Method for horizontal well bottom zone interval treatment

FIELD: oil production, particularly methods for stimulating production by forming crevices or fractures using eroding chemicals.

SUBSTANCE: method involves determining zones characterized by different oil saturation and permeability in horizontal uncased well bore; arranging flow string in cased vertical part of the well; locating extreme-line coiled tubing pipe inside flow string; arranging coiled tubing pipe end opposite to reservoir zone having minimal oil saturation and permeability; injecting acid solution in well through extreme-line coiled tubing pipe; lifting extreme-line coiled tubing pipe in cased well zone; forcing acid solution in reservoir through flow string; serially arranging extreme-line coiled tubing pipe end in reservoir zones characterized by increasing oil saturation and permeability; injecting acid solution in well through extreme-line coiled tubing pipe aligned with each zone; lifting extreme-line coiled tubing pipe in casing pie; forcing acid solution in reservoir through pipe string; performing time-delay and carrying out swabbing operation. Acid solution is forced at rate of 3-4 m3/hour under 1-3 MPa pressure at well head.

EFFECT: increased deliverability of well drilled in non-uniform reservoir.

1 ex

 

The invention relates to the oil industry and can find application in the treatment of bottom-hole zone in horizontal wells wells.

The known method interval processing bottom-hole zone of horizontal wells, according to which the entire length of the rejected barrel determine the porosity, permeability and saturation stalk zone. Them set intervals, low permeability, assess the degree of cavernosal and trunk diameters at their ends. Based on the characteristics of the identified intervals on the surface mount pipe layout at the end of which set the ring under saddle locking ball on both ends of the hydraulic packers. Between them in the pipe layout perform radial end-to-end calibrated channel. Secure the pipe layout on the end of the pipe string and lowered into the borehole rejected to the mouth of the barrel. When nezaplanirovannyj the packers do a reverse or direct leaching of the barrel. Subsequently pumped into the borehole acid in a volume equal to the volume of the first processing interval. Discharge shut-off ball spacerowa with both ends of the bottom interval of the barrel, low permeability and simultaneously crush him in acid, and then leave a hole on the reaction. Then both packer rapacuronium, hold back about the ku trunk. Remove the reaction products and raise to the surface of the locking ball. Through lift pipe string, the pipe layout with packers translate in the opposite direction from the bottom toward the second area from the bottom of the interval, low permeability and repeat the above operations. Alternately conduct operations with each processing interval. Improving the efficiency of the treatment fluids zone rejected barrel due to selective effects on each interval in a single descent device for processing (Patent RF №2247832, CL EV 43/27, publ. 2005.03.10).

The known method does not allow sufficiently to increase the productivity of the well.

Closest to the invention to the technical essence is a way of interval processing bottom-hole zone of horizontal wells, which are as follows. Carry out the injection interval in the bottom zone of the acid solution. The sequence of injection set far from interval to interval closest to the vertical wellbore. Download lead through the column tubing. When processing the next interval, move the end of the column tubing to the treated interval. In each of the processed interval inject the acid solution and an aqueous solution of the emulsifier.

The injection of acid and emulsifier is carried out with a flow rate of 24-35 m 3/day and at a pressure in the mouth on the column tubing of 0.8-1.5 MPa. Spend the technological holding no more than 3 hours and perform swabbing to depression on the bottom hole is not lower than 3 MPa (RF Patent No. 2278966, CL EV 43/27, publ. 2006.06.27).

There is a method allows to increase the productivity of wells, however, are ineffective in the treatment of wells that discover reservoir with high heterogeneity.

The invention solves the problem of increasing the productivity of horizontal wells, which revealed the formation with high heterogeneity.

The task is solved in that in the method of interval processing bottom-hole zone of horizontal wells, including injection interval through the string of tubing into the well of the acid solution, the displacement of the acid solution into the formation, conduct technological exposure and swabbing, according to the invention, the column tubing is placed in the cased vertical part of the well, inside the column tubing place the collar without coupling pipe, coiled tubing, define the zones of horizontal open hole wells with different saturation and permeability, pipe end of the coiled tubing is placed opposite the zone with the minimum oil saturation and permeability, pumped into the well through the collar without coupling t is Ubu coiled tubing acid solution, raise the collar without coupling pipe coiled tubing in a cased the well area, push the column tubing solution of the acid into the formation, then place the end of the collar without coupling pipe coiled in series formation zones with increasing saturation and permeability, opposite each zone is injected into the hole through the collar without coupling pipe coiled tubing acid solution, raise the collar without coupling pipe coiled tubing in a cased zone of the bore hole and push the column tubing solution of the acid into the formation, while the displacement of the acid solution is conducted with a flow rate of 3-4 m3per hour at a pressure at the wellhead 1-3 MPa.

Features of the invention are:

1) interval injection through the string of tubing into the well of the acid solution;

2) displacement of the acid solution into the reservoir;

3) conducting technological extracts;

4) swabbing;

5) placement of the column tubing in a cased vertical part of the borehole;

6) placement inside the column tubing collar without coupling pipe coiled tubing;

7) determination of the zones of horizontal open-hole wellbore with different saturation and permeability;

8) placement of a tube end of the coiled tubing opposite the zone with the minimum oil saturation and permeability;

9) Zack the CA in the hole through the collar without coupling pipe coiled tubing acid solution;

10) the rise of the collar without coupling pipe coiled tubing in a cased the well area;

11) the displacement of the column tubing acid solution into the reservoir;

12) next, the placement of the end collar without coupling pipe coiled in series formation zones with increasing saturation and permeability, opposite each zone injection well through the collar without coupling pipe coiled tubing acid solution, the rise of the collar without coupling pipe coiled tubing in a cased the well area and the bursting of the column tubing acid solution into the reservoir;

13) the displacement of the acid solution with a flow rate of 3-4 m3/h;

14) the same when the pressure at the wellhead 1-3 MPa.

Signs 1-4 are common with the prototype, signs 5-14 are the salient features of the invention.

The invention

During the operation of oil and injection of horizontal wells is the deposition clogging elements that reduce the permeability of the bottom zone and, consequently, reducing well productivity. Traditionally used technologies interval of bottomhole zone treatment solution of hydrochloric acid leads to minimal effect. The invention solves the problem of increasing the productivity of horizontal wells, which revealed the formation with high heterogeneity. The problem is solved after the existing image.

When the interval treatment of bottom-hole zone of a horizontal well define the zones of horizontal open-hole wellbore with different saturation and permeability. The column tubing is placed in the cased vertical part of the borehole. Inside the column tubing place the collar without coupling pipe coiled tubing. The pipe end of the coiled tubing is placed opposite the zone with the minimum oil saturation and permeability. Pumped into the well through the collar without coupling pipe coiled tubing acid solution. Raise the collar without coupling pipe coiled tubing in a cased the area well. Push the column tubing solution of the acid into the formation. Next, place the end of the collar without coupling pipe coiled in series formation zones with increasing saturation and permeability. Opposite each zone is injected into the hole through the collar without coupling pipe coiled tubing acid solution. Raise the collar without coupling pipe coiled tubing in a cased the area well. Push the column tubing solution of the acid into the formation. Spend the technological holding no more than 3 hours. Perform swabbing to depression on the bottom hole is not lower than 3 MPa.

The displacement of the acid solution is conducted with a flow rate of 3-4 m3per hour at a pressure at the wellhead 1-3 MPa. As restorability use 10-15%solution of hydrochloric acid.

Specific example

Spend interval processing bottom-hole zones of oil horizontal well length 250 m Define the zones of horizontal open-hole wellbore with different saturation and permeability. Identify three zones with saturation (D.%) and permeability (MD), respectively 0,859 and 27.6, 0,887 and 41, 0,892 and 43.6. The bottom of the column tubing is placed in the cased vertical part of the borehole at the depth of cased columns. Inside the column tubing place the collar without coupling pipe coiled tubing.

The lower end of the pipe coiled tubing is placed opposite the zone with the minimum oil saturation and permeability 0,859 and 27.6. Pumped into the well through the collar without coupling pipe coiled tubing 12%solution of hydrochloric acid in a volume of 20 m3. Raise the collar without coupling pipe coiled tubing in a cased the area well. Push the oil through the tubing pipe acid solution into the reservoir with a flow rate of 3 m3per hour at a pressure head of 1 MPa.

Place the end of the collar without coupling pipe coiled in the area with the next largest oil saturation and permeability 0,887 and 41. Opposite this area is injected into the hole through the collar without coupling pipe coiled tubing 12%solution of hydrochloric acid in a volume of 25 m3. Raise the collar without coupling pipe coiled tubing is lined area well. Push the column tubing the acid solution into the reservoir with a flow rate of 3.5 m3per hour at a pressure head of 2 MPa.

Place the end of the collar without coupling pipe coiled in the area with the next largest oil saturation and permeability 0,892 and 43.6. Opposite this area is injected into the hole through the collar without coupling pipe coiled tubing 12%solution of hydrochloric acid in the amount of 30 m3. Raise the collar without coupling pipe coiled tubing in a cased the area well. Push the column tubing the acid solution into the reservoir with a flow rate of 4 m3/h at a pressure in the mouth 3 MPa.

Spend the technological holding no more than 3 hours. Perform swabbing to depression on the bottom hole is not lower than 3 MPa.

As a result, the flow rate was 12 m3/day. In similar conditions when performing work on the prototype of the well production rate does not exceed 4 m3/day.

The application of the proposed method will allow to solve the problem of increasing the productivity of horizontal wells, which revealed the formation with high heterogeneity.

The method of interval processing bottom-hole zone of horizontal wells, including injection interval through the string of tubing into the well of the acid solution, the displacement of the acid solution into the formation, conduct technological exposure and swabbing, ex is different, however, that column tubing is placed in the cased vertical part of the well, inside the column tubing place the collar without coupling pipe, coiled tubing, define the zones of horizontal open-hole wellbore with different saturation and permeability, pipe end of the coiled tubing is placed opposite the zone with the minimum oil saturation and permeability, pumped into the well through the collar without coupling pipe coiled tubing acid solution, raise the collar without coupling pipe coiled tubing in a cased the well area, push the column tubing solution of the acid into the formation, then place the end of the collar without coupling pipe coiled in series formation zones with increasing saturation and permeability, opposite each zone download in the hole through the collar without coupling pipe coiled tubing acid solution, raise the collar without coupling pipe coiled tubing in a cased zone of the bore hole and push the column tubing solution of the acid into the formation, while the displacement of the acid solution is conducted with a flow rate of 3-4 m3/h at a pressure at the wellhead 1-3 MPa.



 

Same patents:

FIELD: oil production, particularly means to apply action to bottomhole formation zone.

SUBSTANCE: method involves supplying chemically active liquid into under-packer zone via flow string with the use of power unit of centrifugal pump by means of flow switching system with jet device nozzle by-passing. Liquid is supplied by means of hydraulic impacts created by pressure accumulator. Intake capacity change is recorded by flow meter installed in injection line. After that flow is switched for liquid supply from replenishing vessel to centrifugal pump inlet for liquid delivering to jet devices installed over packer. Liquid to be ejected has volume controlled by flow meter and is discharged via flow strings to surface into replenishing vessel.

EFFECT: increased differential pressure drawdown and provision of reaction product removal.

2 cl, 2 dwg

FIELD: oil industry, particularly methods for stimulating production by forming crevices or fractures.

SUBSTANCE: method involves injecting working agent through injection wells and extracting oil through producing wells. Side well bores extend for depth of 20-100 m and are drilled in amount of 2-4 bores for each 1 m of reservoir thickness. Hydrochloric acid solution is injected in portions having specified volumes in accordance with predetermined regimes and injected treatment solution is extracted from well. Hydrochloric acid solution is forced in well with oil in pulsed mode in said regime. Reaction products and contaminants are removed by means of ejection plant or by swabbing operation along with reservoir influx flow parameter recording. Then well groups are joined in 5 or 7-point clusters having injection well in cluster center along with radial reservoir penetration. Working agent is injected in cyclic regime through central injection well. Additional hydro-acid reservoir fracturing may be also performed.

EFFECT: increased amount of oil to be produced and increased oil recovery.

2 cl, 1 ex

FIELD: oil industry, particularly methods for stimulating production by forming crevices or fractures by use of eroding chemicals.

SUBSTANCE: method involves flushing well with oil; regenerating productive reservoir perforation in amount of at least 5 orifices per 1 meter; injecting 1.5-2.0 m3 of hydrochloric acid solution in reservoir; holding the process under bath conditions for 2.5-3.5 hours; performing pulsed injection of the first hydrochloric acid solution portion with predetermined volume and in preset regime; carrying out injection of the second hydrochloric acid solution portion; holding the process in continuous regime; performing time delay; carrying out injection of the third hydrochloric acid solution portion in continuous regime under 1-4 MPa pressure; executing time delay; carrying out injection of the forth hydrochloric acid solution portion in predetermined regime; performing time delay and removing reaction product by swabbing operation.

EFFECT: increased efficiency of well bottom zone treatment.

1 ex

FIELD: oil production, particularly methods for stimulating production by forming crevices or fractures by use of eroding chemicals.

SUBSTANCE: method involves drilling branch bores in well; lowering ejector plant provided with packer; injecting 10-15% hydrochloric acid solution having predetermined volume; holding the process under bath conditions; performing 4-6-fold pulsed solution forcing in reservoir under specified conditions; executing time delay; terminating injection in continuous mode; performing time delay; extracting injected solution in amount of up to 2.5 of injected solution volume; injecting the second portion in reservoir in pulsed regime in the beginning of said portion injection; executing time delay and performing continuous solution injection; performing time delay; extracting injected solution in amount of up to 2.5 of injected solution volume; injecting the third solution in reservoir in pulsed regime in the beginning of said portion injection; executing time delay and performing continuous solution injection; extracting injected solution in amount of up to 2.5 of injected solution volume by means of injection plant or by swabbing operation.

EFFECT: increased efficiency.

1 ex

FIELD: petroleum industry.

SUBSTANCE: invention relates to aqueous condensed acidic compositions and methods for their using under condition of petroleum output. Aqueous condensed acidic composition comprises at least one acid chosen from group consisting of hydrochloric, hydrofluoric, acetic, formic, sulfamic and chloroacetic acids and their mixtures, and a gel-forming agent for indicated acid wherein gel-forming agent comprises at last one glycol as a solvent and at least one amidoaminoxide of indicated general formula given in the invention description and wherein indicated gel-forming composition comprises less about 10% of free fatty acid. Invention provides intensifying inflow into a hole, enhancing productivity of hydrocarbon-containing beds.

EFFECT: improved and valuable technical properties of compositions.

31 cl, 3 dwg, 2 ex

FIELD: technology for extracting various substances from wells.

SUBSTANCE: in accordance to the method, packer and jet pump are lowered into the well between productive beds, packer is installed between lower and first intermediate formation, hydro-fracturing liquid is forced into lower formation, then drainage of the bed is performed with removal of hydro-fracturing liquid from it together with proppant non-fixed in the bed, recording pressure in the well below the packer by means of autonomous manometer, after that packer is switched to transport position, pipes column with packer and jet pump is lifted and packer is unpacked between next intermediate beds, proppant seal is installed in interval from the face to the shoe of intermediate bed, then operations are repeated, and so on depending on number of productive layers, after that flexible tube is lowered through pipes column and jet pump and well is cleaned of proppant through it, after removal of proppant depression is created on productive beds and by means of geophysical device influx profiles are registered in interval from well face to entrance cone.

EFFECT: increased operational productivity of well jet plant.

5 dwg

FIELD: oil production, particularly methods for stimulating production by forming crevices or fractures using eroding chemicals.

SUBSTANCE: method involves selectively isolating highly-permeable reservoir intervals; forcing gas-liquid plug generated in reservoir with water, wherein the gas-liquid plug is created by alternate injection of neutral carbonate and gas-generation initiator catalyst in reservoir through injection well. The gas-generation initiator catalyst is injected before neutral carbonate injection in reservoir and after selective isolation of high-permeable reservoir intervals. The gas-generation initiator catalyst is solvent containing monocarboxylic acid fractions. The solvent is vegetable oil with high monocarboxylic acid content. Reservoir zone intervals are isolated by serial injection of fresh controllable elastico-viscous composition and supporting system composition in reservoir. The supporting system composition comprises aqueous flocculant solution and clay powder.

EFFECT: increased efficiency due to extended conformance and improved reservoir recovery.

3 cl, 2 dwg

FIELD: oil production, particularly to clean bottomhole reservoir zone of mud and asphalt-tar-paraffin deposits.

SUBSTANCE: method involves injecting neutral carbonate and gas-generation initiator catalyst in bottomhole reservoir zone, wherein the neutral carbonate and gas-generation initiator catalyst react to create carbon dioxide; performing time delay and dropping pressure at well bottom. The gas-generation initiator catalyst is solvent containing monocarboxylic acids. The solvent is injected before neutral carbonate injection in reservoir. The solvent is vegetable oil with high monocarboxylic acid content. Before solvent injection high-permeable bottomhole reservoir zone intervals are isolated by serial injection of fresh controllable elastico-viscous composition and supporting system composition in reservoir. The supporting system composition comprises aqueous flocculant solution and clay powder.

EFFECT: increased efficiency due to extended reservoir treatment area and increased depth of deposit cleaning.

4 cl, 1 dwg

FIELD: oil and gas production.

SUBSTANCE: invention relates to composition and process for improving production of oil from oil formation and cleaning oil-polluted land and surfaces. Composition contains at least 85% of fatty acid alkyl ester, surfactant, and acid. According to a process for producing crude oil, effective amount of production formulation based on the indicated composition is injected to oil formation before production of crude oil from that formation. Described are also oil-water emulsion demulsification process and oil-polluted land and surfaces cleaning. Invention is further developed in dependent claims.

EFFECT: reduced amount of residual oil in formation and improved quality of cleaning with nontoxic composition.

13 cl, 20 dwg, 1 tbl, 3 ex

FIELD: oil and gas production.

SUBSTANCE: method comprises mixing distillate-type solvent for petroleum wax, emulsifier "YALAN-E-1", and 22-24% aqueous solution of inhibited hydrochloric acid, which are charged to a vessel. Thereafter, hydrochloric acid solution is pumped out of the vessel from below while distillate is pumped out from above. Hydrochloric acid solution and distillate are then directed by different pumps to disperser and therefrom to the top of the vessel. Acid discharge pump is 2-3 times less efficient than distillate discharge pump. Mixing is effected at temperature from -15°C to +30°C in emulsion.

EFFECT: improved ability of oil-acid emulsion of washing out muding compounds from bottom zone.

1 dwg

FIELD: oil and gas production, particularly to complete oil and gas production wells.

SUBSTANCE: method involves performing previous well developing data analysis; diagnosing well and carrying out repair works therein. Flow string is lowered in well so that flow string reaches artificial well bottom. Well is filed with oil product or gas condensate having specific weight of 0.7-0.9 g/cm3. Then pressure drawdown of not less than 20 kg/cm3 is created. Well is perforated with tools for depth equal to 2-5% of lower non-excavated reservoir interval thicknesses at pressure drawdown in flaring well and gas inflow from reservoir is stimulated. Well is developed with gas stream, which removes liquid threw up with blast wave generated by perforators of the first perforator assembly at activation thereof within reservoir interval covered with liquid. After well development well operation is stopped for up to 2 hours in said regime and pressure and liquid level are measured in well along with following well bringing into operation. Further perforation of overlying reservoir intervals is carried out in gaseous medium as reservoir pressure becomes equal to gas pressure inside well without well flaring in the case of liquid absence and with well flaring if liquid is present.

EFFECT: increased efficiency of production reservoir development in gas, gas-condensate and oil wells, decreased time of well cleaning, improved well deliverability and reduced time of well bringing into operation.

FIELD: oil industry, particularly enhanced recovery methods for obtaining hydrocarbons by repressuring or vacuum methods.

SUBSTANCE: method involves lowering pipe string in well; installing pipe string shoe provided with cavitational generator within productive reservoir range; injecting working agent; flushing bottom zone; injecting and forcing hydrocarbon solvent in reservoir. Pipe string shoe has integrated cavitational generator with working diffusers. Number of working diffusers is equal to 2 - 4 pairs. The working diffusers are transversal to well bore axis and are grouped in pairs tangentially directed to well bore wall so that 30-60° angle is defined in-between. Working agent is injected under depression in stalling cavitation regime along with cavitational generator reciprocation inside perforated reservoir thickness range.

EFFECT: increased well producing ability due to increased cavitational field power, cavitational field energy direction on productive reservoir along with production string protection against breaking cavitational field action on productive reservoir in depression state.

1 ex

FIELD: oil production, particularly devices adapted to increase well yield by well bottom zone treatment.

SUBSTANCE: device comprises air chamber having pressure equal to atmospheric pressure and receiving chamber made of light-weight elastoplastic material and filled with solid composite material. The elastoplastic material ruptures as solid composite material combusts inside the chamber. The material consists of two components. The first component faces air chamber and is created of the following mix (% by weight): granular ammonium nitrate - 45-46, potassium dichromate - 1-2, epoxy resin - 40-42, plasticizer 2-3, hardener 9-10. The second component is created of mixture having strength exceeding well bottom pressure and including the following substances (% by weight): granular ammonium nitrate - 70-74, potassium dichromate - 3-5, epoxy resin - 19.5-21.5, plasticizer 1.5-2.0, hardener 3.5-4.5. Said solid composite material is formed as cylindrical member fixedly secured with respect to receiving chamber body by metal pins extending in radial direction.

EFFECT: increased operational reliability and efficiency, simplified production and decreased device cost.

1 ex, 1 dwg

FIELD: oil production, particularly enhanced recovery methods for obtaining hydrocarbons.

SUBSTANCE: method involves installing plunger sucker-rod pump in well filled with liquid, wherein the pump is connected to remote drive through control rod; creating isolated chambers in well; performing intermittent pressure change in separate chambers as plunger reciprocates; periodically communicating chambers having different liquid pressures with each other after full plunger reciprocation drive unloading as plunger reaches extreme upper position during downward plunger movement under gravity when control rod stress is highly decreased.

EFFECT: increased wave action power due to elimination of impact-and-dynamic equipment load.

1 dwg

FIELD: oil production, particularly enhanced recovery methods for obtaining hydrocarbons by repressuring or vacuum methods.

SUBSTANCE: method involves activating the first component in tool string to create transition depression pressure within well bore interval; activating the second component of tool string to create transition repression pressure within well bore interval before transition depression pressure creation by the first component. Device in accordance to the first embodiment comprises solid fuel with a number of cavities and blasting means installed in the cavities. Device in accordance to the second embodiment comprises band, blasting means connected to the band, solid fuel inserts arranged between blasting means and detonating fuse fastened to blasting means and solid fuel inserts in ballistic manner. Tool string comprises bearing member with blasting means arranged therein. The blasting means are activated to form orifices in bearing member and to create transition depression pressure. Tool string also has the second component, which activates solid fuel to create transition repression pressure before depression pressure creation.

EFFECT: improved reservoir communication with well bore and increased efficiency.

20 cl, 10 dwg

FIELD: mining and oil production, particularly to develop and rework producing well, namely in stimulate reservoir fluid inflow.

SUBSTANCE: device comprises cylindrical body arranged at well bottom level and closed from lower end. The cylindrical body has orifices made in upper part thereof. Device has check valve installed in sealed lower end part of cylindrical body so that the check valve opens as liquid discharges from the body, as well as supplementary cylinder having upper end connected to lower end of sucker-rod pump arranged in well over cylindrical body and supplementary cylinder. The device includes piston installed inside supplementary cylinder and connected to sucker-rod pump piston through bar and piston installed in cylindrical body so that the piston may reciprocate inside the body. The piston has orifices aligned with that of cylindrical body as piston is installed in upper position. Upper end of cylindrical body is connected to lower end of supplementary cylinder through high-pressure hose to transmit additional vibration to productive reservoir due to cylindrical body striking against inner casing pipe walls caused by hydraulic impacts accompanying implosion effect appeared as piston and cylindrical body orifices are in register with each other.

EFFECT: possibility of shock-wave well bottom treatment simultaneously with oil production without energy transfer to hydraulic pulse source by means of rigid mechanical coupling.

1 dwg

FIELD: fluid production, particularly enhanced recovery methods for obtaining hydrocarbons.

SUBSTANCE: method involves installing plunger pump in well filled with liquid; creating isolated constant and alternating pressure chambers in well, wherein the chambers are communicated with each other through channels; periodically changing pressure in separate chambers by means of plunger pump plunger reciprocation inside well; establishing periodic communication of separate well chambers with each other. Alternating pressure chamber is created in plunger pump section located under plunger by pressure decrease in the section. The pressure is decreased by plunger movement in upward direction, which provides vacuum generation in the section. Constant pressure chamber is created in plunger pump section located over plunger. Constant elevated pressure chamber is formed in annulus by annulus filling with liquid for design level. Alternating pressure chamber is communicated with constant elevated pressure chamber as plunger pump plunger moves downwards.

EFFECT: increased wave action power due to increased liquid pressure drop and, hence, increased hydrodynamic pulse during communication of well chambers having different liquid pressure.

2 cl, 1 dwg, 1 ex

FIELD: oil production, particularly enhanced recovery methods for obtaining hydrocarbons by repressuring or vacuum methods.

SUBSTANCE: pumping plant comprises pump cylinder assembly composed of two cylinders having different diameters and connected with each other so that cylinder with greater diameter is located over that having smaller diameter. Cylinder with smaller diameter has orifices made in central part thereof and is provided with spring-loaded valve connected to settler container. Settler container has orifices in upper part thereof. Pump piston assembly comprises two pistons. Upper piston is located in cylinder with greater diameter and is connected to elongated sealed piston through hollow sub with inlet orifices. The elongated sealed piston is located in cylinder with smaller diameter. Cylinder with greater diameter is connected to flow string. Upper piston is fastened to rod stem.

EFFECT: possibility of bottomhole formation zone treatment by implosion action application along with oil production and contaminant collecting from bottomhole formation zone in specially adapted settler.

2 dwg

FIELD: methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells, particularly perforators and permeators.

SUBSTANCE: method in accordance with the first embodiment involves lowering tool string in well; activating gun perforator, overburden condition providing device, processing liquid supply device and device, which creates local transition overburden condition. Method in accordance with the second embodiment involves taking information concerning fluid outburst characteristics for different well bore types; determining well bore type and processing liquid type for perforation tunnel treatment; selecting flow outburst characteristics; selecting time delay between perforation operation and flow outburst operation and selecting volume of low-pressure chamber for fluid borehole medium. Method in accordance with the third embodiment involves lowering tool string in well; activating tool string section including body with explosive charge arranged in the body; creating orifices in the body to open chamber for borehole media and activating tool string section to provide transition overburden condition. Tool string in accordance with the first embodiment comprises processing liquid supply device, which delivers processing liquid into tunnels, device to provide overburden condition and device to create local transition overburden condition. Tool string in accordance with the second embodiment comprises section with low pressure chamber and explosion means, section to create transition overburden condition and section to supply processing fluid medium in reservoir tunnels.

EFFECT: increased efficiency of reservoir fluid communication with well bore.

36 cl, 15 dwg

FIELD: enhanced recovery methods for obtaining hydrocarbons by repressuring or vacuum methods.

SUBSTANCE: method involves performing cumulative well perforation and applying implosion action at the end of well perforation within perforation interval with the use of two implosion chambers located from perforator body top and bottom; performing local formation fracturing along with implosion action. To carry out above method perforator body is made of high-strength steel. Additional implosion chamber is arranged under lower implosion chamber. Additional and lower implosion chamber interiors are communicated through channel having diameter less than implosion chamber diameter. Pipe is installed in the channel so that the pipe is directed inside additional implosion chamber. When perforator is brought into operation and implosion chambers are filled with well and formation fluids air present in lower and additional implosion chambers and compressed under the action of inflowing liquid is located between body of additional chamber and pipe so that air dome is created. Compressed air in upper implosion chamber is located in upper part of upper implosion chamber having diameter less than that of implosion chambers so that air dome is created. Diameter and length of upper part in upper implosion chamber and pipe diameter and length are calculated to provide pressure of air compression in upper and lower air domes greater than hydrostatic well pressure, as well as air volume increase to displace liquid columns from interiors of lower and upper implosion chambers one towards another. Pressure pulses created in implosion chambers directed one towards another impinge one upon another inside perforator and create summary pressure pulse directed through perforation orifices in the body to bottomhole formation zone. Implosion chamber volumes are calculated so that time of summary pressure pulse creation concurs with time of liquid column drop in well over vacuum area, which results in summing of pulses from upper and lower implosion chambers with hydraulic impact pulse, and the summary pulse is to be greater than formation pressure. Pulses from upper and lower implosion chambers simultaneously act through perforation channels to create fissured zoned in well bore zone.

EFFECT: provision of local formation fracturing along with perforation operation and implosion action on formation in single trip.

6 cl, 1 dwg

FIELD: oil and gas industry.

SUBSTANCE: method includes placement of deep operation body in perforation zone, capable of forming pressure pulses via remote initiation of gas mixture explosions. Depression of bed is performed by lowering liquid level in a well, forming a certain volume of explosive gas mixture in deep body, performing multiple effect on bed without raising of body until well product influx increases. Explosion pressure is set on basis of hydrostatic pressure of well liquid and volume of explosive gas mixture on basis of table provided in description.

EFFECT: higher efficiency.

1 tbl