFECT: application of the method considerably reduces costs, makes it possible to considerably increase speed of tunnelling and increases efficiency of production.

21 cl, 10 dwg

FIELD: oil and gas industry.

SUBSTANCE: heading set of equipment includes heading machine with actuator device fixed at it by timberer with hold-down beam and spacing cylinders. Turning shaft at hold-down beam is equipped with turning mechanism at the machine conveyor. Manipulators are equipped with drilling and anchoring tools with permanent anchorage. Hold-down beam is equipped with sliding telescopes; manipulators with permanent fixtures are fixed at sliding telescopes of the hold-down beam. Turning shaft is made as load lifting telescopic boom with lifting and spacing cylinders. Hold-down beam at carry does not protrude beyond machine dimensions.

EFFECT: improving reliability of timberer, reducing errors at erection of permanent anchorage, increasing mobility and expanding scope of application both with minimum and maximum draft size.

5 cl, 3 dwg

Tunnelling machine // 2499888

FIELD: mining.

SUBSTANCE: tunnelling machine includes a frame with caterpillar trucks, a tray, an actuating element with a telescope, a conveyor, a buffer device, and a control panel, which are fixed on it. With that, the machine frame is provided with a telescopic pushing device with a power cylinder and a buffer with a support cylinder and brackets for fixation of support beams with holes for anchor bolts and an installation place of anchor posts into the mine working roof. Extension value of an extensible part of the pushing device is divisible by the value of telescope of the actuating element and mine working support pitch. The control panel of the telescopic pushing device is combined with the machine control panel and interconnected with the machine operation. Besides, the machine buffer devices can be equipped with a telescopic part and combined along the machine frame axis in the pusher housing with an axial partition wall. The telescopic pushing device can be made in the form of telescopic cylinders using support beams with holes for anchoring to mine working ground, thus compensating the divergence of planes in support places of the machine caterpillar trucks and its support beams to the mine working ground.

EFFECT: enlarging scope of application of tunnelling machines with caterpillar movement as to inclination angles of the mine working; improving operating reliability of the machine and its mobility and compactness.

9 cl, 4 dwg