Method for hydraulic filling of long single mine workings

FIELD: mining.

SUBSTANCE: invention refers to mining industry, and namely to the method used for hydraulic filling of long single mine workings. It involves influence of retaining and filtering connection straps, installation of pulp pipeline, and supply of filling pulp. Water is drained via drain holes made in connection straps installed on the side opposite to the pulp supply. Filling pulp is supplied to the filled area via pulp pipeline with the holes made in lower part, which is attached to the roof of mine working throughout its length. The holes made at the beginning of the pipeline are equipped with petal valves.

EFFECT: increases the filling degree of the worked-out area in hard-to-reach sections.

2 cl, 2 dwg

 

The invention relates to mining and can be used for bookmarks longest single workings, mostly inaccessible.

The known method hydraulic bookmarks cameras, in which the flow of filling material is produced through wells drilled in the roof framing, serves stowing mixture through wells alternately at several points by successive opening of the wells at the point of submission after the construction of the array to the maximum height in the previous feed point (A.S. USSR 1788299, MKI: E21F 15/08, publ. 15.01.1993, bull. No. 2).

However, this method is applicable in the conditions of the exhaust chambers, without lining, in addition, it is quite time-consuming.

Closest to the present invention is a method of filling out space hardening tab, which in the roof cleaning elaborate form of transport of filling the gap, to which is attached the trunk of filling the pipeline (As of the USSR №376584, MKI: E21F 15/08, publ. 05.04.1973, BI No. 17).

This method cannot be applied when the tab with a high degree of filling shall be inaccessible space and excavation has a mount, which for technical reasons cannot be broken.

The technical result of the invention is to increase the completeness of the filling designed the aqueous space on hard to reach areas.

This technical result is achieved in that in the method of hydraulic bookmarks longest single workings, including the construction of retaining and filtering jumpers, installation of the pipeline, the flow of filling of the pulp, in which the underlying space is performed via slurry pipeline with holes in its bottom part attached to the roof framing on its entire length, and draining the water passes through the drain holes in the jumper installed on the side opposite the supply of pulp. Holes in the initial part of the pipeline provided with flap valves, and in the development of a number of filtering thresholds.

The method is illustrated in the drawings, in which figure 1 shows a flow chart of bookmarks production, as in figure 2 - scheme of the flap valve.

On the drawings: 1 - roof laying generation; 2 - slurry pipeline; 3 - holes in the pipeline; 4 - restraint jumper; 5 - filter jumper; 6 - outlet; 7 - filling the array; 8 - petal valve; 9 - filter thresholds; 10 - filtration material.

The method is implemented as follows.

To the roof laying generation 1 attach the pipeline 2 with holes 3 pointing downwards (figure 1). At the end of the production set jumpers holding 4. In the jumper installed from the sides of the, the opposite connected with pulp, mount the drain hole. The slurry in the slurry pipeline serves groundwater pump from the mixer. By feeding the pulp it through a few holes 3 follows from the pipeline 2. Solid particles of the slurry are deposited, forming filling the array 7, and the water flows to the filter jumper 5 on the output. As reclamation fill array 7 which overlaps the hole 3 and the slurry begins to flow from the following holes. So is the generation tab along its entire length. The size of the holes is prescribed such that the slurry pipeline retained sufficient strength to resist loads from the pressure of the pulp.

During transportation of the pulp through the holes closed filling the array can occur infiltration of water in the backfill array, which increases the concentration of solids in the pulp and resistance to its movement in the pipeline. In case of considerable length may be a blockage of the pipeline.

In order to reduce infiltration in the initial part of the pipeline into the holes install the flap valve 8, which do not prevent the release of pulp, but when reaching the backfill array 7 3 holes close it. This significantly reduces the infiltration of water in the backfill array, thereby avoiding the clogging of the pulp line 2 (figure 2).

If backfill material contains m is lkie particles (less than 0.05 mm), these particles can be carried out with water and accumulate in the filter jumpers 5, forming an array with negligible permeability. Because of the small coefficient filtering timely yield becomes impossible and the process of bookmarks is broken. This disadvantage is eliminated by setting put in the development of a number of filtering thresholds 9, in which at least bookmark develop accumulate fine particles, the water is clarified and is timely return of pure water, i.e. small particles of delay in laying the installation space in laying the development of a number of filtering thresholds.

The use of the proposed method hydraulic bookmarks longest single openings can improve the completeness of the filling out space on hard to reach areas and to ensure its continuous bookmark with little additional work.

1. Way hydraulic bookmarks longest single workings, including the construction of retaining and filtering jumpers, installation of the pipeline, the supply of backfill slurry and draining of the water through the drain holes in the jumper installed on the side opposite the inlet pulp, characterized in that the supply of backfill slurry in the underlying space is performed via slurry pipeline with oversteamed bottom attached to the roof framing on its entire length, with holes in the initial part of the pipeline provided with flap valves.

2. The method according to claim 1, characterized in that the formulation has a number of filtering thresholds.



 

Same patents:

FIELD: mining.

SUBSTANCE: invention refers to mining industry and can be implemented at underground development of steep pitched deposits represented with unstable ore, under thickness of water-flooded sediments, excavation of which is connected with hazard of underground water inrush into mine workings. The procedure of development of thick steep pitched ore bodies consists in division of ore body into layers mined in descending order, in mining layers with cuts and in filling mined space with a solidifying material. Sections of location of cavities above filled massif and sizes of these cavities are determined by visual or instrument survey from cuts mined adjoined to the filled massif. Solidifying materials are supplied to places of after-filling in adjoined cuts using, for example a concrete pump equipped with the system of control over filling mixture supply. Cavities are after-filled in a divergent order in the direction off their boundaries, from uttermost adjoined cuts to adjoined cuts.

EFFECT: increased completeness of filling mined space, decreased space of mining auxiliary entries and increased safety of mining at development of deposits.

4 dwg

FIELD: mining and underground building, particularly underground mining.

SUBSTANCE: method involves double-stage mineral deposit development; erecting artificial rock-and-concrete supports of previously cut primary chamber roof rock in at least two adjacent primary chambers; extracting secondary chamber resources; filling space defined by cut rock with hardening material mix. Mines for drilling and/or filling operations performing are arranged in deposit roof over or inside ore pillars of secondary chambers. Primary chamber roof rock is cut by well undercharge method. Hardening material mix is supplied via cross headings located between mine and cavities and/or via undercharged well sections remained after rock cutting operation.

EFFECT: increased safety and economical efficiency due to reduced number of drilling and filling mines or accompanying mineral excavation, possibility to use drilling and filling mines at secondary chamber development stage for ore cutting, venting and roof condition control.

5 cl, 3 dwg

FIELD: mining industry.

SUBSTANCE: device has surface composed of upper section with wedges and lower section and backfill material placed on said surface. Upper section is made in form of a rectangle, composed of rectangular triangle and rectangular trapezoid with possible displacement of trapezoid along triangle hypotenuse. Lower section is made of two plates, mounted on holder, fixed to pipe for feeding compressed air. Plate, positioned above the trapezoid, is mounted with possible counter-clockwise rotation around holder. Value of greater base of trapezoid hδ is selected from relation hδ = m - 0.9k, where m - bed massiveness, m, k - size of backfill material, m.

EFFECT: simplified construction, lower laboriousness.

2 dwg

FIELD: mining industry.

SUBSTANCE: method includes preparation and well extraction of resources of chambers with partial backfill of extraction space. Blocks of upper level relatively to blocks of lower level are placed in staggered order, while blocks are made in form of a stretched upwards hexahedron. Resources of block within one hexahedron are separated on two chambers, one of which, placed along periphery of hexahedron, after extraction and removal of ore from it is filled by hardening backfill. Second order chamber is made of hexahedron-like shape, extracted and removed under protection from artificial block on all six sides of this chamber. Removal of ore from first order chambers is performed through one removal mine - end of level ort and cross-cut in lower portion of block and intermediate sub-level cross-cuts.

EFFECT: higher efficiency.

2 dwg

FIELD: mining industry.

SUBSTANCE: method includes erection of rows of main platforms along bed length in staggered order with length equal or divisible by step value for support displacement, and placing filling material thereon. Along length of main platforms between ceiling and bed soil post support is mounted, upon which filling material is fed. After that between main platforms additional platforms are erected with wedge supporting, and main platforms are rotated counter-clockwise towards pneumatic support and it is displaced for one drive step. During that filling material, while lowering, unwedges wedge support between ceiling and bed soil and forms artificial supports. After that additional platforms are rotated counter-clockwise towards pneumatic support. After movement of cleaning face for two drive steps operations for constructing artificial supports are repeated. Distance between main platforms along bed fall line are selected from mathematical expression.

EFFECT: higher efficiency.

2 dwg

The invention relates to the mining industry and can be used in underground mining with a mined-out space
The invention relates to the mining industry and can be used in underground mining with a mined-out space

The invention relates to mining and can be used in the development of mineral resources with tab

The invention relates to mining and can be used in the development of mineral deposits with a bookmark cameras, preferably aldobrandi profile

The invention relates to mining and can be used when laying small amounts, for example, under the protected objects

FIELD: mining industry.

SUBSTANCE: method includes erection of rows of main platforms along bed length in staggered order with length equal or divisible by step value for support displacement, and placing filling material thereon. Along length of main platforms between ceiling and bed soil post support is mounted, upon which filling material is fed. After that between main platforms additional platforms are erected with wedge supporting, and main platforms are rotated counter-clockwise towards pneumatic support and it is displaced for one drive step. During that filling material, while lowering, unwedges wedge support between ceiling and bed soil and forms artificial supports. After that additional platforms are rotated counter-clockwise towards pneumatic support. After movement of cleaning face for two drive steps operations for constructing artificial supports are repeated. Distance between main platforms along bed fall line are selected from mathematical expression.

EFFECT: higher efficiency.

2 dwg

FIELD: mining industry.

SUBSTANCE: method includes preparation and well extraction of resources of chambers with partial backfill of extraction space. Blocks of upper level relatively to blocks of lower level are placed in staggered order, while blocks are made in form of a stretched upwards hexahedron. Resources of block within one hexahedron are separated on two chambers, one of which, placed along periphery of hexahedron, after extraction and removal of ore from it is filled by hardening backfill. Second order chamber is made of hexahedron-like shape, extracted and removed under protection from artificial block on all six sides of this chamber. Removal of ore from first order chambers is performed through one removal mine - end of level ort and cross-cut in lower portion of block and intermediate sub-level cross-cuts.

EFFECT: higher efficiency.

2 dwg

FIELD: mining industry.

SUBSTANCE: device has surface composed of upper section with wedges and lower section and backfill material placed on said surface. Upper section is made in form of a rectangle, composed of rectangular triangle and rectangular trapezoid with possible displacement of trapezoid along triangle hypotenuse. Lower section is made of two plates, mounted on holder, fixed to pipe for feeding compressed air. Plate, positioned above the trapezoid, is mounted with possible counter-clockwise rotation around holder. Value of greater base of trapezoid hδ is selected from relation hδ = m - 0.9k, where m - bed massiveness, m, k - size of backfill material, m.

EFFECT: simplified construction, lower laboriousness.

2 dwg

FIELD: mining and underground building, particularly underground mining.

SUBSTANCE: method involves double-stage mineral deposit development; erecting artificial rock-and-concrete supports of previously cut primary chamber roof rock in at least two adjacent primary chambers; extracting secondary chamber resources; filling space defined by cut rock with hardening material mix. Mines for drilling and/or filling operations performing are arranged in deposit roof over or inside ore pillars of secondary chambers. Primary chamber roof rock is cut by well undercharge method. Hardening material mix is supplied via cross headings located between mine and cavities and/or via undercharged well sections remained after rock cutting operation.

EFFECT: increased safety and economical efficiency due to reduced number of drilling and filling mines or accompanying mineral excavation, possibility to use drilling and filling mines at secondary chamber development stage for ore cutting, venting and roof condition control.

5 cl, 3 dwg

FIELD: mining.

SUBSTANCE: invention refers to mining industry and can be implemented at underground development of steep pitched deposits represented with unstable ore, under thickness of water-flooded sediments, excavation of which is connected with hazard of underground water inrush into mine workings. The procedure of development of thick steep pitched ore bodies consists in division of ore body into layers mined in descending order, in mining layers with cuts and in filling mined space with a solidifying material. Sections of location of cavities above filled massif and sizes of these cavities are determined by visual or instrument survey from cuts mined adjoined to the filled massif. Solidifying materials are supplied to places of after-filling in adjoined cuts using, for example a concrete pump equipped with the system of control over filling mixture supply. Cavities are after-filled in a divergent order in the direction off their boundaries, from uttermost adjoined cuts to adjoined cuts.

EFFECT: increased completeness of filling mined space, decreased space of mining auxiliary entries and increased safety of mining at development of deposits.

4 dwg

FIELD: mining.

SUBSTANCE: invention refers to mining industry, and namely to the method used for hydraulic filling of long single mine workings. It involves influence of retaining and filtering connection straps, installation of pulp pipeline, and supply of filling pulp. Water is drained via drain holes made in connection straps installed on the side opposite to the pulp supply. Filling pulp is supplied to the filled area via pulp pipeline with the holes made in lower part, which is attached to the roof of mine working throughout its length. The holes made at the beginning of the pipeline are equipped with petal valves.

EFFECT: increases the filling degree of the worked-out area in hard-to-reach sections.

2 cl, 2 dwg

Goaf stowing method // 2393355

FIELD: mining.

SUBSTANCE: method of goaf stowing during underground development of steeply dipping thick ore bodies involves bottom-upward excavation of inclined ore streaks 5 in horizontal layers up to 8 m wide with the inclination angle equal to angle of dip of ore body starting from the hanging side towards the lying side, ore breaking to the mine goaf of the bed, loading of the broken ore from the mine goaf, installation of insulating bulkheads on the bed flanks and filling of the mine goaf with hydraulic stowing mixture 2. Before the mine goaf is filled with hydraulic stowing mixture 2, there built near exposed surface of the adjacent inclined ore streak 6 is concrete retaining wall 1 with the thickness taken depending on the bed width and the specified strength of wall 1. After the rest part of the mine goaf is filled with hydraulic stowing mixture 2 and water is filtered, injection of hardening - cement-and-sand solution is performed to its upper part to the depth of 100…300 mm for movement of self-propelled machines along the filling surface 4.

EFFECT: invention will allow decreasing the flow rate of hardening stowing mixture owing to the construction of concrete retaining wall and reducing the prime cost of the mine production.

2 dwg

FIELD: mining.

SUBSTANCE: shaft pneumatic bridging comprises pneumatic shell, suspension unit, protective jacket, manometric and air-supply hoses, device for filling, control of excessive air pressure and its ejection, mount cord. At the same time pneumatic shell is arranged in the form of soft axisymmetric toroidal shell of rectangular section, inside of which there is sleeve arranged, and along its axis there is pipe mounted in with diametre that is less compared to sleeve. Besides pneumatic shell is separated into two equal parts by means of perforated web, upper end and its side surfaces are coated by loose-fitting meshy web with lap towards working zone of rise heading, upper end is made of synthetic high-module fibre of high strength.

EFFECT: improved operational reliability of shaft pneumatic bridging.

4 dwg

FIELD: mining.

SUBSTANCE: method includes supplying pulp under excessive pressure via a safety device. The safety device is arranged as a tee, one end of which is connected to a bottomhole pulp line, the second one - to a sealer, and a safety membrane is installed on the third one. At the same time the output of wells in the backfilled chamber is arranged near its roof.

EFFECT: higher extent of chambers filling with a backfilling material with reduction of labour costs.

2 cl, 7 dwg

FIELD: mining.

SUBSTANCE: flushing pulp is delivered in stages forming several layers between which drain pipes are installed using leakproof hose parallel to longitudinal axis of flushed space. Drain pipes are attached by one end to leakproof hose. Each drain pipe is extended till it reaches opposite dam, then the housing is detached from drain pipe through the opening in filter dam and is removed for further use. When installation of project quantity of drain pipes is completed, process of flushing pulp delivery is resumed.

EFFECT: improving efficiency of flushing works due to reduction of flushing pulp runoff period.