Thermal electric power station

FIELD: electrical engineering.

SUBSTANCE: thermal power station comprises steam turbine with high-pressure bleeder heaters connected to turbine feed water line downstream feed water deareator and, following the heating medium, to the turbine regenerative steam extraction lines. The high-pressure regenerative heater steam condensate is forced, via condensate line, into the drum-evaporator. The steam produced in the aforesaid drum is forced, via a steam line and as an additional heating agent, into the feed water deareator. The rest condensate in the drum-evaporator is forced there from, via the condensate line and as a heating agent, in the extra feed water vacuum deareator. The said additional feed water prepared in the aforesaid vacuum deareator is forced by the feed pump into the primary condensate line.

EFFECT: higher efficiency of thermal electric power station.

1 cl, 1 dwg

 

The invention relates to the field of power engineering and can be used in thermal power plants.

Known analog - thermal power plant containing steam turbine included in the feedwater pipeline turbine after deaerator feedwater regenerative high pressure heaters, connected in the heating medium to the regenerative extraction steam turbine (Ain, Bmilanov, Vinebranch, Enterica. Heat: the Textbook for high schools; edited Any. -M.: Stroiizdat, 1982. - 336 S., s-275). This analog adopted as a prototype.

The disadvantages of analogue and prototype is the low efficiency of thermal power plants due to inefficient use of high-grade condensate heaters high pressure due to its removal into the deaerator feed water.

The technical result achieved by the present invention is to increase the efficiency of thermal power plants by increasing efficiency in the deaeration unit as heating agents streams obtained by the separation in the drum evaporator condensate regenerative high pressure heaters.

To achieve this result, the proposed thermal power plant containing a steam turbine, is included in the pipeline p. the test water turbine after deaerator feedwater regenerative heaters high pressure, connected via the heating medium to the regenerative extraction steam turbine.

The peculiarity lies in the fact that during the first regenerative feedwater heater high pressure is connected by a pipeline with the drum evaporator, connected by a couple to the deaerator feedwater, and condensate is connected to the vacuum deaerator incremental feed water.

New interconnection element allows to raise efficiency of use of high-grade condensate regenerative heaters high pressure, which increases the efficiency of thermal power plants by reducing the costs of heating agents in the deaeration units.

Next, consider the information, confirming the possibility of carrying out the invention with getting the required technical result.

The drawing shows a schematic diagram of thermal power station. The station contains a boiler 1 steam turbine 2 with regenerative filters, the condenser 3, the pipeline of the main condensate turbine 4 with the inclusion of regenerative heaters low 5, 6, 7, 8, and high 9, 10, 11 pressures, atmospheric deaerator 12. The drum evaporator 13 is connected by a steam pipe 14 with atmospheric deaerator 12, and a condenser 15 is connected with a vacuum deaerator 16. Vacuum deaerator the 16 is connected by a pipeline of additional feedwater 17 through the pump 18 to the pipe 4 of the main turbine condensate, for example, the second along the main condensate low pressure heater 6.

Thermal power plant works as follows.

Generated in the boiler 1 steam is directed into the turbine 2 and condense in the condenser 3, the main turbine condensate served in regenerative heaters low pressure 5, 6, 7, 8, later in atmospheric deaerator 12, after which the main turbine condensate feed pumps pump through the high pressure heaters 9, 10, 11, and serves in a steam boiler. As an additional heating agent in the atmospheric deaerator 12 to the steam line 14 from the drum evaporator 13 is fed obtained pairs, while received in the drum evaporator 13 condensate is routed to a condenser 15 as a heating agent into the vacuum deaerator 16, and cooked it feed water is supplied to feed pump 18 through the pipe 17 into the pipe main turbine condensate 4, for example, the second along the main condensate low pressure heater 6.

Thus, the proposed solution allows to increase the efficiency of thermal power stations through effective use in the deaeration unit as heating agents streams obtained by the separation in the drum evaporator condensate regenerative heaters high is anyone pressure.

Thermal power plant containing steam turbine included in the feedwater pipeline turbine after deaerator feedwater regenerative high pressure heaters, connected in the heating medium to the regenerative extraction steam turbine, characterized in that the first during regenerative feedwater heater high pressure is connected by a pipeline with the drum evaporator, connected by a couple to the deaerator feedwater, and condensate is connected to the vacuum deaerator incremental feed water.



 

Same patents:

FIELD: heating.

SUBSTANCE: proposal is given for a method of controlling hermeticity of vacuum systems of turbo-installations through visual observation of the leakage of medium through a turbine condenser. The vacuum system hermeticity control is carried out during operation of turbo-installation of a steam pressure condenser, at the places where steam leaks from the condenser through increasing the pressure of the exhaust steam in the condenser to excess of 0.05-0.2 kgf/cm2 by temporarily closing the injector.

EFFECT: increased reliability and economy of the thermal power plant through increase in the quality of equipment and elimination of air cupping spots in the vacuum system of the turbo-installation.

1 cl, 1 dwg

FIELD: heat power industry.

SUBSTANCE: combined cycle power plant (CCPP) for combined heat and power production consists of gas turbine unit connected to heat recovery steam generator (HRSG), additional HRSG. Both generators are connected to steam extraction turbine. Turbine heat exchanger condenser and peaking water heater supplied with steam from HRSGs through pressure-reducing desuperheating station are included into heating line of delivery water supplied to consumers. Dry-air cooling tower with main-line recirculation pump are also a part of CCPP. Combined cycle power plant is provided with another gas turbine unit connected to additional HRSG and boiler. Besides, additional boiler is connected to extraction part of steam extraction turbine by steam while by water it is arranged between condenser heat exchanger and peaking water heater which outlet is connected to dry-air cooling tower with recirculation pump.

EFFECT: increase of heat and electric power under concurrent expansion of steam turbine plant capacity when electric and heat load is changed, independent heating of delivery water and minimisation of total plant area.

3 cl, 1 dwg

Thermal power plant // 2324825

FIELD: mechanic, energetic.

SUBSTANCE: the invention relates to the area of the heat power industry and can be used on thermal power plants. The thermal power plant contains a steam turbine, one of which, as a minimum, has a condenser, and a pipeline for steam feeding to the condenser of the turbine is connected to the pipeline of steam bled from one of the adjacent turbines. The monitoring of airtightness of vacuum systems of turbine plants is carried out by steam leakages through condenser leaking locations, by increasing the pressure in the condenser to an overpressure using the steam of regenerative turbine bleed. The proposed allows to increase the reliability of the thermal power plant by increasing the quality of detecting and elimination of locations of air inflow into the vacuum system of a turbine plant.

EFFECT: increases reliability of thermal power plant.

1 cl, 1 dwg

FIELD: mechanic, energetic.

SUBSTANCE: the invention relates to the area of the heat power industry and can be used in thermal power plants. A method for monitoring airtightness of vacuum systems of turbine plants is proposed, according to which, the fluid is fed to the condenser medium when turbines are stopped for pressurizing the condenser, and condenser leakages are detected visually the fluid leakage locations. The monitoring of airtightness of vacuum systems of turbine plants is carried out by steam leakages through condenser leaking locations, by increasing the pressure in the condenser to an overpressure using the steam of regenerative turbine bleed. The proposed allows to increase the reliability of the thermal power plant by increasing the quality of detecting and elimination of locations of air inflow into the vacuum system of a turbine plant.

EFFECT: increases reliability of thermal power plant.

1 cl, 1 dwg

FIELD: heat power engineering.

SUBSTANCE: proposed thermal power station has gas-turbine plant, steam boiler to which gas duct of oxidizer-waste gases of gas turbine is connected, and convection steam superheater, water economizer, high-pressure gas-water heater arranged in boiler downtake gas duct, extraction steam turbine plane with heating and regenerative steam extractions, condenser higher-pressure deaerator connected by deaerated feed water pipeline through feed pump with high-pressure gas-water heater of steam boiler. Water-to-water heater installed for heating additional feed water after atmospheric deaerator is connected by heating medium line to pipe for feed water deaerated in higher pressure deaerator before series-connected regenerative low-pressure heater connected to turbine extraction and high pressure gas-water of steam boiler.

EFFECT: increased economy of thermal power station.

1 dwg

FIELD: heat power engineering.

SUBSTANCE: according to proposed method of operation of thermal power station, waste gases of gas-turbine plant-oxidizer for combustion of fuel are directed to burners of steam boiler in downtake gas duct of which combustion products are cooled in convection steam superheater, water economizer, high-pressure gas-water heater and low-pressure gas-water heater, superheated steam after steam boiler steam superheater is directed to extraction steam turbine plant from controlled heating extractions of which steam is directed for heating system water in lower and upper system heaters, feed water deaerated in higher pressure deaerator is heated to required temperature before delivered into water economizer of steam boiler. Additional feed water after atmosphere deaerator is heated in water-to-water heater connected by heating medium line to deaerated water pipeline after higher pressure dearator, after which cooled deaerated water is directed successively into regenerative lower pressure heater and through feed pump, into high pressure gas water heater of steam boiler.

EFFECT: increased economy of thermal power station owing to provision of conditions for additional power generation at heat consumption of steam turbine and more complete utilization of excess heat of waste gases of gas-turbine plant.

1 dwg

FIELD: heat power engineering.

SUBSTANCE: according to proposed method of operation of thermal power station, waste gases of gas-turbine plant-oxidizer for combustion of fuel are directed to burners of steam boiler in downtake gas duct of which convection steam superheater, water economizer, high-pressure gas-water heater and low-pressure gas-water heater are installed, and superheated steam after steam boiler steam superheater is directed into extraction steam turbine plant from controlled steam extractions of which steam is directed to heat heating system water in lower and upper system heaters, feed water deaerated in higher pressure deaerator is directed through feed pump into high-pressure gas-water heater of steam boiler. Additional feed water after atmospheric deaerator is heated in water-to-water heater connected by heating medium line to deaerated water pipeline after higher pressure deaerator after which cooled deaerated water is directed for heating, successively, in steam boiler high-pressure gas-water heater and group of heaters of high-pressure regeneration system of steam turbine plant.

EFFECT: increased economy of thermal power station owing to provision of conditions for additional power generation at heat consumption of steam turbine and more complete utilization of excess heat of waste gases of gas-turbine plant.

1 dwg

FIELD: heat power engineering.

SUBSTANCE: proposed thermal power station has gas-turbine plant, steam boiler to which gas duct of oxidizer-waste gases of gas turbine is connected, and convection steam superheater, water economizer, high-pressure gas-water heater arranged in downtake gas duct of boiler in direction of gas flow, extraction steam turbine plant with heaters of low and high pressure regeneration system, condenser, atmospheric deaerator of additional feed water with pipeline of source and deaerated additional waters, higher pressure deaerator connected by deaerated feed water pipeline through feed pump with high-pressure gas-water heater of steam boiler. Water-to-water heater connected to additional feed water pipeline after atmospheric dearator is connected by heating medium pipeline to deaerated water pipeline after higher pressure deaerator.

EFFECT: increased economy of thermal power station.

1 dwg

FIELD: heat power engineering.

SUBSTANCE: in periods of reduced load on thermal power station, increased extraction of steam from turbine extractions is done. Said steam is used to heat reserve high-temperature heat carrier to 250-300°C, and at peak hours, flow of return heating water is divided into two parallel flows, first of which including 10-30% of return heating water is heated to temperature of 250-300°C at pressure of 4.0-8.6 and then is mixed with second flow and delivered by injector-mixer into turbine system heaters. Used as active liquids in injector is return heating water of first flow, and as passive liquid, water of second flow. Invention provides reduction of consumption characteristics of transfer pumps, reduction of overall dimensions of heat exchange equipment and capital outlays for construction of power stations.

EFFECT: increased efficiency and maneuverability of stations.

3 cl, 1 dwg

FIELD: heat power engineering.

SUBSTANCE: invention can be used at heat electric generation plants operating with extraction turbines. According to proposed method, steam from power generating boiler is supplied to high-pressure cylinder, and steam from waste-heat recovery boiler of single-circuit steam-gas plant is supplied to following cylinder. Condensate is heated in low-pressure heaters and deaerator. Feed water is heated in high-pressure heaters with extraction of steam to last high-pressure heater in direction of feed water flow from exhaust of high-pressure cylinder. Part of condensate after deaerator is directed to waste-heat recovery boiler. System water is heated in boilers. To increase power, heat load and economy of extraction turbine plant, compartment of staged after steam extraction of corresponding high-pressure heater are removed from following cylinder and stages with higher flow capacity are installed in their place. After deaerator, supply of feed water to waste-heat recovery boiler in amount equal to flow rate of steam to following cylinder from waste-heat recovery boiler is provided.

EFFECT: improved operation of extraction turbine plant.

1 dwg

Cogeneration system // 2252322

FIELD: thermal engineering; district heating from heat and power cogeneration systems.

SUBSTANCE: proposed system has extraction and condensing turbines, their waste steam cooling systems, heat pump units, peak heaters, and heat networks integrated by means of common delivery-water circuit so that common flow of return water is divided into parallel flows, each functioning as low-potential heat flow for heat-pump stations; each of heat-pump units of heat-pump station parallel-connected along delivery water flow affords same water cooling thereby providing for using identical design and thermodynamic cycles of heat-pump units; these thermodynamic cycles include two isobars (heat inlet and outlet) and two polytropes (working medium compression in compressor and expansion in turbine); in addition to recovered waste heat of turbine delivery water is heated by trash burning heat obtained by two alternative ways: for cogeneration power station situated outside the populated area it services incinerating plant heats water discharged from this power station which enables increasing power generated by its turbines, and when cogeneration station is located within populated area it services, water is heated downstream of condensing turbines which enhances power output of the latter.

EFFECT: enhanced competitive strength of district heating cogeneration system.

1 cl, 2 dwg

Power station // 2259482

FIELD: power engineering.

SUBSTANCE: power station has thermal turbine with steam ducts, grid heaters connected via heating environment to grid pipeline, deaerator with steam pipelines, source water and heating agent - overheated water pipelines, connected by deaerated feeding water pipeline to reverse grid pipeline, source water heater, enabled in pipeline of source water, to which heating environment pipeline is connected. Station is provided with adjuster of content of solved oxygen in feeding water of heating grid, which is connected to delay sensor of solved oxygen in deaerated feeding water and to adjusting organs on pipeline of heating environment of heater of source water and steam pipeline.

EFFECT: higher reliability, higher efficiency.

1 dwg

FIELD: power engineering.

SUBSTANCE: method includes heating grid water in grid heaters by steam of heating ducts of thermal turbine, feeding water of heating grid prior to feeding into reverse grid pipeline is deaerated, after that source and overheated water is fed into deaerator. Preservation of given concentration of solved carbon dioxide in deaerated feeding water is performed by consecutive adjustment of source water temperature and steam flow, while in case of increase of concentration of solved carbon dioxide relatively to given value, firstly, temperature of source water is increased, and then if necessary flow of steam is increased, and, vice versa, in case of decrease of concentration of carbon dioxide relatively to given value firstly flow of steam is decreased, and then temperature of source water is lowered.

EFFECT: higher efficiency, lower costs.

1 dwg

Power station // 2259484

FIELD: power engineering.

SUBSTANCE: power station has thermal turbine with steam ducts, connected along heating environment to heating devices and enabled in heating environment into network pipeline network heaters, deaerator with pipelines for steam exhaust, source water and heating agent - overheated water, connected by pipeline for deaerated feeding water to reverse network pipeline, source water heater, enabled in pipeline for source water, to which heating environment pipeline is connected. Station is provided with pH adjuster of feeding water of heat network, which is connected to pH sensor of deaerated feeding water and to adjusting organs on pipeline of heating environment of heater of source water and steam exhaust pipeline.

EFFECT: higher reliability, lower costs, higher efficiency.

1 dwg

FIELD: power engineering.

SUBSTANCE: system has boiler, steam turbine, electric generator, deaerator, feeding pump, and is additionally provided with gas-steam turbine plant block having low-pressure combustion chamber, steam-gas mixture heat utilization block and separated water utilization block. Steam-gas mixture heat utilization block has utilization boiler with high-pressure steam generator and additional low-pressure steam generator. Block for using separated water via low-pressure nutritious water pipeline is connected to low-pressure steam generator of utilization boiler and via irrigation water pipeline is connected to irrigation device of steam-gas mixture heat utilization block. Input of high-pressure steam generator of utilization boiler is connected by steam-gas mixture pipeline to output of steam-gas turbine plant. Low-pressure steam generator of utilization boiler is connected via low-pressure steam generator to additional combustion chamber of steam-gas turbine plant. Block for using separated water via pipelines for low-pressure nutritious water, irrigation water and separated water is connected to block for utilization of steam-gas mixture heat and via pipelines for cooled down and heated network water - to base main line. High-pressure steam generator is connected via high-pressure nutritious water pipeline and high-pressure steam pipeline to base main line.

EFFECT: higher efficiency.

2 dwg

FIELD: power engineering.

SUBSTANCE: system has boiler, steam turbine, electric generator, deaerator and feeding pump, and additionally has steam-gas turbine plant block with low pressure burning chamber, steam-gas mixture heat utilization block and block for using separated water. Block for utilization of heat of steam-gas mixture has utilization boiler with steam generator of high pressure and additional low-pressure steam generator. Block for using separated water via low pressure nutritious water pipeline is connected to input of low pressure steam generator of utilization boiler and via irrigation water pipeline is connected to irrigation device of steam-gas mixture heat utilization block. Input of high pressure steam generator of utilization boiler is connected via steam-gas mixture pipeline to output of steam-gas turbine plant. Low-pressure steam generator of utilization boiler is connected via low-pressure steam pipeline to additional combustion chamber of gas-steam turbine plant. Block for using separated water via pipelines for low-pressure nutritious water, irrigation water and separated water is connected to steam-gas mixture heat utilization block, and via softened heated and deaerated nutritious water pipeline - to base heat and electricity main line. High-pressure steam generator is connected via high-pressure nutritious water pipeline and high-pressure steam pipeline to base main line.

EFFECT: higher efficiency.

2 dwg

FIELD: power engineering.

SUBSTANCE: heat exhausted from additional steam-gas turbine plant is utilized to generated high pressure steam and additionally low pressure steam. High pressure steam is sent to and expanded in thermal steam turbine. Low pressure steam is sent to additional low pressure combustion chamber of steam-gas turbine plant, to where also additional fuel is directed, temperature of steam-gas mixture is set mainly at level close to 900°C and expanded in low pressure steam-gas turbine. Nutritious water for generation of high pressure steam is taken from high pressure deaerator of main electrical heating line. Into steam-gas mixture, cooled down for generation of low pressure steam, irrigation water is injected, steam component of this steam-gas mixture is condensed, formed condensate is separated and then drained to tank for separated water. Least portion of separated water is used as nutritious water for generation of low pressure steam. Heat of most portion of separated water is used to heat up softened nutritious water, which is then deaerated and sent to heating network of open thermal system of main electrical heating line. Irrigation water cooled down during the process is fed for condensation of steam in steam-gas mixture.

EFFECT: higher efficiency.

2 dwg

FIELD: power engineering.

SUBSTANCE: method includes utilization of heat exhausted from additional steam-gas turbine plant for generation of high pressure steam and additional low pressure steam. High pressure steam is sent to and expanded in thermal steam turbine. Low pressure steam is fed to additional low pressure combustion chamber of steam-gas turbine plant, additional fuel is sent same way as steam, and temperature of steam-gas mixture is set mainly at level close to 900°C and it is expanded in low pressure steam-gas turbine. Nutritious water for generation of high pressure steam is fed from deaerator of high pressure heating and electrical line. Into steam-gas mixture, cooled down during generation of low pressure steam, irrigation water is injected, steam component of this steam-gas mixture is condensed, formed condensate is separated and drained into tank for separated water, from which cooled down irrigation water is fed for condensation of steam in steam-gas mixture. Least portion of separated water is used as nutritious water for generation of low pressure steam. Heat of most portion of separated water is used to heat a portion of network water from closed thermal system of main electrical and heating line.

EFFECT: higher efficiency.

2 dwg

FIELD: heat power engineering.

SUBSTANCE: according to proposed method system water is heated in system heaters by steam of heating extractions of extraction turbine. Make up water of heat supply system is deaerated before delivering into return pipeline. For this purpose source and overheated water is delivered into deaerator. Maintaining of preset concentration of oxygen dissolved in deaerated make up water is provided by successive regulation of temperature of source water and rate of flash steam. If concentration of dissolved oxygen exceeds preset value, first, temperature of source water is raised and then, if necessary, rate of flash steam is increased and on the contrary, if concentration of oxygen is lower than preset value, first rate of flash steam is reduced and then temperature of source water.

EFFECT: increased efficiency and economy of thermal power station.

1 dwg

FIELD: power and heat generation.

SUBSTANCE: proposed power and heating plant with open power and heat supply system including boiler unit, steam turbine, deaerator and feed pump includes steam-gas turbine plant unit with low-pressure afterburning chamber, steam gas mixture heat recovery unit containing recovery boiler with high-and-pressure steam generators, spraying device, gas cooler-condenser and separated water utilization unit. Separated water utilization unit is connected with input of low-pressure steam generator of recovery boiler through water softening set and deaerator. Spraying device is connected with raw water softening device of power and heating plant. Input of high-pressure steam generator of recovery boiler is connected with output of steam-gas-turbine plant. Low-pressure steam generator of recovery boiler is connected with additional afterburning chamber of steam-gas turbine plant. Separated water utilization unit is connected by pipeline of softened and deaerated low-pressure feed water with steam-gas mixture heat recovery unit and pipeline of softened, heated and deaerated make-up water with open power and heat supply system. High-pressure steam generator is connected by feed water and steam pipelines with power and heating plant.

EFFECT: provision of effective modernization of steam turbine power and heating plants with increase of power and economy.