Method of constructing mobile repair unit for communication equipment

FIELD: information technology.

SUBSTANCE: method of constructing a mobile repair unit for communication equipment additionally involves identification (determination) of the type of the communication equipment connected to the repair unit. The diagnosis program is selected depending on the type of the connected communication equipment. The communication equipment is diagnosed. The degree of importance (priority) of the repaired part of the communication equipment is determined and unit repair is carried out.

EFFECT: high efficiency of the repair unit for communication equipment owing to diagnosis and repair of communication equipment depending on the type of the equipment.

1 dwg

 

The invention relates to communication technology, namely the restoration of mobile communications in the field (in emergency situations).

Interpretation of terms used in the application for the alleged invention.

Recovery is a complex of works on the identification of failure determination of its location and nature of mobile communications equipment, maintenance and monitoring of their technical condition (GOST 27.002-89. Reliability in engineering. Terms and definitions. - M.: Publishing house of standards, 1989. - 37 S.).

Repair of a complex of operations on transfer of mobile communications from an unhealthy state to a healthy (GOST 18322-78. The system of technical maintenance and equipment repair. Terms and definitions. - M.: Publishing house of standards, 1978. - 14 S.).

Mobile communication means, communication means, mounted on the means of mobility and designed for education typical transmission channels and group paths of the primary network connection. To consider in the invention means of communication types include: radio relay, tropospheric, radio, space and wire (basics of building systems and networks transmission media. Textbook for high schools / VCI, Aigialos, Cvetek, Vmmain; under. edit Vmmain): Hot line - Telecom, 2005. - 382 S.).

The technical control is the first state - determining actual values and (or) qualitative characteristics of the technical condition of the communication means, comparing them with the requirements of normative-technical documentation, to assess the technical condition of means of communication (GOST In 25883-83. Maintenance and repair of military equipment. Terms and definitions. - M.: Publishing house of standards, 1983. - 19 S.).

Repair body (RO) - a set of interrelated documents, tools, repair and performers (repairmen)necessary to restore communications (GOST 25866-83. The operation of equipment. Terms and definitions. - M.: Publishing house of standards, 1983. - 10 seconds).

Technical readiness - the ability of communication to perform its required function at any time when the presence in its composition of the required number of working nodes (blocks, items) with the necessary supply of a resource contained in the original set of operational documentation, the status or condition, and trained to perform assigned tasks (Grecinieku E.V., labunets A. M., Belov A.S., Lyubimov, VA, Pominchuk O.V. Development of scientific and technical solutions to ensure technical readiness of the elements of the information-telecommunication network based on the method of functional diagnostics / telecommunications No. 8, 2005. the.22-24).

The repair operation - communications-finished part of the repair that represents a set of techniques that are performed on a single workstation installed for the operation being performed by means of repair (GOST 18322-78).

Maintenance - technical devices, spare parts and materials for repair of telecommunications equipment (GOST In 25883-83).

The aggregate method of repair is an impersonal method of repair, which failed units are replaced or renovated in advance (GOST 18322-78).

Under the Assembly refers to the Assembly unit, having the properties of full interchangeability, independent of the Assembly and perform a specific function in products for various purposes (e.g., motor) (GOST 18322-78).

A detailed method of repair - repair method, which replaces or restores individual parts, replacement (GOST 18322-78).

Failure is an event consisting in the violation of the operating state of the means of communication (GOST 27.002-89).

Electronic functional unit - radio electronic means (RECs)representing a functionally complete Assembly unit, performed on a supporting structure that implements the transformation function of the signal and not having an independent operational use (GOST 26632-85. Levels resoucres the Deposit of radio-electronic means according to the functional and structural complexity. - M.: Publishing house of standards, 1985. - 10 seconds).

The main task in the field (in case of emergency) is carrying out activities to maintain communications in the state, providing the required technical readiness, the main of which is the repair. While repair of the means of communication is hardware technical support (ATO). Known systems repair mobile (field) communications based on ATO (maintenance of means of communication. Part I. Pijarska, Alagille, ACI / edited Alacrastore. - L.: YOU, 1980. - 302 S.; maintenance of tools and communication systems / edited Alacrastore. - L.: YOU, 1979. - 180 S.; maintenance and reliable communications. Alagille, Wphkloio, Bccoming. - L.: YOU, 1970. - 278 S.).

The way the organization of repair in such systems suggests that ATO is the repair of various equipment (receivers, transmitters, power supply, antenna-feeder devices and other) only one type of means of communication (radio, radio-relay, tropospheric, space, wired). This way the organization of repair is most effective when the diagnosis and repair for a large number of similar means of communication.

However, in an emergency, communication is used a limited number of diverse means of communication. An example is the sing of a limited number of diverse means of communication in emergency situations described in (Bulgak V.B. have been, Varakin LE, Krupnov AU and other basic management communications of the Russian Federation / Under the editorship Varakin LE, Krupnova AU - M.: Radio and communication, 1998, RES, p.93).

When using diverse means of communication, you must have the ATO for each media type that leads to an increase in the number of ATO and reduce the effectiveness of the repair, which is manifested in increased downtime rate (lower load factor repairmen).

Known closest to the claimed (prototype) in its technical essence is a method that is implemented in an automated system for monitoring and diagnostics (the Invention of "Automated control and diagnostics", patent RU 2257604 C2, G05 23/02, NV 17/00, publ. 27.07.2005, bull. No. 21). The way the prototype is in control of the instrument, in this case before the control node of electronic equipment (REE) is connected to an automated system for monitoring and diagnosis, is retrieved from the database control program, including benchmarks, is the issue of test signals, this sets the tone settings of the special form (to control analog and analog-to-digital circuits and high-frequency signals (for control nodes REA containing high-frequency part), the control procedure is performed in stages (steps), and the synchronization of IP is of regular supply test signals and measuring the response signals provided by the clock supply signals of a given frequency from the programmable synchronization unit, and the control sequence of the issuance of the test signals provided by the measurement of the response signals and comparing them with a reference is made under the program under control of the control computer complex, collectively supplied to the node REA control reference test signals receive a combination of measured parameters of the response signals, which are compared to reference values of the response signals, when the measured signals are within tolerance nodes REA be considered fit, when the parameters of the measured signals for the tolerance zone is given fault message this node REA and the need for diagnosis of faults; diagnose faults, while on the host computer sets the type of diagnosable node REA, from the database retrieved program diagnosis, including a set of sequentially-issued diagnostic tests, the diagnosis process is performed in stages, the first stage in the site are served diagnostic tests, allowing you to pre-locate faults in the schema node, after the preliminary localization of the point of refusal is to drill the point of refusal, to this end according to the program of diagnostics issued instructions for the connection of measuring devices in the appropriate prom is mediate point of the circuit, based on the analysis of parameters of signals received with use of measuring instruments identified problems or issued clarification on a similar analysis of other portions of the electric circuit node, the measurement process signals in the intermediate points of the site and the subsequent comparison with the corresponding parameters of the reference signals for the same points continues until a complete diagnosis of the entire circuit node, a sequence view of the intermediate circuit node is set based on the characteristics of the build site, and also taking into account the principle of operation of the node, based on the results of the diagnostic repair node REA (elimination of detected errors), then re-inspected the repaired node REA specified above, if the control is successful, the node REA admits fit (refurbished)if you set the deviation from the reference characteristics, which means that an open fault, the node REA re-runs diagnostics to identify unresolved fault, the repair process and control ends when the node CEA is recognized as valid.

The main disadvantage of the prototype is that when a large number of diverse communications needs to have a large number of diverse ATO, th is leads to an increase in the number of ATO and reduce the effectiveness of its functioning, expressed in increased downtime rate (lower load factor repairmen). Thus there is no possibility of simultaneous diagnosis and repair multiple (heterogeneous or homogeneous) communications (Technical operation means, movable objects and communication structures / edited Alacrastore. - M.: Voenizdat, 1974. - 302 C.). In the prototype is the ability to diagnose only the individual electronic units to the presence in them of the reasons for failure, but not the means of communication in General, and there is no possibility to diagnose communication as a complex object, consisting of various equipment, which does not allow to implement the aggregate method of repair as the most promising in the field (ES) (maintenance of means of communication. Part I. Pijarska, Alagille, ACI / edited Alacrastore. - YOU, 1980. - 302 S.).

The technical result of the invention is to develop ways to build a mobile repair body communication that extends an existing method, as well as having higher compared with existing methods, the efficiency by reducing the downtime rate (increasing load factor) repair and reducing the number of jobs in the ATO, including the possibility of the ability to diagnose communications in General, as a complex object that consists of a combination of electronic units, is realized in this aggregate method of repair, as the most promising in the field (emergency).

This technical result is achieved by the fact that the proposed method of constructing a mobile repair body communication means different from the famous diagnose and aggregate repair at the same time as several homogeneous and heterogeneous mobile communications in the field, based not on the type of these means of communication (radio, radio-relay, tropospheric, space, wired), and the type of equipment repair communication equipment (receivers, transmitters, power supply and antenna-feeder devices and others belonging to different media types). While repair various types of equipment are carried out in one repair the body. Thus, the proposed method will allow more efficient to organize the repair of different types of mobile communications while reducing the number of jobs in repair the body and increase the load factor of repair in case of emergency.

The analysis of the level of technology has allowed to establish that the analogs are characterized by the sets of characteristics is identical for all features of the claimed invention, are absent. Therefore, stated the Lenna invention meets the condition of patentability "novelty".

Search results known solutions in this and related areas of technology in order to identify characteristics that match the distinctive features from the prototype features of the claimed invention, have shown that they do not follow explicitly from the prior art. Of certain of applicant's prior art there have been no known impact provided the essential features of the claimed invention to the achievement of the technical result. Therefore, the claimed invention meets the condition of patentability "inventive step".

"Industrial applicability" method due to the presence of elemental basis, on the basis of which can be performed by devices that implement this method.

The claimed method is illustrated in the drawing, which shows a scheme of work the repair of the body.

The proposed method consists in the following.

The first step is to connect N diagnosed communications to repair the body. Further communication received on 1,...,n workplace (RM). Here you define the type of communication is chosen from 1 to m program diagnosing means of communication depending on its type, species identification of failed equipment, conducting diagnosis of a failed equipment. Following is the aggregate repair among the STW communications depending on their priority (importance).

The procedure of the proposed method consists in the following: before the control node of electronic equipment (REE) is connected to an automated system for monitoring and diagnosis is the identification (definition) type of communication means, connected to repair the body. Identification of authors known to specialists procedure implemented by a number of known algorithms (Shikin. Neural network: a complete course, 2nd edition. TRANS. from English. - M.: Publishing house "Williams", 2006. - 1104 S., p.115-116), technical devices (Metrology, standardization and measurements in communications technology: Textbook. manual for schools / Bchamel, Aventino, Alienesque and others; Ed. by Bphome. - M.: Radio and communication, 1986. - 424 S., RIS, p.362, RIS, str) and schemes of dimension (Isivuno, Lyubimov, VA, Sudakov A.N., Labunets A.M., Grecinieku E.V. Methods and means of measurement in telecommunication systems: a Handbook. Eagle: the Academy of the Federal security service of Russia, 2008. - 220 C., RIS-3.14, p.60-67). According to the results of identification of the means of communication chosen program of diagnosis, depending on the type of the connected communication tools, diagnostics equipment, means of communication, namely, that from the database is retrieved by the control program, including benchmarks, is the issue of test signals, when et is m are the parameters of signals of a special form (to control analog and analog-to-digital circuits and high-frequency signals (for control nodes REA, containing high-frequency part), the control procedure is performed in stages (steps), and the synchronization of sources of supply test signals and measuring the response signals is provided by applying a clock signal of a given frequency from the programmable synchronization unit, and the control sequence of the issuance of the test signals provided by the measurement of the response signals and comparing them with a reference is made under the program under control of the control computer complex, collectively supplied to the node REA control reference test signals receive a combination of measured parameters of the response signals, which are compared to reference values of the response signals, when the measured signals are within tolerance nodes REA be considered fit, when the output parameters of the measured signals for the tolerance zone is given fault message this node REA and the need for fault diagnosis of, from the database is retrieved, the program diagnosis, including a set of sequentially-issued diagnostic tests, the diagnosis process is performed in stages, the first stage in the site are served diagnostic tests, allowing you to pre-locate faults in the schema node, after pre-Loka is Itachi the point of refusal is to drill the point of refusal, with this purpose, according to the program of diagnostics issued instructions for the connection of measuring devices at corresponding intermediate points in the circuit, based on the analysis of parameters of signals received using measuring instruments identified problems or issued clarification on a similar analysis of other portions of the electric circuit node, the measurement process signals in the intermediate points of the site and the subsequent comparison with the corresponding parameters of the reference signals for the same points continues until a complete diagnosis of the entire circuit node, a sequence view of the intermediate circuit node is set based on the characteristics of the build site, and also taking into account the principle of operation of the node, based on the results of the diagnostic repair node REA (elimination of detected errors), then re-inspected the repaired node REA as indicated above, if the control is successful, the node REA admits fit (refurbished)if you set the deviation from the reference characteristics, which means that an open fault, the node REA re-runs diagnostics to identify unresolved fault, the repair process and control ends when the node CEA is recognized as valid, then PR is taken off, the prediction of the technical condition of communication. Forecasting technical condition of communication is based on a combination of measured parameters of the response signals by the control program. That is the result of advanced forecasting is the prediction of the emergence of new failures in the means of communication, that is determined with a probability of time during which there will remain a health communication after repair. While the technical implementation of the forecasting process known as technical devices from a wide range of technical literature (the new diagnostic tools: Directory / WLI, Pre, Wearly, etc.. Under the General Ed. VLA. - M.: Mashinostroenie, 1989, 672 S., PP 156-161; workbook forecasting / Ivestream-Lada. - M.: Thought, 1982. - 430 S., str-293).

The degree of importance (priority) is determined by the results of the forecasting and analysis of time values within which there will remain a health communication. The more time it takes, the higher the priority repaired means of communication.

To perform aggregation repair is a well known effect in which defective items communications (aggregates) are replaced or renovated in advance (GOST 18322-78. The system of technical maintenance and equipment repair. Terms and definition is possible. Item 45, page 7).

Evaluation of the effectiveness of the method described in the application can be done using a comparative evaluation values of the load factors (employment) (KC) and downtime (Kp) repairmen. The procedure for the calculation of load factors (employment) and idle is described in (Novikov O.A., Petukhov, S. Applied theory of mass service. M., Soviet radio, 1969. - 400 C.).

Load factor (employment) is determined by the formula:

where NC- the number of employed repairers;

n is the total number of repairmen.

Downtime rate is determined by the formula:

where N0- number of free maintenance.

To determine the load factor of repair only repair bodywhen carrying out repairs of all types of communication means (m) for time t, it is necessary to use the formula described in (Novikov O.A., Petukhov, S. Applied theory of mass service. M., Soviet radio, 1969. - 400 C.):

where- load factor RHO j-th type for repairs of similar means of communication;

nj- the total number of repairmen j-th type for repairs of similar means of communication;

m is the number of types is redst connection.

Evaluation of the effectiveness of the proposed method of construction of mobile RO communications will consider ways of communication in the emergency area (regional center). Option communication in the emergency area described in (Bulgak V.B. have been, Varakin LE, Krupnov AU and other basic management communications of the Russian Federation / Under the editorship Varakin LE, Krupnova AU - M.: Radio and communication, 1998, RES, p.93).

Analysis of the number and types of applied communications in the regional center demonstrates that for repairs seven different types of communications with the existing way the organization needs at least five different types of ATU. Moreover, for each of communication tools such as satellite station, radio station, radio relay station requires its own specialized ATO.

For example, the regional center requires the following ATO:

ATO intended for radio repairs;

ATO intended for repair of radio relay stations;

ATO intended for repair of satellite communication stations;

ATO, designed for field repair of the cable;

ATO intended for repair of power supply devices.

If each ate five masters repairmen total number of repairmen - n=25 (people).

For example, the satellite communication station (CS) has failed. To restore this station tre is : ATO, designed for repair of satellite communication stations (with the number of repairmen 5 (people)).

Thus, the load factor of the repair of the authority of the regional center is (for five ATO):

Assume that a mobile communications regional center will service and repair the body, formed on offer in the invention method. First, the RM will be designed for the repair of receivers, the second is for repair of transmitters, and the third for repair of power supply devices, and the fourth for repair field cable. Each RM two repairman.

For repair of satellite communication station (CS) will have two repairman at each RM, then the load factor of the repair body is equal to:

The effectiveness of the proposed method is equal to:

Thus, the effectiveness of the proposed method is equal to 20%.

The way to build a mobile repair body communication, which consists in the control of the instrument, in this case before the control node of electronic equipment (REE) is connected to an automated system for monitoring and diagnosis, is retrieved from the database control program, including benchmarks, is issuing a test signal is, this sets the tone settings of the special form (to control analog and analog-to-digital circuits and high-frequency signals (for control nodes REA containing high-frequency part), the control procedure is performed in stages (steps), and the synchronization of sources of supply test signals and measuring the response signals is provided by applying a clock signal of a given frequency from the programmable synchronization unit, and the control sequence of the issuance of the test signals provided by the measurement of the response signals and comparing them with the reference, is on the program under control of the control computer complex, collectively supplied to the node REA control reference test signal receive a set of measured parameters of the response signals, which are compared to reference values of the response signals, when the measured signals are within tolerance nodes REA be considered fit, when the parameters of the measured signals for the tolerance zone is given fault message this node REA and the need for diagnosis of faults; diagnose faults from the database is retrieved, the program diagnosis, including a set of sequentially-issued diagnostic tests, about the ESA diagnosis is performed in stages, at the first stage on the site are served diagnostic tests, allowing you to pre-locate faults in the schema node, after the preliminary localization of the point of refusal is to drill the point of refusal, to this end according to the program of diagnostics issued instructions for the connection of measuring devices at corresponding intermediate points in the circuit, based on the analysis of parameters of signals received using measuring instruments identified problems or issued clarification on a similar analysis of other portions of the electric circuit node, the measurement process signals in the intermediate points of the site and the subsequent comparison with the corresponding parameters of the reference signals for the same points continues until a complete diagnosis of the entire circuit node, the sequence view of the intermediate circuit node is set based on the characteristics of the build site, and also taking into account the principle of operation of the node, based on the results of the diagnostic repair node REA (elimination of detected errors), then re-inspected the repaired node REA as indicated above, if the control is successful, the node REA admits fit (refurbished)if you set the deviation from the reference characteristics, h is about means of an unresolved fault, node REA re-runs diagnostics to identify unresolved fault, the repair process and control ends when the node CEA is recognized as valid, differing diagnose and aggregate repair at the same time as several homogeneous and heterogeneous mobile communications in the field, based not on the type of these means of communication (radio, radio-relay, tropospheric, space, wired), and the type of equipment repair communication equipment (receivers, transmitters, power supply and antenna-feeder devices, and others belonging to different media types), identification (definition) type communication means connected to the repair body is chosen program of diagnosis, depending on the type of the connected communication tools, diagnostics equipment, means of communication, is determined by the degree of importance (priority) of the repaired equipment repaired in the means of communication, is the aggregate repair.



 

Same patents:

FIELD: information technology.

SUBSTANCE: in the method of creating control-diagnostic tests before creating the tests through digital shooting in optical range, pictures of the non-component side of the article with clear identification of types of radio components thereon and their position is obtained. For each combination of input test electrical signals, simultaneously with determination of standard values of parametres of electrical response signals from outputs of a standard sample of the article of the given type which is known to be fault-free, standard digital infrared images of the standard sample of the article of the given type are obtained through digital infrared video shooting, where the said infrared images display the differences between thermal conditions of the radio components in places where they are located on the fault-free standard sample of the article of the given type. The obtained data are entered into the computer data base of the control-diagnostic installation and are used for subsequent monitoring of correct operation and diagnosing faults in articles of the given type.

EFFECT: detection of faulty radio components without violating integrity of moisture-proof coating of the article, high efficiency and reliability of diagnosis.

5 cl, 2 dwg

FIELD: electricity.

SUBSTANCE: in device, comprising object of control, set of software-controlled sources of inlet test signals, set of digital metering parametres of response signals, control computer of device, there is additionally introduced digital video camera of infrared range, installed onto object of control with the help of adapter accessory, outlet of digital video camera of infrared range is connected to additional inlet of control computer of device, at the same time adapter accessory provides for fixation of digital camera lens with provision of full view of electric radio elements installed on object of control, and protection against effect of external radiations at results of diagnostics of controlled object faults.

EFFECT: invention provides for detection of faulty electric radio elements without damage to integrity of moistureproof coating of printed circuit boards, increased efficiency and validity of diagnostics.

3 cl, 4 dwg

FIELD: electricity.

SUBSTANCE: in method based on qualification of operable or faulty condition of controlled sample of radio electronic equipment (REE) depending on match or mismatch of measured values of parametres of electric signals of response and reference values of parametres of the same signals for operable condition of this type of REE, additionally infrared image (thermal image) of REE is produced with the help of digital video camera of infrared range with display of temperature conditions of electric radio elements (ERE) on it, as well as sections of electric circuits, and also their location in composition of REE sample, having detected REE faults by mismatch of measured and reference values of parametres of electric signals of response, produced infrared image of REE reflecting actual condition of ERE is compared with previously produced one, and results of comparison are used to determine location of faulty ERE to be replaced.

EFFECT: invention provides for detection of faulty electric radio elements without damage to integrity of moistureproof coating of printed circuit boards, increased efficiency and validity of REE faults diagnostics.

6 cl, 4 dwg

FIELD: electricity.

SUBSTANCE: device to control main parametres and operability of circuit board of control of electronic control system (ECS), current sensor (CS) and switch, comprises unit of supply, receiving part, central processor (CP) and converter of analog signal into digital one (ADC), control unit, unit of testing equipment, comprising tested CS, ECS circuit board and switch.

EFFECT: increased reliability of operation of electronic control system, current sensor and switch in process of operation.

2 dwg

FIELD: machine building.

SUBSTANCE: control system consists of control valve, of valve controller, of control line, of supporting component, of two pressure gauges, of logic, of processor, and of storage for recording threshold rate of change. The valve controller consists of two pressure gauges and is connected to a pneumatic actuator of the valve and to a solenoid valve for testing the valve actuator and solenoid valve under the on-line mode. To test the solenoid valve the valve controller measures pressure at various ports of the solenoid valve by actuating the solenoid valve for a very short period of time. The valve controller determines complete operability of the solenoid valve by derivative of difference between measured pressure signals, i.e. basing on rate of change of difference of measured pressure signals in time.

EFFECT: raised reliability of system functionality.

15 cl, 4 dwg

FIELD: information technology.

SUBSTANCE: apparatus for predicting system technical state has a shift-storage register, a unit for determining polynomial order, a circuit for connecting finite differences, a multiplier unit, a Newton time coefficient circuit, a delay element, a bus for setting the time point, a control unit, a computing unit designed for calculating a signal prediction on the selected model, a memory unit, an analysis and correction unit designed for calculating and correcting the prediction total error on a given algorithm, a unit for displaying prediction results.

EFFECT: broader functionalities of the apparatus owing to coordinated control and high accuracy of the apparatus owing to accounting for total prediction error.

1 dwg

FIELD: information technology.

SUBSTANCE: flight monitoring system has an onboard subsystem for collecting and transmitting flight information, and a subsystem for receiving and processing flight information in a ground air traffic control post. The flight monitoring subsystem has sensors for the state of separate units of the aircraft, conversation sensors, a unit for collecting and converting information, registers for process and conversation information, a unit for monitoring the state of the human operator, a unit for processing and preparing information and a unit for transmitting information. The subsystem for receiving and processing flight information has a unit for receiving information, an information register and an online information processing unit. The unit for monitoring the state of the human operator has human pulse and body temperature sensors, a pulse generator, a toggle flip-flop, a direct voltage source, setup units, a threshold element, pulse formers, recirculating shift registers, delay and comparator elements, pulse counters, AND and OR elements, a computing unit, an inverter, a digital-to-analogue converter, pulse formers, static flip-flops, control result memory registers, control result displays, an alarm (device for signalling deviation of the controlled parametre from the tolerance limits). Deviation of any of the controlled parametres from tolerance limits can be used to prevent accidents.

EFFECT: wide range of controlled parametres, in particular working of the heart of the human operator in real time, reliable operation of the flight monitoring system.

8 dwg

FIELD: information technology.

SUBSTANCE: equipment has a computer, a signal switch connected to not less than three monitoring units designed for connection to the monitored object. Each monitoring unit consists of a control unit, a multichannel comparator unit, a virtual standard, a load switch, a controlled load, a controlled power supply for output circuits, an output signal former, a switch and a standardisation unit.

EFFECT: broader functionalities of the device owing to possibility of measuring the level of the input power voltage in each channel and monitoring with nominal and maximum load, and high reliability of monitoring results.

2 cl, 1 dwg

FIELD: physics.

SUBSTANCE: method of determining a failed angular velocity sensor in a redundant system is based on periodic checking the relationship of measured motion parametres which characterises non-faulty operation of sensors, detecting the moment the relationship is violated, turning the system by a given angle φ0 from that moment, integration of measured parametres during turning, comparing signals received after integration with given signals after turning and determining the failed sensor from the comparison results.

EFFECT: broader functional capabilities of automatic control.

1 dwg

FIELD: electrical engineering.

SUBSTANCE: multi-purpose test bench serves to check up control systems of both new-range electric locomotives and operating ones. Test bench exploits industrial computer that has up to 20 free slots to receive standard adapters of available set and allows simulating, in fact, all required diagnostics signals. Adapters inserted in said slots are automatically connected to computer system bus and controlled by it as integral component of computer.

EFFECT: expanded performances in generating and reading off discrete, analog and pulse signals, reduced costs and simplified design, higher quality of signals.

1 dwg

FIELD: automatic control, applicable in systems with excessive quality of transducers, for example, accelerometers, a failure of one of which should not result in a failure of the control system.

SUBSTANCE: the method is based on a periodic check-up of relation between the measured parameters of motion characterizing the correct operation of the transducers, fixation of the moment of failure of the relation, comparison of the readings of the transducers at this moment and at the moment preceding the moment of disturbance of the relation, and determination of the failed transducer by the results of the comparison.

EFFECT: expanded functional potentialities due to possibility of determination of the failed transducer in any excess system.

1 dwg

FIELD: measuring and monitoring technique, possibly monitoring of different objects.

SUBSTANCE: system includes control unit, unit for calling testing programs, coupling unit, measuring unit, test stimulation unit, power sources, unit for distributing signals, memory unit, N matching units, N testing program units. Each testing-program unit has evaluation circuit and two memory devices.

EFFECT: lowered volume of equipment, simplified organization of monitoring process and development of software.

1 dwg

FIELD: electric measurements, applicable in check-up of tram and trolleybus electric apparatuses in the process of manufacture and in service.

SUBSTANCE: current in the current source is fed to the current winding of the current relay from the rectifier via a key, choke, shunt. The device uses a pulse-width modulator that controls the keys, slowly varying voltage is applied to the modulating input of the pulse-width modulator that is preliminarily modulated by the rectifier ripple voltage. Besides, use is made of a sample-release circuit of operate (release) currents and voltages. The signals from these circuits are fed to indicators via analog-to-digital converters.

EFFECT: reduced error of determination of operate and release current and voltage relays, enhanced capacity of check-up in the device due to reduced ripples of the source of smoothly varying current.

2 cl, 4 dwg

FIELD: mechanical engineering.

SUBSTANCE: method comprises determining variations of the parameter during acceleration and deceleration of the actuator. The device comprises generator and OR-NOT unit, the inputs of which are connected with the outputs of the relay. The output of the relay is connected with the input of the generator.

EFFECT: enhanced accuracy of the method and simplified device.

3 dwg

FIELD: instrumentation engineering; serviceability check of multichannel communication systems.

SUBSTANCE: proposed equipment includes personal computer, multiplexing switch, circuit checkup unit, control unit, multichannel comparison unit, virtual standard, switching unit, output signal shaper, multiplexer, and normalizing unit that has voltage meter and circuit meter.

EFFECT: enlarged functional capabilities of device.

3 cl, 1 dwg

FIELD: measuring equipment.

SUBSTANCE: as a source of standard signal not separate generator of test signal according to known code structure is used, but a component of modem, to provide for substantial simplification of process under unfavorable conditions.

EFFECT: higher efficiency.

1 dwg

FIELD: automated control and diagnostics systems.

SUBSTANCE: first variant of complex includes control computer, mating block, commutator, local data exchange main, tests forming block, logical analyzer, signature analyzer, synchronization block, digital oscillographs block, special form signals programmed generators block, programmed power-sources block. Second variant of complex additionally includes block for forming high-frequency test signals and block for measuring high-frequency signals.

EFFECT: broader functional capabilities, higher efficiency, higher reliability.

2 cl, 2 dwg

FIELD: automatic control.

SUBSTANCE: device has first and second analog-digital converters, first and second coefficients forming blocks, first and second multiplication blocks, counter, first and second integrator, control effect forming device, division block, buffer and registering block, while coefficients forming blocks are made in form of digital filters and all remaining blocks of device are made digital.

EFFECT: higher precision, higher resistance to interference.

1 dwg

FIELD: measuring equipment.

SUBSTANCE: device has block for forming control and stimulation signals, block for forming standard signals, multiplication blocks, frequency transformer, phase rotator, commutator, frequencies grid generator, integrators, blocks for square involution, adder, normalization block, key, analog-digital converter, comparison circuits, memory blocks, registers, information output block, interval estimation block (for setting lower and upper limits of trust range for each measured value of mutual difference coefficient of distorted and standard signals) and block for analysis of number of support values of mutual difference coefficient (to exclude from further processing results of measurements, for which within limits of trust interval number of support values of coefficient exceeds allowed limit).

EFFECT: higher precision.

2 cl, 2 dwg

FIELD: technical diagnostics.

SUBSTANCE: method includes, for each set of input test signals, forming of prior matching response signals for intermediate points of controlled device. Received response signals at outputs of product are compared to parameters of standard response signals and level of their match is determined, in case of mismatches broken branch of functional circuit is determined and diagnostics is repeated by substituting all formed combinations of input signals, after that diagnostics of erratic portions is started.

EFFECT: simplified method.

3 dwg