Method for making well for rolled-screw pile and device for its realisation

FIELD: construction.

SUBSTANCE: method for making well for rolled-screw pile including drilling of conventionally cylindrical well. Roller unit and step accessory are connected to auger, device rotation is actuated for thread rolling, roller unit is brought into well, and thread making is started with the help of three rollers with various diametres and thicknesses in the form of truncated cone each, which are serially rolled one after another, and soil is impressed into well wall with angle of thread inclination between plane, where large wheel of each roller is located, and axis of roller unit rotation, making 76 degrees. Master roller executes primary rolling of thread, then intermediate roller of larger diametre and thickness expands groove, increasing thread dimension, and shaping roller of larger size completes soil compaction into well wall and thread rolling. Pitch, which provides for step accessory on auger per single complete rotation of shaping roller equal to 360 degrees makes 0.67 d, where d is diametre of roller unit pipe, and thread pitch corresponds to pitch of single turn of auger blade. Step accessory operates only in process of thread rolling together with rolling unit, and thus thread is rolled for the whole depth of well, reverse rotation is started, and roller unit is brought upwards along shaped thread, afterwards well is inspected and concreted. Device for method realisation comprises auger for drilling of conventionally cylindrical well, device for thread rolling made of roller unit, auger and step accessory. Roller unit includes steel pipe with diametre d with slots for rollers, steel bushings for axles of rollers, master roller with diametre of 0.52 d, intermediate roller with diametre of 0.71 d, shaping roller with diametre of 0.83 d, cover with tail, bottom. All three rollers are arranged as steel and are shaped as truncated cone, and straight line that coincides with diametre line of large wheel in each roller, crossing axis of roller unit rotation, is perpendicular to generatrix of pipe cylindrical surface in point of their crossing, and plane of each roller fit, i.e. plane of roller unit rotation axis crossing with point of crossing of roller rotation axis and large wheel of roller are at the angle of 120 degrees to similar plane of fit of each of two rollers.

EFFECT: simpler, affordable and cheaper arrangement of well for rolled-screw pile of high bearing capacity with the help of facilities for well drilling.

7 cl, 5 dwg

 

The invention relates to the field of construction and is intended for production wells procurementof piles (PVA) high bearing capacity in soils of sedimentary origin for foundations and anchor buildings and structures.

The closest analogues of the invention are a method of manufacturing Borovikova piles (RF patent No. 2220256 from 27 Dec. 2003) and device for drilling wells Borovikova piles (RF patent No. 2261955 from 10 Oct. 2005). They are intended for production wells with an auger that drills slowmotionnoise well (UCS), with further threading the two cutters, and not rolling thread three rollers, as in the present invention. The disadvantage of them is very complex, bulky and expensive equipment, which is not always possible to make and use, and lack of compaction of soil in the borehole, increased yield of the soil from it and lower the carrying capacity Borovikova piles in comparison with the proposed invention.

The invention consists in a new method of production wells using the device for thread rolling (UPR), which draws the thread for PVA in a pre-drilled UCS successive rolling and pushing soil in her three steel rollers of different diameters and thicknesses, in fo the IU truncated cone each, with the estimated pitch, which provides a selection device (hereinafter - WOOFER) screw mounted on the drilling machine, which distinguishes the invention from similar.

The technical result of the invention is more easily available and less expensive production wells for PVA with a large number of tools for drilling, and soil compaction in the borehole rollers (up to 40% of its volume) with the simultaneous execution of threads, which significantly increases the bearing capacity of the PVA reduces the amount of excavation work and reduces its unit cost, i.e. the cost of 1 ton bearing capacity of the pile, in comparison with other types of piles.

List of drawings attached then has the following form:

- figure 1 shows the view panel on the drilling machine and the form is ready for concreting well, where 22 - drilling machine, 23 - panel, 24 - ready to construct the well.

- figure 2 shows a General view of the panel, with 1 roller Assembly, 2 - screw 3 - step device (GSR), 4 - rotation drive mechanism;

- figure 3 shows the roller Assembly, where 5 - steel pipe with diameter d, 6 - cover with shank, 7 - plate, 8 - bolt, 9 - lead roller 10 to the intermediate roller 11 is subject to the roller;

- figure 4 shows a cut 1-1 roller node, where 12 - steel axle, 13 - steel sleeve, 14 - bolts;

- figure 5 shows a noise reduction, where 15 is the reference swell the EP, 16 is a plate of sheet steel, 17 - resistant saddle, 18 - post, 19 - chain coupler, 20, 21 - fastening for chain tie.

The device for implementing the method of the production wells for PVA is a panel (figure 2), which consists of a roller node 1, the screw 2 and the current 3. Roller Assembly (figure 3, figure 4) consists of a steel pipe 5 with a diameter d with slots for the rollers to which the inside is welded to the sleeve 13 to the axes of the rollers 12 secured by bolts 14, and also from the leading roller 9 with a diameter of 0.52 d, the intermediate roller 10 with a diameter of 0.71 (d, designing roller 11 with a diameter of 0.83 d, cover with shank 6, the bottom 7, the bolts 8 for tops and bottoms to the pipe 5 with welded corners. Auger 2 (figure 2, figure 5) - welded steel construction, consisting of a tube (shaft screw), screw blades and join the rotation drive 4 (2) of the drilling machine and the roller node 1. GSR 3 (figure 2, figure 5) consists of the sill 15, fixed to the frame of the drilling machine, to which is welded a plate of sheet steel 16 and resistant saddle 17, resting and moving on the shaft of the auger between the two edges of the helical blades. Hard saddle 17 with fasteners 20,21 fixed chain coupler 19, holding the panel during rotation. All three roller - steel, have the shape of a truncated cone, each with a variable angle between the diameter of the big circle and forming (figure 3), and PR is may, coinciding with the line of the diameter of the big circle of each clip, intersect the axis of rotation of the roller node perpendicular to the generatrix of the cylindrical surface of the pipe at the point of their intersection. The plane of each of the roller, i.e. a plane crossing the axis of rotation of the roller node 0 (figure 4) with the point of intersection of the axis of rotation of the roller, and a large circle roller (figure 3), are at an angle of 120 degrees to the same plane landing each of the other two rollers. In addition, the following design parameters panel describing the invention only in particular cases of its implementation and use, change, and therefore they are included as dependent claims of the invention the device for implementing the method of the production wells for PVA, namely:

1) the design of the panel is the same except that all three rollers are in the form of a truncated cone with an angle between the diameter of the big circle and forming 44 degrees and each of the rollers is the angle between the plane in which lies a large circle roller, and the axis of rotation of the roller node 76 degrees:

2) design of the panel is the same except that all three rollers are in the form of a truncated cone with an angle between the diameter of the big circle and forming 43 degrees and each of the rollers is the angle between the plane in which lies a large circle roller, and the axis of rotation of the rollers is th node 77 degrees;

3) the design of the panel is the same except that all three rollers are in the form of a truncated cone with an angle between the diameter of the big circle and forming 42 degrees and each of the rollers is the angle between the plane in which lies a large circle roller, and the axis of rotation of the roller node 78 degrees;

4) the design of the panel is the same except that all three rollers are in the form of a truncated cone with an angle between the diameter of the big circle and forming 41 degrees;

5) the design of the panel is the same except that all three rollers are in the form of a truncated cone with an angle between the diameter of the big circle and forming 40 degrees.

The device and method of manufacturing well for PVA are as follows. First Buryat UCS using auger with cutting part (bit, zaboric), then disconnect the cutting part and the screw attached roller Assembly and noise reduction, then include the rotation panel, roller Assembly is slid into the well and begin execution of the thread by means of three rollers of different diameters and thicknesses, in the form of a truncated cone each, which are sequentially rolled and pressed against the ground in a borehole wall with an angle of inclination of the thread between the plane in which lies a large circle of each roller and the axis of rotation of the roller node 76 degrees, and the leading roller is the primary about ATCO thread then the intermediate roller of larger diameter and thickness extends deepening, increasing the size of the thread and draw roller even larger completes the sealing of the soil in the hole wall and the rolling of the thread, and her step that provides current to screw one full turn of 360 degrees. subject roller is 0.67 d, where d is the pipe diameter. Noise reduction (figure 5) provides a well-defined current thread pitch, without which normal operation of the PVA is impossible, since it regulates the forced longitudinal translational movement of the roller node in UCS with pitch, which corresponds to step one coil of the helical blade of the screw. WOOFER mounted stationary on the drilling machine relative to the borehole during rotation of the auger it slides his shaft between two adjacent edges of the helical blades and works similarly fixed nut, which twist the bolt. Noise reduction only works during the thread rolling with roller node and it is removed during the drilling UCS. So make rolling the thread on the depth of the hole, stop the rotation mechanism includes a reverse rotation and roller Assembly take up decorated with carving, after which the mechanism clean, and well check and concreted. In the process, the axis of the rollers, sitting in the bushings can be removed and replaced completion of the replacement or change of location of the rollers to change the construction of well and pile, designed for pressing or pulling the load.

1. A method of manufacturing well for rolling-screw piles, including drilling conventionally cylindrical bore, wherein the auger is attached roller Assembly and selection device includes a rotating device for thread rolling, roller Assembly is slid into the well and begin execution of the thread by means of three rollers of different diameters and thicknesses, in the form of a truncated cone each, which are sequentially rolled and pressed against the ground in a borehole wall with an angle of inclination of the thread between the plane in which lies a large circle of each roller and the axis of rotation of the roller node 76, and the leading roller is the primary thread rolling then the intermediate roller of larger diameter and thickness extends deepening, increasing the size of the thread, and executing the roller even larger completes the sealing of the soil in the hole wall and the rolling of the thread, in addition, the step which provides the stepping device on the screw in one full turn of 360 will be subject roller is 0.67 d, where d is the pipe diameter roller node, and the thread pitch corresponds to step one spiral blade of the auger, besides stepping device which operates only during the thread rolling with roller node, and thus produce rolling is asibi on the depth well, include reverse rotation and roller Assembly take up decorated with carving, then well examine and concreted.

2. The device for implementing the method of the production wells for rolling-screw piles containing auger for drilling conventionally cylindrical bore, characterized in that it has a device for thread rolling, consisting of a roller node, screw and stepper devices, where the roller Assembly includes: steel pipe with diameter d with slots for the rollers, steel bushings for the axes of the rollers, the leading roller with a diameter of 0.52 d, an intermediate roller with a diameter of 0.71 (d, surrounding the roller with a diameter of 0.83 d, the cap and the shank, the bottom, the three roller is made of steel and have the shape of a truncated cone, and the straight line coinciding with the line of the diameter of the big circle of each clip, intersect the axis of rotation of the roller node perpendicular to the generatrix of the cylindrical surface of the pipe at the point of their intersection, and the plane of each of the roller, i.e. a plane crossing the axis of rotation of the roller node with the point of intersection of the axis of rotation of the roller, and a large circle roller, are at an angle of 120 to the same plane landing each of the other two rollers.

3. The device according to claim 2, characterized in that the angle between the diameter of the big circle and forming a truncated cone, each role is and is 44, and the angle between the plane in which lies a large circle of each roller and the axis of rotation of the roller node is 76.

4. The device according to claim 2, characterized in that the angle between the diameter of the big circle and the generatrix of the truncated cone of each clip is 43, and the angle between the plane in which lies a large circle of each roller and the axis of rotation of the roller node is 77.

5. The device according to claim 2, characterized in that the angle between the diameter of the big circle and the generatrix of the truncated cone of each clip is 42, and the angle between the plane in which lies a large circle of each roller and the axis of rotation of the roller node is 78.

6. The device according to claim 2, characterized in that the angle between the diameter of the big circle and the generatrix of the truncated cone of each clip is 41.

7. The device according to claim 2, characterized in that the angle between the diameter of the big circle and the generatrix of the truncated cone of each roller is 40.



 

Same patents:

FIELD: construction.

SUBSTANCE: device for screwdriving of piles is related to construction and may be used for erection of bearing foundations, fixation of various mechanisms and devices on soil, also under conditions of frozen soils in process of screwdriving of metal tubular piles. Device comprises spinner 1, reducer 2 and cartridge 3, which is arranged in the form of bushing with longitudinal slot and horizontal axis. Lower part of cartridge 3 is equipped with grips with handle and spring-loaded fixator, besides grips have dead slots. Horizontal axis is made with cylindrical protrusions at ends, and longitudinal slots of bush are arranged as stepped and closed. Device may additionally be equipped with the second horizontal axis, detachable pad made of two plates, in which holes are arranged for horizontal axes, at the same time in one of plates holes are made with figure shape, and at one end of horizontal axes there are slants arranged with similar figure shape.

EFFECT: invention makes it possible, due to reduction of time for pile preparation for lift, its fixation in cartridge, to significantly increase efficiency of works on piles driving, and also to improve conditions of work, since all works are carried out not at height, but on ground, in close proximity to area of pipe screwdriving.

2 cl, 10 dwg

FIELD: construction.

SUBSTANCE: invention concerns bored pile construction in any soil environment, and can be applied in industrial and civil construction for construction of new foundations and reinforcement of existing ones, as well as in construction of supports bearing alternate loads. Method involves well drilling by drilling assembly consisting of drilling column and rock crusher, filling the well with solidifying mix, drilling column extraction from well, downtake of metal frame. Well drilling is performed with crushed rock discharge to surface by flush liquid or compressed air fed to bottomhole through hollow drilling column. Simultaneously with well drilling, metal frame made of reinforcement rods with helical flange at external surface is taken down by rotation. Frame is mounted coaxially along drilling column and can rotate together with it. Drilling column is extracted from well together with rock crusher, along with uninterrupted filling of well with solidifying mix through hollow drilling column.

EFFECT: enhanced efficiency of bored pile construction, improved manufacturing quality, enhanced life time and strength of pile.

4 cl, 3 dwg

FIELD: construction industry.

SUBSTANCE: method of installing tubular pile in permanently frozen earth involves rotation of pile and its simultaneous vertical movement under influence of pressing axial load applied to the pile. At that speed of vertical pile movement Vm, value of pressing axial load Pt and angular speed of pile rotation ω are controlled using a nomogram built in logarithmic coordinate system wherein along x-axis there marked are magnitudes of the value (athth) that comprises the ratio of thermal conductivity of thawed earth ath to thickness of thawed earth seam under pile edge δth, and along y-axis there marked are values of speed of vertical pile movement Vm. Nomogram consists of two families of Vm-vs-(athth) curves based on calculations of thermal, mechanical and hydrodynamic processes when installing the pile. The above nomogram provides the possibility of choosing the speed of vertical pile movement Vm, depending on pile size and specific earth properties, when Pt and ω are available, as well as the possibility of choosing pressing axial load Pt and angular speed of pile rotation ω when Vm and ath, δth are available.

EFFECT: improving the accuracy of parametrisation of pile installation mode.

3 cl, 2 dwg

FIELD: construction, methods or apparatus for placing sheet pile bulkheads, piles, mould-pipes, or other moulds by screwing down, namely for electric plant mounting.

SUBSTANCE: device comprises frame, guiding pipe with clamp, reduction gear with gear-wheels and bearings. Guiding pipe, driving gear-wheel and bearings are made as two sectional parts and provided with hinges from the first sides and with locks from the second sides thereof to join up all parts in single rigid structure. All hinges are coaxially arranged.

EFFECT: extended field of screw grounding electrode usage during grounding devices installation, increased structural simplicity, decreased weight and costs, increased reliability and operational safety, possibility of device usage in the case of power source absence or in territories unsuitable or unfavourable for another equipment usage.

3 cl, 3 dwg

FIELD: building, particularly to erect load-bearing foundation, to retain installation on ground surface and to drive underwater and ground-surface tunnels.

SUBSTANCE: screw pile comprises metal pipe with helical winding formed on the metal pipe and with concrete head installed on the pipe. Concrete head has thickness equal to 1/4-5 pipe diameters. Metal rods having length equal to that of concrete head are built in the concrete head. The helical winding extends along the full shaft length and is made as helical blade with width equal to 0.5-5 concrete head diameters. The helical winding has conical part formed in lower pile part and extending for the length equal to not more than 1/3 of pile length. Triangular stiffening ribs are distributed over the full helical blade surface and have bases connected with each other and abutting metal pipe. Apexes of the stiffening ribs are located at blade edge. Apex of each stiffening rib is provided with metal rod. Metal rods of stiffening ribs are connected with each other by metal reinforcement members embedded in blade edge. Additional triangular stiffening ribs are created in the blade. The additional triangular stiffening ribs extend transversely to main stiffening ribs and have bases connected with pipe. Additional stiffening ribs have apexes fastened to apexes of corresponding main stiffening ribs. Connection member adapted to connect the screw pile with building structure is located in upper pipe part. The connection member is made as header provided with thread or ribbed reinforced concrete header. Upper part of the header is fitted with hook fixer. Lower part thereof has bolt to provide keyed pile driving means fixation. Screw pile driving method and means, as well as tunneling method or method for underground passage construction by open-cut method with the use of the screw pile are also disclosed.

EFFECT: increased structural load-bearing ability, simplified structure, accuracy and reliability of screw pile driving, as well as possibility to drive pile in densely built-up areas.

5 cl, 7 dwg

FIELD: building, particularly screw pile forming.

SUBSTANCE: device comprises body, drive with load-bearing unit having outer collar joined with the body through worm gearing and inner collar joined with hollow screw working tool, which is provided with screw extensions made in lower end part. The device also has orifice for releasable valve receiving and to discharge well-filling materials into the well. Bunker is formed from upper end of working tool. Inner collar made in leading unit of the drive is joined with working tool to transmit rotation force to any working tool part through sliding connection. Inner and outer leading unit collars are connected to form the first pair. Inner collar of leading unit and working tool are coupled to form the second pair. The body and the working tool are connected by controlled fixers to constitute the third pair. The controlled fixers specify direction of mutually connected pairs in joint areas along the whole area of possible joint of each member pair. Power equipment of the drive may transmit translational and rotary movement to leading unit of the drive along with screw line pitch and operational direction specified during device operation. Cleaning unit, which removes foreign objects from outer surface of working tool is connected to inner collar of the leading unit.

EFFECT: reduced time of composite working tool reassembling and increased tool capacity.

5 cl, 5 dwg

FIELD: building, particularly for hole drilling in stable sedimentary rocks during building concrete and reinforced concrete piles having high load-bearing capacity and adapted for foundation and anchoring support forming.

SUBSTANCE: device has immovable unit fixed relative ground during drilling operation and installed on vehicle, and movable unit moving over immovable part for hole drilling. Immovable unit has steel tubular body closed with steel caps from both sides thereof. Four guiding channel bars and two threaded bars are arranged inside the tubular body. Movable unit has drilling shaft including threaded drill made as steel tube with two differently sized cutters. The cutters are of dihedral shape and have common rib and orifices formed in the steel tube under the cutters. Area of ground cut by lesser cutter is twice as small as that cut by larger cutter. Auger drill comprises removable cutting part and auger member communicating with collapsible box-shaped sleeve in upper auger member part through outlet orifice. Movable unit has platform fixedly secured to drilling shaft and comprising steel body and steep plates. Installed on the platform are driving mechanism for threaded drill and platform and driving mechanism for auger drill. Both driving mechanisms include electric drive and gear wheels. During hole drilling threaded and auger drills are installed to rotate in mutually perpendicular directions so that auger drill may perform not less than 20 revolutions as threaded drill turns through 360°. Threaded drill rotation is accompanied with longitudinal movement thereof for distance equal to thread pitch c=1.414d, where d is outer diameter of threaded drill tube. During threaded drill rotation through 360° the greater cutter tip describes a circle having diameter D=2.414d and equal to hole diameter.

EFFECT: possibility to drill screw-like hole with coarse thread in one pass or in one working cycle.

4 cl, 23 dwg

FIELD: pile forming machines provided with auger drilling tools.

SUBSTANCE: machine has vertical post, head providing rotary movement, which is movable relative the post, as well as auger drill. Auger drill includes hollow core and at least one screw blade. Machine has extension tube with lower end fixedly secured to upper auger drill end. The head cooperates with extension tube. Machine also includes tubular piston sliding inside hollow core of auger drill and inside extension tube. Upper tubular piston end is connected to concrete supply pipeline. Machine comprises annular lifting means having the first end rigidly secured to upper end of extension tube and the second end rigidly secured to upper end of tubular piston.

EFFECT: increased depth and quality thereof.

6 cl, 5 dwg

FIELD: building, particularly for building load-bearing foundations and securing different mechanisms and devices in ground, including permafrost ones, for driving metal tubular piles, preferably having diameters of 168 - 219 mm.

SUBSTANCE: method involves pressing pile in ground along with simultaneous driving thereof with the use of inner inventory key. Torque is initially applied to screw blade by inventory key and then as pile driving resistance increases pile shaft is also involved in torque transfer process, wherein exceeding of predetermined torque value to inventory key or pile shaft is not allowed. Screw pile comprises cylindrical tubular shaft with guiding cone, screw blade and seat formed in lower shaft part for inner inventory key installation. Shaft is formed of metal and has means for taking torque transferred from above key.

EFFECT: reduced material consumption due to providing two-stage torque transfer scheme, increased reliability of pile driving process and pile as a whole.

7 cl, 8 dwg

The invention relates to the construction of pile foundations for civil and industrial constructions

FIELD: construction.

SUBSTANCE: working member for device of screw bored piles consists of casing pipe, shoe with screw blade and a tip and is sunken in the soil by being screwed by applied torque moment and axial vertical force. Working member differs by the fact that a cone-shaped tip has sharpness angle of 90, inclination angle of screw line of the blade is chosen as per the given formulas for ensuring rational values of force impacts from the submerging mechanism, there is tight demountable joint of casing pipes, shoe has the radius which is more than that of casing pipe, which is chosen from the given equation, owing to which soil pressure is relieved to casing pipe due to recovery of elastic soil deformation after introduction of the shoe. When the working member is submerged, the soil is expanded with a shoe to sides, thus being compacted. When design reference mark is reached, reinforcement cage is installed in casing pipe, and pile is concreted with simultaneous removal of the working member by unscrewing and rotating it in opposite direction; at that, the tip remains in the soil. By means of the above, soil is compacted once again, and cavities left with the shoe are filled with concrete.

EFFECT: considerable decrease of power consumption required for well erection process.

1 cl, 3 dwg

Screw pile // 2379421

FIELD: construction engineering.

SUBSTANCE: hollow screw body is made of one circular-coiled strip with its turns being interconnected in the tips. The strip is bent along bend lines inclined to its edges to form along the external and internal surfaces the one-way curved pocket-shaped spirals and helixes which can differ both in shape and dimensions on the perimetre of the screw pile. And the bend line distance is equal to the total length of perimetres of pocket geometries within the internal and external surfaces.

EFFECT: technological enhancement.

6 dwg

Screw pile // 2379420

FIELD: construction engineering.

SUBSTANCE: hollow screw body is made of one circular-coiled strip with its turns being interconnected in the tips. The strip is bent along bend lines inclined to its edges to form along the external and internal surfaces the one-way multiangular pocket-shaped spirals and helixes. And the bend line distance is equal to the length of each multiangular element, and the pockets of the internal surface can differ from those of the external surface both in shape and dimensions.

EFFECT: technological enhancement.

6 dwg

Screw pile // 2347036

FIELD: construction.

SUBSTANCE: invention concerns construction specifically foundation engineering. Screw hole is made of one strip bended in straight lines set at an angle to the strip edges to form similar parallelograms alternatively located on the strip and oppositely directed. The strip is rolled into cylindrical coils joined together at the edges to form the outer and inner surface of triangular helical lines and helical surfaces.

EFFECT: simplified manufacturing process and enhanced technology.

6 dwg

FIELD: construction.

SUBSTANCE: screw pile includes a hollow shaft and, at least, one hollow screw blade. Form and volume of the blade may be modified, for example, by flattening and subsequent spreading of, at least, a part of the blade.

EFFECT: easier immersion and increased bearing capacity of screw pile.

6 cl, 1 dwg

Screw pile // 2341620

FIELD: construction.

SUBSTANCE: screw pile comprises a shaft with screw shoe being fixed to the front end of the pile in screwing direction. Screw shoe is represented with hub having screw blade and tapered nipple, which is rigidly connected with exhaust openings by means of tubular roller. Exhaust openings are directed perpendicular to roller axis. Tapered nipple is also connected with screw anchor having screw blade with the same coiling and pace as screw blade of shoe hub. Tubular roller is coupled with gas-dynamic pulse source, which may be implemented as air-gas mixture source connected by the system of operating agent supply to tubular roller and start-up element.

EFFECT: decrease of screw pile screwing moment.

2 cl, 2 dwg

FIELD: constructional engineering.

SUBSTANCE: system for bored piles construction concerns mining industry and can be used for buildings, bridges, trestle works, overpasses and other specific structures. The system consists of drill column, which, in its turn, comprises hollow stems and blade stem bit containing casing, blades and tapered tip with pilot-operated cutter. At lower end face of the bit casing in blade clearances there are opposite grooves arranged to house protruding element of tapered tip provided at its upper end face and taking torque and axial thrust on bit casing. Elements of tapered tip fixation assembly are rigidly mounted on the lateral surface of bit casing to interwork with the bit casing in on-position. The said elements of tapered tip fixation assembly are shaped as holed bar for clamps. The upper end face of tapered tip contains collars attached to the bit casing by means of wire ropes.

EFFECT: wider range of application of bored piles construction method; improved productivity and performance; reduced cost of piles production.

3 cl, 3 dwg

FIELD: mining.

SUBSTANCE: bored auger pile installation device comprises a case with upper part made in a form of hollow faceted pin with a hole for a ball plug, and a rock-breaking tool with a skirt. Middle and bottom parts of the case are made in a form of solid cylinders with variable cross-section, where diameter of middle part is more than diameter of bottom part. Middle cylindrical part features an orifice system, a cavity for concrete injection and transverse slot, where a rotating splitter knife is installed on a vertical axis in the vertical case hole. The knife is switched into working position by a moving spring pusher with variable cross-section, located in a horizontal cavity formed by two orifices of different diameter, stopped by a plug from the outer side. Lower cylindrical part of the case has a through lengthwise slot with a stop.

EFFECT: higher capacity of bored auger pile installation in highly and medium stable grounds, and lower cost of drilling work.

5 cl, 4 dwg

FIELD: construction, particularly to erect industrial and civil buildings and to reconstruct existent foundation, as well as to construct supports taking alternating loads in grounds of any type.

SUBSTANCE: method involves creating pilot pile in well by well drilling along with cut ground carrying to ground surface with the use of auger drilling assembly provided with rock-cutting tool to be removed from well and device with extendible rock-compacting member, which creates annular cavities in pilot well wall in load-bearing ground layers in accordance with geological section; connecting said sections with each other through vertical cavities arranged in planes transversal to pile axis, wherein the vertical cavities are arranged in staggered order in planes parallel to pile axis.

EFFECT: increased load-bearing ability of the pile in any ground surroundings and in confined space.

3 cl, 3 dwg

FIELD: industrial and civil construction, particularly to erect new buildings, to reinforce foundations of existent buildings and building structures and to construct supports taking alternating loads.

SUBSTANCE: method involves forming pilot hole in ground by hole drilling along with delivering cut ground to ground surface by means of hollow auger drilling assembly provided with rock-cutting tool; removing hollow auger drilling assembly with rock-cutting tool from hole; arranging metal frame in hole and filling holes with concrete. Helical groove is created in pilot hole wall so that helix lead may be changed. Concrete mix is supplied through inner channel of auger drilling assembly to fill cavity formed in pilot hole and helical slot as drilling assembly moves upwards. Metal frame is arranged in hole after total drilling assembly removal from hole and hole filling with concrete mix.

EFFECT: increased load-bearing capacity of bored pile and extended field of application due to possibility of said method usage for foundation construction in any ground.

5 cl, 3 dwg

FIELD: building, particularly for building load-bearing foundations and securing different mechanisms and devices in ground, including permafrost ones, for driving metal tubular piles, preferably having diameters of 168 - 219 mm.

SUBSTANCE: method involves pressing pile in ground along with simultaneous driving thereof with the use of inner inventory key. Torque is initially applied to screw blade by inventory key and then as pile driving resistance increases pile shaft is also involved in torque transfer process, wherein exceeding of predetermined torque value to inventory key or pile shaft is not allowed. Screw pile comprises cylindrical tubular shaft with guiding cone, screw blade and seat formed in lower shaft part for inner inventory key installation. Shaft is formed of metal and has means for taking torque transferred from above key.

EFFECT: reduced material consumption due to providing two-stage torque transfer scheme, increased reliability of pile driving process and pile as a whole.

7 cl, 8 dwg