Salt pile isolation in potassium mines

FIELD: methods of surface mining, particularly for following natural stone treatment by covering or impregnating thereof with liquid or other flowable substances on surface.

SUBSTANCE: method involves gunning salt pit surface with waterproofing agent; covering salt pile surface with clay-and-salt mud layer in dry and hot season after salt pile hardening in at least 1.0-1.5 months after pile filling with salt. The clay-and-salt mud is sylvinite ore-dressing waste obtained from chemical factory. The clay-and-salt mud layer has 10-20 mm thickness and is formed by gunning salt pile surface with above mud material. The clay-and-salt mud is supplied into pneumatic pump receiver, wherein solid/liquid phase ratio is 1:2 - 1:3.

EFFECT: increased efficiency of salt pile waterproofing.

 

The invention relates to various processes, and in particular to methods post-processing of natural stone by coating or impregnation fluids or fluent substances on the surface.

In 2003, on the surface of the earth on the territory of mining OJSC "Uralkali" stored about 14 million tons of solid waste. This two million tons more than in 2002. Now the total mass of salt dumps is about 250 million tons.

On the protection of "Belaruskali" is about 80 million tons of clay-salt slurries and 660 million tonnes of halite wastes, located in an area 904 and 762 hectares respectively. In Salihorsk district kalynych mines fixed salinization of groundwater under salt dumps and landfills, rasprostranivsheysya already at a depth of no more than 100 meters as a result of wind erosion of salt dumps happens and areal soil pollution.

Rasoloarison fresh colodado varies from 8 to 12%. Full saturation of waste brines at the time of filing on salaatul reaches 18-20%. Due to the pressing deep into the pile and evaporation of the liquid phase content in the salt dumps decreases and remains equal to 5-7%. The intensive process of squeezing the liquid phase and simultaneously seals the waste continues 15-18 hours, after which the seal becomes inconspicuous.

Solid halite waste the possession is t high caking. Sliianie of colodado occurs not only due to compaction under its own weight, but also due to recrystallization of the salt from the compressed brines. Moreover, the coupling of individual grains initially manifested in the surface area of the blade when it is drying, and through 1.0-1.5 months is the hardening of the entire array.

Are the salt dumps more than ninety percent of salt. The intensity of salinity adjacent to the Salihorsk mines areas is low, because precipitation is the leaching of the salt components and eventually salaatul covered with a thin elastic clay wrap, which hinders the salt spray (Genkina Century Underground brines and waste mountains. RESPUBLIKA. The newspaper of the Council of Ministers of the Republic of Belarus. No. 50 (3490), 17.03.2004,).

Clay-salt slurries containing up to 40-62% of water, 6-20% KCl, 5-24% NaCl, 0.14 to 7% MgCl2, 0,03-0,1% CaCl2, 2-5% CaSO4and 5-28% insoluble residue, which is dominated by clay minerals. These slimes in suspension pump are served in the slurry tank (pit) at a ratio of solid and liquid phases from 1: 2 to 1: 3 [1, s].

There is a method of isolation of the salt dumps on potash mines, including filling their surface waterproofing material, which is taken as the prototype [1].

The disadvantage of known the way is the low efficiency of waterproofing used for this purpose, the polymer due to its lack of elasticity.

The aim of the invention is to increase the efficiency of water proofing Solombala by applying a more elastic material.

This objective is achieved in that the surface of Solombala covered with a layer of clay-salt slurry thickness of 10-20 mm

The method is as follows.

After hardening of the entire array of Solombala, but not less than 1.0 to 1.5 months after dumping salt in a pile in the hottest and driest period of its surface covered with a layer of clay-salt slurry remaining after enrichment of sylvinite ores on gallerycheck factories, of a thickness of 10-20 mm by gunning this sludge surface Solombala. When this sludge in suspension is fed into a hopper of pneumonias when the ratio of solid and liquid phases from 1:2 to 1:3.

After drying of the sludge surface Solombala covered durable cake, as preventing wind erosion and dissolution of salt precipitation. Significant environmental effect is achieved through the use of waste products.

It should be also noted that this clay membrane screen has a high mechanical strength and water resistance due to the fact that it contains a polyacrylamide added to the thickener to accelerate the deposition of the clay is about sludge [2, p.37].

The method can be implemented, for example, using pneumomechanical WITH-50 pfbr (design engineer Marchukova NS). The pump is designed for transportation and layering on a different surface(spraying method) mortars and fine concretes minimum mobility 6 cm, with a particle size fraction of the filler is not more than 10 mm, discharge (investirovanie) solutions and other liquids in different cavities and arrays of concrete, stone, soil, etc. in order to strengthen them. The range of feed solution vertically not less than 100 m and horizontally not less than 300 m

Sources of information

1. Permiakov, R.S., V.S. Romanov, Beldy BTW, mining Technology salts. / / M.: Nedra, 1981, s.

2. Processing of natural salts and brines //Directory/ Idiomelon, Avearage, Ussurian and others; Ed. by I. Sokolov. L.: Chemistry, 1985, p.37.

The method of isolation of the salt dumps on potash mines, including filling their surface waterproofing material, characterized in that after hardening of the entire array of Solombala, but not less than 1.0 to 1.5 months after dumping salt in the dump, in the hottest and driest period of its surface covered with a layer of clay-salt slurry remaining after enrichment of sylvinite ores on gallerycheck factories, of a thickness of 10-20 mm by gunning Yes the NYM sludge surface Solombala, when this sludge in suspension is fed into a hopper of pneumonias when the ratio of the solid and liquid phases from 1:2 to 1:3.



 

Same patents:

FIELD: mining industry, particularly for co-developing salt and platinum deposits.

SUBSTANCE: method involves detecting presence of platinum in non-soluble salt residue salt during salt deposit development; performing geological mapping of salt-bearing cavity and determining sand distribution in stratum above salt layer; drilling wells and bore pits and taking samples to determine platinum content; contouring sand deposits bearing platinum with concentration suitable for industrial development; cleaning surface; blocking out and excavating platinum-bearing sand; directing above sand to gravity separation plant; tying thereof with water in gravity separation plant to separate platinum therefrom.

EFFECT: increased complexity of deposit development.

FIELD: mining industry, particularly to develop watered placer deposits and technological mineral deposits under permanent negative temperatures of ambient air.

SUBSTANCE: method involves performing preparation and production works, mineral processing and refuse stacking operations. To implement above method dam is built around mining equipment and deposit to be developed prior to air temperature reduction to negative value; installing sled-mounted hangar having transparent heat insulated roof over the dam and performing all above mentioned works and operations inside the hangar.

EFFECT: increased efficiency of production and processing equipment.

2 cl, 1 ex

FIELD: mining industry, as well as hydraulic, road, agriculture and other building, particularly to perform open cast mining and other woks by rock loosening.

SUBSTANCE: method involves obtaining information concerning main and structural-and-strength rock properties on the base of estimation of data of primary and post-authorization prospecting, as well as production prospecting; detailed rock zoning to separate production blocks and unit blocks characterized by uniform rock at borders thereof; writing computer program; automatically loosing rock of each unit block by most effective method, namely by mechanical, pneumatic, blast drilling or physical one performed with the use of all-purpose mobile rig tools. Above rig includes computer system, device provided with one, two or three replaceable teeth, with plate-like metal pins and with hydraulic cylinders. The rig also has device adapted to create holes in unit block and wedge out thereof, drilling device and charging device, laser charge initiation system, local shelter with damping means, device for rock cutting by applying pressurized air and impacts to rock and auxiliary excavation device.

EFFECT: increased efficiency of rock preparation for further cutting and loading and for solid mineral field development as a whole.

1 dwg

FIELD: mining industry, particularly for open-cut steeply dipping or inclined deposit development.

SUBSTANCE: method involves excavating pit up to design depth reaching by sliced benches; moving the benches as ore deposit is developed; cutting ore and debris; loading thereof on conveyance means to move ore to ground surface, wherein as pit is deepened conveyer systems are used; on reaching the design pit depth deposit is divided into slices and the slices are developed with minimal ore losses in triangular zones with negligible interaction in peripheral face by developed slot raise technology usage; reinforcing slopes with anchors and metal mesh at deep horizons where berm cleaning is difficult; performing slice cutting though the full ore body thickness at design pit bottom and conveying the cut ore to surface by steeply inclined conveyers and combined transportation means. In the case of ore development in slices having lesser thickness below pit bottom steeply dipping and vertical side part are built, concrete wall and metal mesh adapted to hold wedge-like lumps in the presence of potential caving, wherein in this case mining equipment is used and ore cut from underground layer is crushed in crushing mills located on main loading and transportation horizons and delivered to ground surface by conveyer or skip shaft. Mined-out space is filled with rock refuse at terminal stage.

EFFECT: increased efficiency of mineral extraction, reduced cost of deposit development.

8 dwg, 1 ex

FIELD: mining industry.

SUBSTANCE: device has screw, having transporting spiral ribbon held on the shaft. Equipment is provided with U-shaped chute and perforated drum with armature in form of screw ribbon, having curvilinear shape in cross-section, arched in the direction of movement. Drum is mounted in upper portion of U-shaped chute. In its lower portion a screw is mounted.

EFFECT: higher productiveness.

3 dwg

The invention relates to a device for transporting bulk and bulk cargoes have been presented, namely to cable scrapers, and can be used for the development of fluvial gravel deposits of diamonds, for example, in Angola

The invention relates to the mining industry and can be used in the development of ore, gravel, coal, oil-shale deposits of construction rocks, construction materials and some other solid minerals

The invention relates to a device for transporting bulk and bulk cargoes have been presented, namely to cable scrapers, and can be used for the development of fluvial gravel deposits of diamonds, for example, in Angola
The invention relates to methods for development of mineral deposits and can be used to create the mining and tunneling machines for surface and underground development

The invention relates to the mining industry, in particular to the development of irrigated alluvial deposits of minerals and man-made accumulations of mineral raw materials under conditions of continuous negative air temperatures

FIELD: mining industry.

SUBSTANCE: device has screw, having transporting spiral ribbon held on the shaft. Equipment is provided with U-shaped chute and perforated drum with armature in form of screw ribbon, having curvilinear shape in cross-section, arched in the direction of movement. Drum is mounted in upper portion of U-shaped chute. In its lower portion a screw is mounted.

EFFECT: higher productiveness.

3 dwg

FIELD: mining industry, particularly for open-cut steeply dipping or inclined deposit development.

SUBSTANCE: method involves excavating pit up to design depth reaching by sliced benches; moving the benches as ore deposit is developed; cutting ore and debris; loading thereof on conveyance means to move ore to ground surface, wherein as pit is deepened conveyer systems are used; on reaching the design pit depth deposit is divided into slices and the slices are developed with minimal ore losses in triangular zones with negligible interaction in peripheral face by developed slot raise technology usage; reinforcing slopes with anchors and metal mesh at deep horizons where berm cleaning is difficult; performing slice cutting though the full ore body thickness at design pit bottom and conveying the cut ore to surface by steeply inclined conveyers and combined transportation means. In the case of ore development in slices having lesser thickness below pit bottom steeply dipping and vertical side part are built, concrete wall and metal mesh adapted to hold wedge-like lumps in the presence of potential caving, wherein in this case mining equipment is used and ore cut from underground layer is crushed in crushing mills located on main loading and transportation horizons and delivered to ground surface by conveyer or skip shaft. Mined-out space is filled with rock refuse at terminal stage.

EFFECT: increased efficiency of mineral extraction, reduced cost of deposit development.

8 dwg, 1 ex

FIELD: mining industry, as well as hydraulic, road, agriculture and other building, particularly to perform open cast mining and other woks by rock loosening.

SUBSTANCE: method involves obtaining information concerning main and structural-and-strength rock properties on the base of estimation of data of primary and post-authorization prospecting, as well as production prospecting; detailed rock zoning to separate production blocks and unit blocks characterized by uniform rock at borders thereof; writing computer program; automatically loosing rock of each unit block by most effective method, namely by mechanical, pneumatic, blast drilling or physical one performed with the use of all-purpose mobile rig tools. Above rig includes computer system, device provided with one, two or three replaceable teeth, with plate-like metal pins and with hydraulic cylinders. The rig also has device adapted to create holes in unit block and wedge out thereof, drilling device and charging device, laser charge initiation system, local shelter with damping means, device for rock cutting by applying pressurized air and impacts to rock and auxiliary excavation device.

EFFECT: increased efficiency of rock preparation for further cutting and loading and for solid mineral field development as a whole.

1 dwg

FIELD: mining industry, particularly to develop watered placer deposits and technological mineral deposits under permanent negative temperatures of ambient air.

SUBSTANCE: method involves performing preparation and production works, mineral processing and refuse stacking operations. To implement above method dam is built around mining equipment and deposit to be developed prior to air temperature reduction to negative value; installing sled-mounted hangar having transparent heat insulated roof over the dam and performing all above mentioned works and operations inside the hangar.

EFFECT: increased efficiency of production and processing equipment.

2 cl, 1 ex

FIELD: mining industry, particularly for co-developing salt and platinum deposits.

SUBSTANCE: method involves detecting presence of platinum in non-soluble salt residue salt during salt deposit development; performing geological mapping of salt-bearing cavity and determining sand distribution in stratum above salt layer; drilling wells and bore pits and taking samples to determine platinum content; contouring sand deposits bearing platinum with concentration suitable for industrial development; cleaning surface; blocking out and excavating platinum-bearing sand; directing above sand to gravity separation plant; tying thereof with water in gravity separation plant to separate platinum therefrom.

EFFECT: increased complexity of deposit development.

FIELD: methods of surface mining, particularly for following natural stone treatment by covering or impregnating thereof with liquid or other flowable substances on surface.

SUBSTANCE: method involves gunning salt pit surface with waterproofing agent; covering salt pile surface with clay-and-salt mud layer in dry and hot season after salt pile hardening in at least 1.0-1.5 months after pile filling with salt. The clay-and-salt mud is sylvinite ore-dressing waste obtained from chemical factory. The clay-and-salt mud layer has 10-20 mm thickness and is formed by gunning salt pile surface with above mud material. The clay-and-salt mud is supplied into pneumatic pump receiver, wherein solid/liquid phase ratio is 1:2 - 1:3.

EFFECT: increased efficiency of salt pile waterproofing.

FIELD: agricultural; devices for treatment.

SUBSTANCE: the invention is pertaining to the field of clarification of water at the industrial development of the placer deposits with utilization of the wastes of the timber loggings and extraction of the finely dispersed gold from the water runoffs of the gold mining. In the bed of the diversion channel they form the firebreak out of the filtering material containing the wood sawdust mass subjected to the preliminary sorting at the vibration installation and having the ratio of the fractions from 1 to 5 mm up to the fraction from 5 up to 15 mm as 1:3 and packaged in the netted forms made out of the wire skeleton. After the water clarification the wood sawdust mass is subjected to dehydration by pressing and to drying and incineration for extraction of the fine fractions of gold. The technical result of the invention is the increased efficiency of the water clarification and extraction of gold.

EFFECT: the invention ensures the increased efficiency of the water clarification and extraction of gold.

1 dwg

FIELD: mining industry, possible use during extraction of natural and man-made gravel deposits of both mineral resources of high density (gold, platinum, etc), and valued minerals of low density.

SUBSTANCE: method for softening and disintegration of argillaceous sands of gravel deposits includes driving a water-feeding trench, driving a water-collecting trench in 80-100 meters along direction of fall of deposit bed in parallel to water-feeding trench, depth of water-collecting trench providing for difference of bottom levels in trenches 1,5-3 meters, filling water-feeding trench with water and recharging it to maintain constant water level by means of gate and spillway with raised spillway gate, building walling dam 1-1,5 meters high, limiting the part of deposit being processed in plan, with spillway, after that outputs of filtration flow into water-collecting trench are constructed which are fixed by wetting of upper slope for height of 1-2 meters, then spillway gate is lowered onto spillway spine, and that part of deposit is flooded with water for depth of 0,8-1,3 meters and this level is maintained for initial softening of argillaceous sands of gravel deposits, after that dredger plant is assembled, consisting of suck-in line with suction device, dredger itself and force sludge duct. At the end of force sludge duct, vortex generator is mounted together with hydrodynamic cavitator, due to which during launch of operation of dredger plant argillaceous sands of gravel deposits along the way from face and suction device of dredger to hydrodynamic cavitator are subjected to second stage of softening and disintegration, and in hydrodynamic cavitator - to third-stage final disintegration, and then are dispatched to dressing plant.

EFFECT: increased productiveness and extraction efficiency during extraction of natural and man-made gravel deposits due to efficient softening and disintegration of argillaceous sands of gravel deposits and release of valued components during hydro-transportation of sands to dressing equipment.

2 dwg

FIELD: mining industry.

SUBSTANCE: said geotechnological complex incorporates a trestle with a tumbling bucket, a tumbling module with a chute located inside the closed loop of trench for disintegrated rock accumulation. The chute is directed along the rock inflow. The tumbling bucket installation provides for possibility of linear and angular displacement in the vertical plane; the bucket has slots and L-shaped rippers.

EFFECT: improved efficiency of mining due to intensification of disintegration of rock with complex physical and mechanical properties during dredging and placer mining.

5 dwg

FIELD: mining industry.

SUBSTANCE: said complex is provided with a supported trestle and an ultrasonic and mechanical tumbling module. Rotatable ultrasonic radiation module is connected to movable carriage rim by means of a hub and sliding supports. The movable carriage is provided with a drive for moving it along the trestle cross beam and a drive for turning the ultrasonic radiation module around the movable carriage yoke axis. The rotatable ultrasonic radiation module has drives for moving the ultrasonic sources in the vertical plane, a dual drive for moving the ultrasonic sources in horizontal plane, sensors to determine the rock physical and mechanical state, and communication links with functional module of disintegration process automatic control system.

EFFECT: improved efficiency of mining due to intensification of disintegration of rock with complex physical and mechanical properties during dredging and placer mining.

2 dwg