Layer development method of deep diamond leads with diamond ore cavities available in mine take circuits

FIELD: mining.

SUBSTANCE: invention refers to mining engineering, and to underground ore deposit mining technology. Layer development method of deep diamond leads with diamond ore cavities available in mine take circuits includes mechanical development of upper layer with chambers with the following development of support solid blocks, and by erecting a flexible covering, and development with modular break system of lower layer which includes diamond ore cavities. Flexible covering is mounted only above diamond ore cavities. First, there mounted is a flexible covering on the soil of chambers being developed together with their development, then - on the soil of support solid blocks being developed together with their development, and after that flexible coverings of adjacent chambers and support solid blocks are connected to each other.

EFFECT: improving development efficiency owing to minimum losses and elimination of ore dilution when being discharged under flexible covering, and reducing volume of work owing to ore mining work combined with erection of flexible covering when developing chambers and support solid blocks.

6 dwg

 

The technical solution relates to mining, namely the technology of underground mining of ore deposits, and can be used in the development of the buried alluvial diamond ore.

Known systems extraction sublevel caving with mechanical release (see Agoshkov M.I. and other lessons learned and assess the prospects for widespread use of variants of development systems with frontal ore / Mining magazine. - 1983. No. 6. - P.34-38).

The main disadvantage of these systems in the development of ore deposits are significant losses and a large percentage (20%) dilution of ore.

Known systems development placer diamond ore, including a pole, chamber and combined (see KLISHIN VI and other Testing of buried placers mechanized / proceedings of the IV scientific and practical conference "high technologies of extraction and processing of minerals". - Novosibirsk: IGD so ran, RAS-2005 - S).

The disadvantage of these systems is the inability of the mining placers harvester at full capacity, because the deposits are very large fluctuations in power that exceeds the capacity of harvesters, resulting in losses of diamond ore and ore.

Closest to the technical essence and essential features is used which may in the coal industry development system of thick coal seams with the use of the flexible beams (see Dmitriev SR and other basic technology development of coal with flexible floors / M.: Nedra, 1967. - 74÷80, 124÷128).

The disadvantages of this technology should include significant costs for installation of flexible beams that are necessary testing of the upper layer by love for mounting flexible beams.

In addition, used in coal mines development system with the installation of flexible overlay in the upper layer and depletion in the bottom layer of drilling and blasting method and production of coal has a significant disadvantage in a significant dilution of the coal at issue, because the proportion of species 2 times higher than the specific gravity of the coal, and when the gusts of flexible overlapping breed ahead of coal, which remains in the dam, so the use of this system development is inefficient.

The technical objective of the proposed solutions is to increase the efficiency when developing the buried diamond placers by ensuring minimum losses and practical exceptions dilution of ore at issue under the flexible overlay, as well as by reducing the amount of work by combining operations ore production and installation of flexible overlay in the development of cameras and supporting pillars.

The task is solved in that in the method layer testing of buried diamond placers with h is the difference in the contours of the mine fields in cavities with diamond ore including mechanized mining of the upper layer of the cameras with the subsequent development of the supporting pillars and installation of flexible overlapping and testing system block caving of the lower layer including the trench with diamond ore, according to the technical solution flexible ceiling mount only above cavities with diamond ore, and first mount the flexible overlay on the ground working cameras simultaneously with their training, and then on the ground working on supporting pillars simultaneously with their development, after which flexible overlapping adjacent chambers and the supporting pillars are connected.

Flexible ceiling mounted simultaneously with the development of cameras and supporting pillars, which significantly increases the efficiency of the proposed method layer testing of buried diamond placers with depression.

Mounted so flexible overlapping parts collapsed rocks from diamond ore, so that failover depressions with diamond ore sublevel caving with mechanical release under the protection of the flexible overlay provides the minimum loss, virtually eliminates dilution.

The method of layer-testing of buried diamond placers in the contours of the mine fields in cavities with diamond ore is illustrated in the example it is realizatsii and drawings (Fig.1-6), where:

figure 1 shows a plan of Stripping and development of the upper layer;

figure 2 - cross section a-a in figure 1;

figure 3 - cross section B-B in figure 1 (installation of flexible overlapping);

4 is a plan testing of the lower layer under the flexible overlay;

5 is a cross-section e-E in figure 4 (a view transverse to the extension of the basin);

6 is a cross section d-D in figure 4 (development of the lower layer), turned.

Way layer testing of buried diamond placers in the contours of the mine fields in cavities with diamond ore implemented as follows.

The top layer is opened by tunnels 1 (1), passed from the quarry. Between a tunnel 1 connect the output 2, and on the contour layer 3 longitudinal and transverse 4 workings of the upper layer - slope 5 (figure 2).

The whole field of the upper layer is cut longitudinal drifts 6 (1) on three panels. In turn, each panel is cut as working off the top layer vnutrepenialnymi drifts 7 and 8 on the excavation unit size 100×200 m Excavation units work by using roadheaders and loading delivery trucks. In each excavation unit work first camera 9, forming the supporting pillars 10 width of 5 m and a length of 100 m, which work after a failover cameras. The width of the chambers 9 is 5 meters

The installation of flexible overlapping produce only over the depression with ALM is postergada ore, the contours In which (1) define the exploration and first mount the flexible overlay on the soil of the working chambers 9, simultaneously with its development, then on the ground working on supporting pillars 10, simultaneously with its development. On the sides of the chambers 9 leave margin flexible overlay for connection with a flexible overlapping of the adjacent supporting pillar 10. Flexible overlapping cameras 9 and the adjacent flexible overlapping the supporting pillars 10 are connected with the rope 11 (figure 3), thus forming a flexible overlay 12 at the upper soil layer above the cavity with diamond ore. The refinement of the lower layer of the buried placers, including depression with diamond ore, produce systems with collapse under the protection of the flexible overlay 12.

For dissection of the lower layer is produced (figure 4), the driving of the generation 2 connecting adits 1, two longitudinal openings 13 to the intersection with the ore body. Then perpendicular to this observation wells 13 are transverse rassechku 14 (figure 4) and longitudinal framing 15 (figure 5). Resulting excavation blocks of the lower layer is cut by the cameras 16 (figure 4), leaving between them the supporting pillar 17, which work system block caving under the protection of the flexible overlay 12 (6).

Way layer testing of buried diamond placers calicium in the contours of the mine fields in cavities with diamond ore including mechanized mining of the upper layer of the cameras with the subsequent development of the supporting pillars and installation of flexible overlapping and testing system block caving of the lower layer including the trench with diamond ore, characterized in that the flexible ceiling mount only above cavities with diamond ore, and first mount the flexible overlay on the ground working cameras simultaneously with their training, and then on the ground working on supporting pillars simultaneously with their development, after which flexible overlapping adjacent chambers and the supporting pillars are connected.



 

Same patents:

FIELD: mining industry.

SUBSTANCE: present invention relates to mining and may be used for mining steep seams using the hydraulic method, with mined-out space filling. A controllable shield roof for mining steep seams with mined-out space filling includes hoists, jacks, a receiving device, cables, on which pipe pieces with lugs for the attachment of metallic plates are installed; a water-protection element, and "aprons". The shield roof cables are located in the centre, as well as at the roof and floor of the seam, and strengthened by jacks. Metallic plates are pivotally connected to the cables, a water-protection element and "aprons" being attached above the plates at the seam roof and floor sides.

EFFECT: efficient working of steep seams, decreased water-protection element mounting and dismantling work, reliable insulation of mined-out space.

6 dwg

FIELD: mining industry.

SUBSTANCE: method is based on positioning of current-conductive reflecting elements on surface of flexible separating ceiling and determining of position of flexible separating ceiling on basis of position of current-conductive reflecting elements by pulse radio-location from mine above cleaning pit. Current-conductive reflective elements are made in form of set of elements, forming a solid reflecting surface or system of reflecting elements, being a complex target. It is possible to use, as current conductive reflective element, metallic shavings, and also portions of metallic pipes or stripes or angles, welded cross-like. It is possible to use solid metallic mesh or its portions. Metallic set can be coated.

EFFECT: higher precision.

7 cl-

The invention relates to mining and can be used to provide maintenance-free maintenance of the reservoir openings in the practical application of the model of training schemes mine fields due to the rational management of stresses and strains in the host developing rocks

The invention relates to the field of mining and can be used to control the roof during the mining of steep seams

The invention relates to the mining industry and can be used when developing a powerful steep coal seams

The invention relates to mining and can be used when developing a powerful steep seams in the shield system

The invention relates to the fastening of the roof in the Stopes using roll torque and can be used in the development of coal seams with an unstable roof

The invention relates to mining and can be used in underground development of powerful horizontal flat and sloping ore and non-ore deposits, in particular, to protect and maintain mezhdurebernyh pillars

Panel lining // 2085745

Panel lining // 2079666
The invention relates to mining, namely the creation of mobile roof supports, and may find application in the development of powerful steep coal seams

FIELD: mining.

SUBSTANCE: invention refers to mining engineering, and can be used when developing flat beds - with selective mining of mineral resource. Method includes excavating mineral resource by entry ways close to a working space. Roof is controlled by building a goaf pack 5 in the working space. Then, on goaf pack 5 there installed are pneumocylinders 6, and compressed air is supplied thereto. Excavation is performed from drifts by two entry ways I, II simultaneously directed towards each other. When mine faces 3 and 4 come to each other by the value equal to double value 2 lf of the winning machine frame, one of the mine faces is directed to mineral resource mass by the value of entry way le. When that entry way intersects the other one, the latter is directed to mineral resource mass by the value of entry way le. After winning machines reach the drifts, excavation is repeated by two simultaneous entry ways directed towards each other.

EFFECT: increasing load on the mining face.

5 dwg

FIELD: mining.

SUBSTANCE: method refers to mining at development of bedded deposits with long pillars along strike by upward mining with destruction of rocks of immediate roof. Method of development of bedded deposits consists in opening a mine field to a lower horizon with main, auxiliary and ventilation inclined bores, in preparing by means of running floor entries to boundaries of the mine field and in developing floors with upward mining. While preparing a lower floor rock produced at drive working is stowed in under-entry packs. After upper floors have been developed rock of drive workings is stowed in extracted entries of developed underlying floor and in opening inclined entries - in the main, auxiliary and ventilation bores, thereof simultaneously with development of stock there is performed a complete liquidation of developed space.

EFFECT: ensures operation of ecologically clean enterprises and increases efficiency of mineral extraction process.

2 dwg

FIELD: mining.

SUBSTANCE: method of prevention of development entries in coal bed areas at development of coal beds by means of mechanised complexes consists in performing development entries 1, arranging outpost columns of mineral, then loosening of mineral bed in wall of working. Loosening is performed by means of drilling bores 2, 3 simultaneously with driving of development entries. The depth of mineral bed loosening from the side of driven area from the entry and from the side of massif is assumed as exceeding the depth of spread of intensive destruction of mineral bed in the edge zone. Bores 2, 3 are arranged in a staggered order along the thickness of a developed bed and have diameters equal to ½ of developed bed thickness. Soft cases are installed into bores 2, 3; then compressed air is supplied into soft cases till their strutting off in walls of bores 2, 3. When the column is reversed driven, soft cases are extracted before the line of a mining face 5 into conveyer 1 and ventilation 6 entries. Behind face support 7 of the mining face 5 "П"-shaped supports 9 are laid on the floor of the bed where a long face interfaces with conveyer entry 1; pneumatic tanks 8 are assembled in the supports; and a compressed air is supplied into tanks strutting off supports 9 and pneumatic tanks 8 between the top and floor of the bed. After descent of rock under the influence of the rock pressure and after walls of "П"-shaped supports 9 have contacted with floor, pneumatic tanks 8 are decompressed and taken out into conveyer entry 1.

EFFECT: invention facilitates increased efficiency of protection of development entries and also decreases costs for development entries maintenance at their reuse.

4 dwg

FIELD: mining.

SUBSTANCE: complex method of hydro excavation of minerals consists of development mining, of equipping with ventilation system and system of heating of mine working, of hydraulic breaking up of bed with an automated mining combine in a continuous mode of operation with installation of face supports, of hydraulic transporting of broken rock, of concentration of obtained mass and its further dehydration, of drying of water encroached beds, and of purifying of process liquid with its recirculation. Hydraulic breaking up of a bed is carried out simultaneously with its impulse mechanical destruction by means of introducing an abrasive material of upgraded hardness into a liquid jet; further abrasive material is separated from broken rock at the time of its hydraulic transporting and concentrating; concentration of broken rock and partial separation of liquid pulp with abrasive material from broken rock are performed by means of transporting and mixing them at the roller type facility; flowing down pulp with abrasive material is driven to purification by means of a pumping system wherein solid particles of abrasive material are separated from the rest of the pulp and where abrasive material is saturated with solid particles of broken rock of specified dimension. Saturated abrasive material is directed to recirculation, while partially purified process liquid is mixed with the liquid obtained at drying of water saturated beds; then process liquid is finally purified by cold evaporation and is brought to recirculation. A portion of purified process liquid is supplied to the ventilation system of mine working and is dispersed in air in form of fine dispersed particles; continuous control measurements of air temperature, of explosion hazardous particles and coal dust contents in air are carried out during mine working operations.

EFFECT: upgraded versatility, efficiency, automaton, quality and reliability of process behavior in constraint conditions of mine working, improvement of ecological situation at mine.

4 dwg

FIELD: mining.

SUBSTANCE: invention concerns mining and can be used at stratum development of minerals with swelled ground rock for guarding of district development drifts. Guarding method includes implementation of district development drifts 1, fixing of district development drifts, stratum weakening of minerals be making grooves 2,3. Powers of swelling layers of minerals stratum are defined. Stratum weakening is implemented by creating of vertical rooves 2,3 in sole, in the immediate vicinity of wall of working, from side of gradient and pitch of seam, at that groove length from side of gradient 2 is accepted as equal to maximal power of swelling stratum, but not more then 2000 mm, and groove length from the side of seam pitch 3 is equal to minimal power of swelling stratum.

EFFECT: decreasing of swelling of soil rocks, decreasing of costs for supporting district development drafts, increasing of spatial work concentration, providing of easier method of groove implementation.

1 dwg

FIELD: mining.

SUBSTANCE: invention concerns mining and can be applied in protection of surface and/or underground objects against undermining. The method involves defining the border 4 of the protected zone (PZ) 5 of object 2 in the form of geometrical position of the points located at distance equal to the width b of safety berm from outline 3 of object 2 and at distance of ri and rj along the given radius-vectors and from the central point O fixed within the border 4. The radius-vectors cross vertical axis (VA) passing through the given central point O. Then a side surface (SS) of the protected zone (PZ) 8 is formed by generating lines (GL) 9 oriented along the mentioned radius-vectors and and drawn from the border 4 under the displacement angles of alluvium (AS) 10 and parent rock (PRS) 13 solids, defined for each direction of and . Further from a crossing line of the SS with roof (RS) 13 and ground (GS) 15 surfaces of a mineral deposit (MD) 6 borders 16 and 17 of the protection pillar (PP) are defined against the mentioned RS and GS in the form of a geometrical position of the points located at distances and along and directions from the VA to the border 16 and at distances and to the border 17, while the values of these distances are defined by the functional dependencies with account to displacement angles of AS and PRS, dip angles MD RS and GS and the ground surface of AS, distances ri and rj from the VA to the border 4 at the respective directions, depth of MD RS and GS occurrence, alluvium thickness under the PZ and VA plane, height marks difference at the PZ base (or day surface) in the central point O on the VA and on points i and j where respective radius-vectors and cross border 3. Functional dependencies are defined according to the geometrical constructions and have the one form for PP area 1 at the downslope of the MD 6 strike line (SL) 7 crossing VA, and another form for the upslope area of SL 7.

EFFECT: ensuring sufficient safety of an object protected against undermining in any direction.

4 dwg, 2 ex, 1 tbl

FIELD: mining.

SUBSTANCE: invention relates to geotechnology and can be used in subterranean leaching the metals and ores, particularly to preparing ore bodies in deposit for leaching. The method includes the explosive loosening the ore deposits and supplying the process liquor. Explosion of the blast hole rings (11) is performed to shake the central solid of the ore body, and in the upper ore body, the peripheral perforations with branching cracks (10) are formed by pin-point explosion, to inject solutions.

EFFECT: invention provides even pattern sprinkling of the solid, even distribution of the leaching solution in its size at the minimal volume of preparatory first workings without ore shrinkage.

1 dwg

FIELD: mining engineering.

SUBSTANCE: debugging area of slope mine is divided into blocks of mineral resources. Blocks are prepared to debugging carrying out development workings 4-7. Blocks debugging are made consequently with long faces, equipped with scouring mechanised systems 2, without leaving between blocks mineral resources pillars. After termination of scouring works in long faces mechanised systems 2 are dismantled. At closing stage of block debugging after face finding 1 in one line with selvage a-b of mineral resources massive, appeared while block debugging which has the common boundary o-k with debugging block, scouring works are continued till upper roof rock fall in developed face bay and till face rock refuse 1 on its middle bay from fraction openings 3, appeared in upper roof while rock falling, on the distance b, equal to the width of face area.

EFFECT: costs decreasing connected with accomplishing of assembling-dismantling works, as well as a time cutting of their accomplishing and safety improving.

3 dwg

FIELD: mining engineering.

SUBSTANCE: method includes carrying out of face entry 11,13, main 1-4 and divisional 5-10 development workings, delineating of mineral resources blocks, assembling of scouring mechanised systems in face entries 11, consistent pairwise mineral resources blocks debugging with long faces N.1, N.2 and dismantling of scouring mechanised systems in dismantling chambers 12. Face entry of the second long face 13 deepen in line of dismantling chamber 12 of the first long face at first stage. At the beginning, by the moment of broken working termination in first long face deepens the area of the second long face, and located from side of mineral resources virgin ground. After termination of broken working in the first long face, face entry of the second long face is deepen till the mined-out space, appeared while debugging of the first long face. At that length of face entry unit of the second long face, debugged after broken working termination in the first long face, is taken more than boost band width, appearing in front of the first long face bank.

EFFECT: costs decreasing connected with accomplishing of assembling-dismantling works, as well as a time cutting of their accomplishing and safety improving.

1 dwg

FIELD: mining industry.

SUBSTANCE: invention relates to mining industry and may be used when mining potassium and coal beds with hard-caving roof, in particular, during mineral selective mining with partial stowing of worked-out area. The method to control hard-caving roof implies leaving of pillars, partial stowing of worked-out area with side and central packs from boundary and stowing (airway) entries of the face. Additionally, mineral is recovered from pillars and resulting space is gobbed, width h of additional mining being determined according to formula m, where L - length of place, m. The invention provides for increase in mineral recovery ratio by 15-30%, less amount of drivage, and roof caving control during working face travel, i.e. roof-caving increment being constant, with no adverse effect on the face operation.

EFFECT: increased mineral recovery ratio, less amount of drivage, roof caving control during working face travel.

1 dwg

FIELD: mining industry.

SUBSTANCE: method includes use of screw-drilling machine for driving of several first ventilation shafts in ore body and driving several second shafts, while second and each second shaft crosses, at least, one matching first shaft, forming first support walls, supporting ceiling. First supporting ceilings consist of ore body zones between neighboring second shafts, each first support wall has portion of at least one first shaft, passing horizontally through it. Horizontal channels are formed, each of which is placed transversely to matching second shaft between appropriate portions of first shaft, formed in adjacent support walls, for forming of group of continuous ventilation shafts. Second shafts are filled for forming second supporting walls, supporting well ceiling, and first supporting walls are extracted. First ventilation shafts can be made parallel to each other. Second shafts may be directed perpendicularly relatively to first ventilation shafts. In ore body air-outlet and air-inlet ventilation mines can be formed, placed at distance from each other along horizontal line, while first or each first ventilation shaft passes through portion of ore body between air-inlet and air-outlet ventilation mines. Driving of second or each second shaft can be performed by cutting machine, or by drilling or explosive mining.

EFFECT: higher efficiency.

7 cl, 11 dwg