Method to form lane in winter period

FIELD: mining.

SUBSTANCE: in method to form lane in winter period, including laying of heat insulation material onto water surface in the form of balls arranged as hollow with rigid plastic or silicon shell, besides, required quantity of balls per 1 m2 of water surface is determined using mathematical formula.

EFFECT: reduced environmental damage done to ambient water medium and prolongation of production season in winter period.

1 ex

 

The method applies to mining, marine and other industries associated with work in the winter, and can be used for the education of the lane.

Known methods of creating a lane based on the change in the intensity of heat transfer surface water to the atmosphere by applying onto the surface of the water in the main floating pins (Altaner IM Technology and complex mechanization of surface mining. Part 3. Dredging and underwater mining: a Textbook for high schools. - M.: Publishing house "World mountain books, 2006. - Book 1: Developing species-hydro and suction apparatus. - 546 S.)

The disadvantage of this method is that the foam is an environmentally friendly material, as it contains toxic substances that cause environmental damage to water bodies. Also there is a lack in the technology of applying the foam to the surface, as laying the next layer of foam is produced in a certain period of time after laying the initial layer of foam.

The closest to the technical nature of the proposed method is a method of saving water in the reservoir for technical purposes, which consists in laying on the surface of the water foam cover, made in the form of a set of identical or different sizes penoplastovym the balls, placed freely on the water surface (patent RF №2049199, IPC EV 15/00, publ. 1995.11.27).

The disadvantage of this method is that the foam is not an environmentally friendly material because it possesses a fragile properties and in certain conditions, crumbles easily, which leads to contamination of the aquatic environment.

The main objective of the method is to reduce the environmental damage to the surrounding aquatic environment, and in the renewal of the mining season in the winter by reducing heat transfer rate to the surface of the water with the atmosphere, which prevents ice formation on the surface of the reservoir and allows the dredgers and drag to maneuver freely.

This is achieved in the way of education lane in winter, including laying on the surface of the water heat insulating material in the form of balls, hollow hard plastic or silicone shell, and the required number of balls per 1 m2the water surface is determined by the formula:

;

where ks- coefficient taking into account the increase in free water surface while maneuvering vessels and dredges in the area, filled with balls, m2;

;

kt- temperature coefficient that takes into account the dependence on the diameter of the balls;

ΔS - when Amenia square, m2;

d is the diameter of the balls, m; π=3,14.

The method consists in the use of balls of hard material of low heat capacity (plastic or silicone). The air inside the balls serves as a heat insulator, which prevents namerzanie ice. Moreover, there is a certain number of balls, which is proportional to the square of the lane.

The method is as follows.

Framing area in which to maneuver dredge (dredge). Within the inner contour of the surface is covered with insulated floating material, made in the form of hollow spheres. The outer part of balls made of a hard shell with maximum antiadhesive properties, plastic or silicone coating, and these coatings are environmentally friendly. Application of hollow spheres on the surface of the reservoir significantly reduces not only evaporation but also the convective and radiative components of the heat exchange. The spherical shape gives free maneuvering the dredgers and drag. Required number of bulbs 1 m2the water surface is determined by the formula:

;;

where ks- coefficient taking into account the increase in free water surface while maneuvering vessels and dredges in the area, zapolnenie the balls;

kt- temperature coefficient that takes into account the dependence on the diameter of the balls; ΔS - increment area, m2; d - the diameter of the balls, m; π=3,14.

Example: for lane area of 600 m2the required number of balls with a diameter of 0.1 m is 76 433 units

The way education lane in winter, including laying on the surface of the water heat insulating material in the form of balls, wherein the balls are hollow with hard plastic or silicone shell, and the required number of balls per 1 m2the water surface is determined by the formula:

where ks- coefficient taking into account the increase in free water surface while maneuvering vessels and dredges in the area, filled with balls, m2;

kt- temperature coefficient that takes into account the dependence on the diameter of the balls;
ΔS is the increment of area, m2;
d is the diameter of the balls, m; π=3,14.



 

Same patents:

FIELD: mining.

SUBSTANCE: method involves opening and arrangement of peats, processing of solid placer sections with dragging equipment and formation of dumps of waste sands. Development of placer in each section is performed after overburden operations and arrangement of peats in external dumps with bulldoser equipment with arrangement of waste sand dumps in worked out area at common border of two adjacent runs.

EFFECT: increasing development efficiency of clay sands.

6 dwg

FIELD: mining.

SUBSTANCE: invention relates to mining and may be used for development of natural and technogenic high-clayey gravel deposits of minerals with an increased content of fine-grained and disperse-grained gold. The method involves deposit opening, digging a water supply trench slanted towards the deposit stratum drop and a water collection trench; the accumulator trench is dug between the area under development and the water collection trench. One mounts the suction device of the delivery hydrotransportation installation, mounts an ultrasonic installation relative to the accumulation trench, consistently intensifies filtration of water into the clay sands within the flooded area on the surface and by way of hydrodynamic activation and performs cutting the water saturated sand layers with the hydrodynamic equipment cutter elements, additional hydrodynamic initiation and ultrasonic impact on the hydromixture in the accumulation trench in the low frequencies band providing better effect of hydromixture particles displacement and ultrasound radiation intensity 5 W/cm2 or more.

EFFECT: improved efficiency of destruction and disintegration of deposit clay sands.

1 tbl, 2 dwg

FIELD: mining.

SUBSTANCE: invention relates to mining and may be used for development of natural and technogenic high-clayey gravel deposits of minerals with an increased content of fine-grained and disperse-grained gold. The method for softening and disintegration of shallow deposit clay sands involves deposit opening, digging a water supply trench slanted towards the deposit stratum drop and a water collection trench of a depth with a difference of bottom marks in the trenches from 1.5 to 3 m, filling the water supply trench with water with simultaneous water-filling of the deposit area under development to a depth sufficient for mounting and installation of equipment in a floating state and subsequent maintenance of the level for primary softening of clay sands by way of supply of water through an adjustable shutter, mounting the delivery hydrotransportation installation, process of natural filtration of water into the bulk. One mounts an ultrasonic installation and a mechanical installation. Successively one intensifies filtration of water into the compacted sand strata by way of ultrasonic impact on the sands along the surface of the site being developed by means of radiation in the interval of low ultrasonic frequencies ensuring maximum amplitude of displacement of compacted sand particles and radiation intensity parameters creating stress-strain tension, resistance to rupture and shear exceeding the normative data for deposit frozen sands strength. One performs intensification of disintegration of water-saturated sand surfaces with ultrasound at the same radiation frequency but reduced parametres of ultrasonic radiation intensity corresponding to the averaged equilibrium density and compressibility of water saturated sands. Then one performs hydrodynamic activation by way of mixing the hydromixture with an element of the mechanical installation and supply of the hydromixture with the help of the delivery hydrotransportation installation to the concentrating installation.

EFFECT: improved efficiency of destruction and disintegration of deposit clay sands.

2 dwg, 2 tbl

FIELD: mining engineering.

SUBSTANCE: method includes development mining, layerwise digging of sands on yard, storing and transportation for washing. Additionally yard is divided for sections of width, equal to length of scraper cut, layerwise digging is implemented by alternation of cuts throughout the site by maximal thin facings, and storing of sands is implemented palletise on adjacent by width of yard section, during predrying of sands in pile they are directed to washing. Then process is repeated on adjacent by length sections of yard, after what works are repeated on adjacent by width sections backwards.

EFFECT: predrying of clayey grounds.

2 cl, 1 dwg

FIELD: mining.

SUBSTANCE: invention is related to mining industry and may be used in overburden and getting operations in gravel deposits of minerals, with application of bulldozer-scraper aggregates. Method includes overburden operations, excavation and transportation of sands by bulldozer-scraper aggregate to enrichment equipment. Primary transportation of sands is carried out to specially prepared or developed space with arranged trench in bedrock along lower edge of bench with creation of slant, and secondary transportation of sands to enrichment equipment is done from slant of bench.

EFFECT: increased efficiency of getting equipment.

3 cl, 4 dwg

FIELD: mining.

SUBSTANCE: invention refers to open development of mineral placers, particularly to mining and concentration of gold containing placers in winter. The procedure consists in exposing works, in sand excavating and in sand transporting to a basin, in flushing and in dump piling. Also, in winter primary excavation and sand transporting are performed with preliminary piling sand on ice of the basin, while the secondary excavation and flushing are carried out in a warm season.

EFFECT: increased degree of disintegration of hard flushed clayish sand and reduced losses of valuable component.

2 cl, 2 dwg

FIELD: oil and gas industry.

SUBSTANCE: invention refers to development of mineral deposits, particularly clay placers, and can be implemented in mining industry. The method consists in striking developed placers, in their layer-specific excavation with parallel trenches leaving between-trenches massifs, in concentrating and in piling. Also between the first trench and the circuit of developed deposit an additional ditch is made, wherein water is supplied; when a successive trench is entered, each preceding trench is successively filled with water. When the last trench is driven, deposit is flooded; between trenches massifs are debugged by means of a drag or dredger; notably, debugging is performed from the first trench to the last one.

EFFECT: increased efficiency of clay placers development by means of increased degree of disintegration and extraction of valuable component at reduced technological losses.

2 cl, 2 dwg

FIELD: mining.

SUBSTANCE: invention refers to development of deposits, particularly, gravel deposits, and can be implemented in mining industry. The method consists in stripping sand, in excavating and transporting sand to a hopper of a washing installation, in concentrating and in piling. Prior to transporting sand into the hopper of the washing installation, sand is piled in a trench laid in the center of the gravel deposit along the length of a production block at the depth below the level of the soil of the sand bed; the trench is filled with water. Also sands are piled in the trench below the water level, and their successive excavation is performed by the underwater method.

EFFECT: increased degree of disintegration of hard washed clayish sand and reduced process losses of valuable component with reduced cost for sand transporting.

2 dwg

FIELD: mining.

SUBSTANCE: invention refers to development of connate gravel deposits of solid minerals, particularly beach deposits of shelf. The method of development of connate water-flooded placers consists in preliminary concentration of useful component of sands in a lower part of the placer by means of excitation of elastic vibration and in successive stopped excavation. A tubular casing is introduced into the placer; the height of the casing exceeds the distance from the surface to the raft of the placer, excitation of elastic vibration in placer sands is performed by means of their transmission from surface via the tubular casing. Further a compressive force onto contacting surface, covering volume of empty material, is exerted from the side of interior surface of the casing. Then lower part of placer is hydraulically excavated by means of supply of washing water through nozzles arranged at walls of the tubular casing; pulp is withdrawn through soil draw-off apertures made at walls of the tubular casing between nozzles. Also after completion of excavation of lower part of the placer, pressure onto the surface, covering volume of empty material contacting with interior surface of the casing, is dropped to zero. When the cavity of the casing has been filled to a level corresponding to a ground level, the casing is pulled off.

EFFECT: increased selective extraction.

3 dwg

FIELD: mining.

SUBSTANCE: hydro-transporting pressurised system with elements of cavitation consists of pipe with bends and of connected between them narrowing and expansion elements. The system is equipped with complex of jet aero-hydrodynamic cavitation and with a rigidly fixed vortex. The narrowing element and expansion element are connected non-rigidly and pressure tight. The system of jet aero-hydrodynamic cavitation consists of an upper and lower nozzles directed so as to provide air supply along the motion of the main direction of hydro-flow in the zone of the expansion element. Also the system of jet aero-hydrodynamic cavitation is installed between the narrowing and expansion elements. The interior diameter of the end of the expansion element coupled with the narrowing element through seal rings is bigger, than the interior diameter of the narrowing element end. The crevice of the upper nozzle is installed so as to direct air supply to the wall of the expansion element, while the crevice of the lower nozzle is installed to direct air supply to the central part of the main direction of hydro-flow motion. Vortexes are arranged inside the narrowing and expansion elements and are made in form of right triangles.

EFFECT: intensification of process of sand-clay rock destruction by means of aero-hydrodynamic cavitation with pressurised hydro-transporting to systems of deep processing.

5 dwg

FIELD: transport.

SUBSTANCE: invention relates to ice breaking equipment and can be used to break ice blocks during spring ice drift. Proposed device generates dynamic forced under ice cover and comprises casing and floating system. It incorporates flexible system of gas and electric power supply system connected to aforesaid casing to feed power and gas into device. Said casing represents a barrel with flange arranged nearby barrel wall outer edge. Channel is arranged in barrel wall and its flange to accommodate flexible system of gas and electric power supply system. Spark plugs are fitted inside the barrel to ignite gas mix under the device casing barrel. There are gas mix combustion products exhaust holes.

EFFECT: higher efficiency of ice breaking.

2 dwg

FIELD: construction.

SUBSTANCE: invention relates to the field of research of physical-mechanical properties of ice as material in ice technology, in particular to mechanical methods of ice destruction for the purposes of economic activity. Method for local destruction of ice cover from under water by means of mechanical action with stiff reservoir filled with air. Initiating ring is fixed on head part of stiff reservoir vessel to create preliminary concentration of load onto lower surface of ice cover, stability of stiff reservoir in floating is maintained through rotation generated as water ballast is displaced from nozzles arranged in lower part of stiff reservoir, which are lifted relative to its bottom and turned at the angle of 45° to reservoir vessel in horizontal plane.

EFFECT: increased efficiency of mechanical action at ice cover, reduced power inputs.

2 dwg

FIELD: transport.

SUBSTANCE: invention relates to ice breaking device intended for to eliminate ice blocks during spring ice drift. Proposed device is intended for generating dynamic effects under ice sheet and comprises case with flexible system connected thereto and including gas hose and electric conductor. Said case consists of top and bottom barrels inserted one into another to move vertically. Bottom of each barrel is directed outward. Lower barrel bottom outer side has a recess to accumulate gas mix. Mix ignition plugs are arranged at top part of said recess. Recess communicates with channel made in bottom barrel wall to allow passage into flexible system channel. Top barrel sidewall has holes to eject burnt gas mix.

EFFECT: high efficiency of ice breaking.

2 dwg

FIELD: transportation.

SUBSTANCE: invention is related to technology of performance of ice crust breaking works for navigation under conditions of ice cover availability and may find wide application in the field of construction and transportation of object of different purpose. Method for maintenance of channels in ice covers consists in the fact that after channel creation, in order to maintain it, surface works are carried out at near-channel ice field for its weakening, and channel for ice breaker passage is restored with application of ice field weakening. When performing surface works, heat-conductive and externally heat-insulated plates are fixed at edges of channel as separated from each other, with height corresponding to ice thickness, with contacts for current supply. When ice breaker passes with buses extended upfront on rods, current is passed by contacts through plates from on-board source, plates are heated till slots are produced in ice, and ice weakened by slots is broken by ice breaker hull.

EFFECT: reduced power inputs for destruction of ice cover, improved economical efficiency and productivity of works, expansion of scales and increased repletion of application of method for maintenance of channels in ice covers.

FIELD: mechanical engineering.

SUBSTANCE: invention refers to hydraulic structures, specifically to open uncontrolled spillway of low and medium head waterworks facilities operating in severe ice conditions. The spillway contains crest weir, side walls and conjugation structure made of concrete and metal ice-guarding long-length elements which are located from bottom side from back of weir at intervals from each other, each in new transverse plane of crest weir, attached to crest weir and project over its overflow surface. Amount of ice-guarding element projection crest elevation over weir crest α provides holding ice of design thickness bdes before crest weir until water level before crest weir rises by target value of its elevation over weir crest hspec. In this case following inequations are fulfilled: hspec.<α+bdes.<hmax., where hmax. is value of design maximum elevation of water level before crest weir over its crest.

EFFECT: invention allows for lowering ice force, increasing water flow during ice passing through crest weir, raising intensity of ice fragmentation over weir crest, reducing metal consumption of ice-guarding elements and lowering the intensity of ice jamming in afterway of waterworks facility.

2 cl, 7 dwg

FIELD: construction.

SUBSTANCE: invention is related to the field of hydrotechnical structures operation and is intended for reduction of ice loads at hydrotechnical structures during spring ice motion. In period that precedes spring ice drifting, ice field is coated with tapes of elastic synthetic material of black colour with width that makes from 1 to 1.5 of average thickness of ice so that these tapes create fragments of uncoated ice inside in the form of rhombs, which are inverted with their sharp angle of 30 - 60° along with direction of river flow to the side of hydrotechnical structure site and size of largest rhomb side of not more than 1/3 - 1/4 of distance between intermediate supports. In order to increase light flux absorbed by tapes of black colour elastic synthetic material, parallel to then and behind them relative to sun, tapes of white colour elastic synthetic material are arranged on vertical frame made of, for instance wood or wire, at the distance from tapes lying on ice, which provides for reflected light ingress at black coloured tapes in midday astronomic for this area.

EFFECT: provides for prevention of ice piling and reduction of its load at intermediate supports of hydrotechnical structure during the first ice motion of spring ice drifting by increase of solar radiation energy absorption, which is achieved by means of absorption of both direct and reflected light flows, higher safety of works during ice passing and reduced operational costs.

3 dwg

FIELD: agriculture.

SUBSTANCE: invention relates to creation of suds crosswise stream canal. Method includes creation of sud crosswise river and implementation of suds higher sud with stream of river. Sud is created in narrow place of river with stabile against washing out banks by means of placing on ice crosswise stream canal of stack made of rubble stone, implemented in the middle as more higher and with decreased to edged, which is bottomed at ice melt a little, crushing thin layer of ice by own gravity of stack and overlapping water stream for its runout from ice holes and ice mound formation.

EFFECT: invention increases irrigated area of meadows, reduces costs for arrangement of sud.

2 dwg

FIELD: technological processes.

SUBSTANCE: invention is related to technology for elimination of ice jamming in rivers, and also to facilities for creation of navigable channels. Method for elimination of ice jamming is realised by creation of high pressure area of dynamic action under ice cover. High pressure area of dynamic action is created in closed space limited by sleeves of cylindrical shape. Sleeves are inserted one into another and have possibility of displacement relative to each other in vertical direction. Damage of ice is realised by dynamic action of upper sleeve bottom at internal surface of ice cover caused by explosion of gas mixture supplied between two sleeves.

EFFECT: invention makes it possible not to distribute explosive wave at surrounding aqueous medium of basin, to repeatedly realise method for elimination of ice jamming in one and the same device, and also to considerably reduce power inputs.

2 dwg

FIELD: hydraulic engineering.

SUBSTANCE: invention is intended for ice jam liquidation, appearing during periods of ice drift before the stream crossing. Method is in jam is destructed by means of creation under the ice in the water of high hydraulic pressure. At first it is visually defined place of the highest accumulation of broken ice, i.e. jam centre and three nearest to this place bridge supports with central support located opposite to jam center. Then jam is destroyed by means of creation in water high hydraulic pressure before each of bridge support at the expense of electrohydraulic effect, appearing at high-voltage pulsed discharge, discharges are made by means of electrohydraulic facilities, preliminarily installed on the bridge supports on the level of knowingly lower of low ice surface. At first it is implemented simultaneously discharges at end supports, and then after time t - at central support, at that t=(ℓ/υp)+(λ/4υp), where: ℓ - distance between supports; υp - velocity of propagation of flexural-gravitational wave in ice cover; λ - length of flexural-gravitational waves.

EFFECT: arising interference of flexural-gravitational waves exceed effectiveness of ice destruction, and river stream provides passage of hummocked ice between bridge supports.

FIELD: hydraulic engineering.

SUBSTANCE: invention is intended for ice jam liquidation, appearing during periods of ice drift before the stream crossing. Method is in jam is destructed by means of creation under the ice in the water of high hydraulic pressure before each of bridge support at the expense of high-voltage pulsed spark discharges. Discharges are implemented by means of electrohydraulic facilities, preliminarily installed on supports knowingly lower of low ice surface. Discharges are implemented alternately from support to support, starting from facilities located on and supports, i.e. at river banks, to the middle of stream canal with time lag, equal to passage time of the first vertex flexural-gravitational waves, roused in hummocked ice by area of high pressure, from one support till the first nearest.

EFFECT: arising interference of flexural-gravitational waves exceed effectiveness of ice destruction, and river stream provides passage of hummocked ice between bridge supports.

FIELD: blasting operations, applicable for destruction of continuity of the ice or soil cover and formation of a passage in them, for example, for destruction of an ice gorge.

SUBSTANCE: the method consists in placement of parachute systems with ammunition on the flight vehicle, their delivery to the preset point, release and blast of ammunition. Elongated flexible explosive charges with initiating devices with a preset delay time connected with one end to penetrators, and with the other end - to the parachutes, assembled in packing cases, are used as ammunition. After the release, the parachute systems turn the flexible explosive charges to the rectilinear position with the penetrators down, separate them from the parachute systems, and the initiating devices are systems, and the initiating devices are remotely cocked.

EFFECT: enhanced efficiency of destruction of the ice or soil cover.

10 dwg