Method for pile installation in guiding means of marine platform base

FIELD: marine hydraulic structures, particularly fixed marine oil and gas production platforms.

SUBSTANCE: method for pile installation with the use of handling machine involves driving each pile in conical hole made in guiding means fixedly secured to marine platform base; installing pile and guiding means in coaxial position by guiding device having body installed on guiding members of the base so that the body may be displaced and fixed in predetermined position; lowering pile to working position; installing guiding device above water level on guiding members of platform base in predetermined position, wherein the guiding device is made as cylindrical body part and cylindrical part of guiding member secured one to another and having crossing axes so that cylindrical part of guiding means and cylindrical part of guiding member of guiding device are brought into coaxial state by corresponding linear and angular guiding member displacement; securing guiding device body with guiding members of platform base.

EFFECT: extended technological capabilities and simplified method of pile installation in working position.

5 cl, 4 dwg

 

The invention relates to the field of construction of marine engineering, namely for the construction of fixed offshore oil and gas platforms.

Known technical solution, in which the piles before dipping them into the ground oriented in the direction of driving, at least two alignment nodes placed directly on the unit for the driving of piles, which are connected with the main load-bearing elements of the unit swivel (A.S. USSR № 751904, CL E 02 D 7/06, publ. 30.07.80).

This solution is not intended for use in marine conditions, because it provides the means of solving the problem coaxial arrangement of piles and direction during the installation of piles in marine environments.

It is also known technical solution which allows you to install piles in water conditions (A.S. USSR № 796313, CL E 02 D 7/00, publ. 15.01.81), however, it also does not contain tools to simplify axial location of the piles and the guide or conductor when howling pile guides of the base of the marine environment, resulting in more overhead.

The closest to the invention is a method of installation of piles in directing the Foundation of an offshore platform, wherein the lifting vehicle every pile is slid in the cone of the guide, as the TKO associated with the base of the marine platform, while using the guide device, the casing of which is mounted on the guide member base with the ability to be moved and fixed in a predetermined position, carry out axial position of the guide piles and piles down the pile to ensure the operating position (As the USSR № 1656070, CL E 02 In 17/00, publ. 15.06.91).

Known technical solution is quite complex, requires a large amount of work in the manufacture of assistive devices in the shop or on the Assembly site, does not exclude large labor and loss of time during the installation of piles. The location of the sending device under water creates difficulties when it is used in the process. In addition, it is intended for use in special designs, offshore platforms, i.e. is not universal.

The objective of the proposed technical solution is the expansion of technological capabilities and simplify the installation of piles into position.

This goal is achieved by the fact that implemented method of installation of piles in directing the Foundation of an offshore platform, wherein the lifting vehicle every pile is slid in the cone guide rigidly connected with the base of the marine platform, with the guide device, cor is the condition which is mounted on the guide member base with the ability to be moved and fixed in a predetermined position, carry out axial position of the guide piles and piles down the pile to ensure the operating position, and a guiding device installed in the surface position on the guide member of the platform base in a predetermined position and are in the form of rigidly interconnected and intersecting the axis of the cylindrical part of the housing and the cylindrical part of the guide element, provide axial position of the cylindrical part of the guide for the piles of the platform base and the cylindrical part of the guide element of the guide device by the corresponding linear and angular movement of the latter, then rigidly connecting the body of the sending unit with the guide elements of the platform base.

In addition, as guide elements for the installation of the sending device using pipe elements are the Foundation of the offshore platform.

Mainly on the respective tubular guide member base of an offshore platform install two guide devices, the cylindrical part of the guide elements which are placed in alignment with one another and the respective guide piles of the platform base, the winding of the pile is carried out by its vertical movement by means of a lifting-transport environments is TBA.

In a preferred variant of the method in the guide device perform homoeopathie cylindrical part of the housing and the cylindrical part of the guide element, while the pile is slid by horizontal and/or vertical movements by means of lifting the vehicle on the stationary part homoeopathica guide element, which is in the open state, and after winding the freedom of movement of the pile restrict rigid connection of the rotating part homoeopathica guide element with a fixed part within preassigned gap.

In one embodiment, execution of the method on the corresponding tubular guide member base of an offshore platform install two guide devices, which carry homoeopathie cylindrical part of the hull and the cylindrical part of the guide elements, having first get homoeopathie guide elements of the guide device on the pile and rigidly associated with it with respect to the distance between them corresponding to the distance between the tubular guide elements of the platform base, the lifting vehicles move together and secure using homoeopathic buildings vanes to the respective pipe e.g. the engaged elements of the platform base, then between the guide elements of the guide device and the pile to provide in advance a specified gap.

The invention is illustrated by the drawings, is shown in Fig. 1 to 4, where Fig. 1 shows a diagram of installation of the guide device and the winding of the piles by means of its vertical movement, Fig. 2 shows a diagram of the winding of the piles by means of its horizontal movement, Fig. 3 is a perspective view of a variant of the constructive execution of the sending device of Fig. 4 is a top view in Fig. 3.

Technological complex (Fig. 1 and Fig. 2) for implementing the method includes the base 1 offshore platforms and floating lifting the vehicle 2. The base 1 offshore platform contains strictly related guides 3 for piles 4 and the auxiliary guiding device 5 mounted on the tube elements 6, which are used as guide elements for guiding devices 5.

A guiding device 5 (Fig. 3 and Fig. 4) consists of a body 7 having a cylindrical part 8 and the guide element consisting of a cylindrical part 9 and a conical collar 10, which is rigidly connected with the connecting element 11. Using the ball joint housing 7 are connected to respective rotary elements of the clamps 13 and 14, which have the ability rigid connection with the case 7 soo the respective connecting elements 15. When the clamp 13 is designed for hard coverage of tubular guide elements 6 and the yoke 14 for coverage piles 4 with pre-specified gap.

In one embodiment, namely, when the winding of the piles 4 above, the cylindrical part 9 and the tapered collar 10 can be made permanent, i.e. may be missing the hinge 12 and the fastening element 15 (Fig. 3 and Fig. 4).

The proposed method of installation of piles in directing the Foundation of the offshore platform is implemented as follows.

Using floating hoisting means 2 each pile 4 is slid in the cone of the guide 3, is rigidly connected with the base 1 offshore platform. While using the guide device 5, the housing 7 which is mounted on the guide member 6 of the base 1 with the ability to be moved and fixed in a predetermined position, carry out the coaxial position of the guide 3 for piles and piles 4, lower pile 4 to ensure the operating position.

Moreover, the guiding device 5 is installed in the surface position on the guide member 6 of the base 1 platform in a predetermined position.

A guiding device 5 is performed in the form of rigidly interconnected and intersecting the axis of the cylindrical part 8 of the housing 7 and the cylindrical part 9 of the guide element, provide axial position of the cylindrical h the STI guide 3 for piles 4 of the base 1 of the platform and the cylindrical part 9 of the guide element of the guide device 5 by the corresponding linear and angular movement of the latter, then rigidly connected to the housing 7 of the guide device 5 with the guide elements 6 of the base 1 of the platform.

As guide elements for the installation guide 5 using pipe elements 6 of the base 1 offshore platform.

On the respective tubular guide member 6 of the base 1 offshore platform install two guide devices 5, the cylindrical part 9 of the guide elements are placed in alignment with one another and the respective guide 3 for piles 4 of the base 1 platform, while the winding of the pile 4 is carried out by its vertical movement by means of lifting the vehicle 2.

In a preferred embodiment, in the guiding device 5 performs homoeopathie cylindrical part 8 of the housing 7 and the cylindrical part 9 of the guide element, the pile 4 is slid by horizontal and/or vertical movements by means of lifting the vehicle 2 on the stationary cylindrical part 9 homoeopathica guide element, which is in the open state, and after winding the freedom of movement of the piles 4 restrict the rigid connection of the rotating part homoeopathica guide element clamp 14 with a fixed cylindrical portion 9 within preassigned gap.

One prob is mportant variants of the method previously get homoeopathie guide elements of the guide device 5 on pile 4 and rigidly connected with this with respect to the distance between them, corresponding to the distance between the tubular guide elements 6 of the base 1 platform. Then, the lift of the vehicle 2 move together and secure using homoeopathic housings 7 of the guide device 5 to the corresponding tubular guide elements 6 of the base 1 of the platform and then between the guide elements of the guide device 5 and the pile 4 provide in advance a specified gap. Pile 4 using the guide device 5 is lowered along the guide rails 3 to the preset position, then secure to the ground in a known manner, for example cement.

The proposed solution allows to increase efficiency and reduce labor costs in the construction of offshore platforms.

1. The method of installation of piles in directing the Foundation of an offshore platform, wherein the lifting vehicle every pile is slid in the cone guide rigidly connected with the base of the marine platform, with the guide device, the casing of which is mounted on the guide member base with the ability to be moved and fixed in a predetermined position, carry out axial position of the guide piles and piles down the pile to ensure the operating position, characterized in that the guiding device is installed in the surface p is the position on the guide member of the platform base in a predetermined position and are in the form of rigidly interconnected and having intersecting the axis of the cylindrical part of the housing and the cylindrical part of the guide item, provide axial position of the cylindrical part of the guide for the piles of the platform base and the cylindrical part of the guide element of the guide device by the corresponding linear and angular movement of the latter, then rigidly connecting the body of the sending unit with the guide elements of the platform base.

2. The method according to p. 1, characterized in that as guide elements for the installation of the sending device using pipe elements are the Foundation of the offshore platform.

3. The method according to p. 2, characterized in that the respective tubular guide member base of an offshore platform install two guide devices, the cylindrical part of the guide elements which are placed in alignment with one another and the respective guide piles of the platform base, the winding of the pile is carried out by its vertical movement by means of lifting the vehicle.

4. The method according to p. 1, characterized in that the guiding device perform homoeopathie cylindrical part of the housing and the cylindrical part of the guide element, while the pile is slid by horizontal and/or vertical movements by means of lifting the vehicle on the stationary part homoeopathica send the element, in the open state, and after winding the freedom of movement of the pile restrict rigid connection of the rotating part homoeopathica guide element with a fixed part within preassigned gap.

5. The method according to p. 2, characterized in that the respective tubular guide member base of an offshore platform install two guide devices, which carry homoeopathie cylindrical part of the hull and the cylindrical part of the guide elements, having first get homoeopathie guide elements of the guide device on the pile and rigidly associated with it with respect to the distance between them corresponding to the distance between the tubular guide elements of the platform base, the lifting vehicles move together and secure using homoeopathic buildings vanes to the corresponding tubular guide elements of the platform base, and then between the guide elements of the guide device and the pile provide in advance a specified gap.



 

Same patents:

FIELD: ground hydraulic structure erection, particularly to decontaminate silt or bottom sediments in water bodies.

SUBSTANCE: method involves building protective dam along perimeter of silt and/or bottom sediment area to be protected; laying waterproofing layer along inner dam perimeter, wherein waterproofing layer height is 2 times as much as silt and/or bottom sediment layer; forming artificial ground massif of watertight ecologically friendly natural ground in water area inside the dam, wherein artificial ground massif thickness is equal to at least three thicknesses of silt and/or bottom sediment layer; forming above-water relief area having 2.5 m height over water surface; forming surface flow discharge system and planting greenery in artificial ground massif.

EFFECT: increased reliability, reduced contamination concentration, prevention of hazardous substances ingress in ambient space and improved ecological safety.

2 cl, 1 dwg

FIELD: offshore oil-field hydraulic structures, namely for building fixed platforms.

SUBSTANCE: method for forming support substructure by welding large blocks involves producing and serially connecting precast members to create flat units, namely panels and diaphragms; connecting flat units by tubular inserts and tubular links to create three-dimensional latticed structure. All operations are divided into four stages in accordance with technological order. The first stage includes forming tubular links and tubular inserts, pile sections and marine riser sections. The second stage includes assemblage of flat panels and diaphragms in horizontal position on corresponding mats. The third and the forth stages include simultaneous installation of flat panels and diaphragms and rigid connection thereof.

EFFECT: reduced labor inputs, time and cost for assembly work performing due to elimination of complicated tubular joints used as assembly units.

3 cl, 7 dwg

FIELD: offshore oil-field hydraulic structures, namely for building fixed platforms.

SUBSTANCE: support substructure comprises three-dimensional latticed structure having prismatic shape and composed of tubular members. The structure has vertical panels with posts, cross-pieces, struts and horizontal diaphragms connected one to another. Horizontal diaphragms have guiding nets for marine risers. The structure is secured to ground by main piles arranged in vertical posts and by foundation having additional piles, which is rigidly connected to tubular members of side edges of above structure. The structure is provided with ice-protection means formed as two truncated prisms of sheet steel and having beveled side ribs rigidly connected one to another by major bases. Marine risers are arranged inside prisms. Each prism of ice-protection means is rigidly connected with tubular members of corresponding diaphragms of three-dimensional latticed structure.

EFFECT: increased resistance to wave, seismic and ice loads, improved manufacturability and, as a result, reduced cost of permanent offshore structure building.

3 cl, 2 dwg

FIELD: hydraulic engineering, particularly underwater structures adapted for oil and gas well operation, preferably on shallow continental shelf having bottom covered with thick silt layer and in ice-covered period.

SUBSTANCE: platform comprises base, vertical pile holders connected with the base and positioning unit for drilling string and well-control equipment fixation. Base is formed as a structure with cavities filled with ballast. The structure is composed of hollow members and functionally divided into two areas. Positioning unit is arranged in the first area, another area including catching opening. Platform is additionally provided with removable mounting frame with production equipment installed on the frame. Arranged in lower frame part are inclined guiding means to provide access into catching opening during mounting frame connection with support platform base in underwater position.

EFFECT: reduced labor inputs for production equipment mounting and maintenance, increased reliability.

7 dwg

FIELD: production of ice.

SUBSTANCE: method comprises producing a hollow near the ship's side, delivering air under the ice cover, the air volume does not exceeding the volume of the space defined by ice covering from the top, water from the bottom, and ice walls from the sides over the contour of the future hollow. The walls are frozen from top to bottom by means of direct nonseparable heat exchangers mounted in advance into the covering immediately behind the contour up to the bottom of the future hollow. The delivery stops and the bottom of the future hollow is frozen with the use of L-shaped nonseparable heat exchangers set into the covering simultaneously with the direct heat exchangers. As a result, a closed space is defined, which is stripped, and ice blocks are removed.

EFFECT: enhanced efficiency.

FIELD: hydraulic engineering, particularly for forming temporary structures for enclosing closed in plane water area bottom part and space above the bottom part through the full water thickness.

SUBSTANCE: method of shallow tunnel construction involves forming structure enclosing closed in plane bottom part; removing water from the structure; performing works in dry structure and demounting above structure. Method of enclosing structure forming involves producing bottomless hydraulic enclosure with controlled floatability; transporting and moving thereof to tunnel path; immersing the enclosure in water up to reaching water area bottom by reducing floatability thereof and fixing enclosure with fastening means and anchor system; leveling upper enclosure part with horizon line and arranging cranage and platforms for building material storage on upper enclosure part; erecting cutoff walls inside space defined by enclosure; removing water from the enclosure; developing bottom ground by trench digging; constructing pile tunnel base; building foundation grill on pile tunnel base; locating composite or precast reinforced concrete tunnel sections on foundation grill; recovering initial floatability of the enclosure. Enclosure structure has movable fastening means formed as blades along vertical walls thereof.

EFFECT: increased tunnel reliability, reduced time of erection thereof.

4 cl, 4 dwg

FIELD: stationary sea oil platforms.

SUBSTANCE: block has underwater support, made in form of two-level bench, formed by vertical beam cases and horizontal links, and also has support columns, connected to support. Horizontal links of bench are made in form of floating tanks, while links, placed along perimeter of lower level of bench, are separated by water-impenetrable walls on sections, provided with ballasting means. Method for mounting support block at the bottom of continental shelf includes transporting, ballasting of floating tanks and fixing support block at the bottom of water body. Support block is transported into wells drilling zone in planned position, sections of floating tanks are ballasted until lower level of support lowers into bottom of water body for 0.3-0.7 of its height, different and slants are evened and holding beams are inserted into cases of support with their following forcing into hard bottom portion and fixing in cases. Ballasting of sections of floating tanks and forcing of holding beams can be performed in pairs in diagonal planes relatively to center of lower level of support.

EFFECT: simplified assemblage, higher reliability.

2 cl, 12 dwg

FIELD: hydraulic engineering, particularly building bases and foundations, namely bridge piers, in water.

SUBSTANCE: method involves monitoring water obstacle in support building place, including investigating water parameters, recording water level in the course of year, determining floor shape, investigating floor ground, influence of outer disturbing forces and calculating weight and dimensions of support foundation case on the base of above parameters; producing hollow case with several cavities; moving case to installation place; submerging case in water; pacing thereof on floor; fixing case by piles and smoothing floor. Case submerging and placing operations are performed simultaneously with stabilizing vertical case position by performing control and filling of corresponding cavities. Bottom smoothing process is carried out by forcing artificial material, such as concrete layers with crushed stone interlayers, under case bottom. During case placing case is secured by blades built in case bottom and by piles inserted in cavities. Correspondence between case weight, number of blades, head resistance and side friction thereof for particular ground is determined to provide case stability on ground. Upper edge of submerged case is located above maximum possible water wave height. Rock fill is formed around underwater case part.

EFFECT: reduced time of support erection, increased reliability and stability, safety and service life, reduced labor inputs, possibility to erect supports in Arctic basin.

3 cl 1 ex

The invention relates to the development of underwater mineral deposits, namely for the construction of technological systems, which provide carrying out maintenance work on the shelf of the open sea

The invention relates to the field of drilling offshore, in particular to methods of installation drilling monoatomic reason, stabilize them on the bottom and dismantling

FIELD: hydraulic engineering, particularly building bases and foundations, namely bridge piers, in water.

SUBSTANCE: method involves monitoring water obstacle in support building place, including investigating water parameters, recording water level in the course of year, determining floor shape, investigating floor ground, influence of outer disturbing forces and calculating weight and dimensions of support foundation case on the base of above parameters; producing hollow case with several cavities; moving case to installation place; submerging case in water; pacing thereof on floor; fixing case by piles and smoothing floor. Case submerging and placing operations are performed simultaneously with stabilizing vertical case position by performing control and filling of corresponding cavities. Bottom smoothing process is carried out by forcing artificial material, such as concrete layers with crushed stone interlayers, under case bottom. During case placing case is secured by blades built in case bottom and by piles inserted in cavities. Correspondence between case weight, number of blades, head resistance and side friction thereof for particular ground is determined to provide case stability on ground. Upper edge of submerged case is located above maximum possible water wave height. Rock fill is formed around underwater case part.

EFFECT: reduced time of support erection, increased reliability and stability, safety and service life, reduced labor inputs, possibility to erect supports in Arctic basin.

3 cl 1 ex

FIELD: stationary sea oil platforms.

SUBSTANCE: block has underwater support, made in form of two-level bench, formed by vertical beam cases and horizontal links, and also has support columns, connected to support. Horizontal links of bench are made in form of floating tanks, while links, placed along perimeter of lower level of bench, are separated by water-impenetrable walls on sections, provided with ballasting means. Method for mounting support block at the bottom of continental shelf includes transporting, ballasting of floating tanks and fixing support block at the bottom of water body. Support block is transported into wells drilling zone in planned position, sections of floating tanks are ballasted until lower level of support lowers into bottom of water body for 0.3-0.7 of its height, different and slants are evened and holding beams are inserted into cases of support with their following forcing into hard bottom portion and fixing in cases. Ballasting of sections of floating tanks and forcing of holding beams can be performed in pairs in diagonal planes relatively to center of lower level of support.

EFFECT: simplified assemblage, higher reliability.

2 cl, 12 dwg

FIELD: hydraulic engineering, particularly for forming temporary structures for enclosing closed in plane water area bottom part and space above the bottom part through the full water thickness.

SUBSTANCE: method of shallow tunnel construction involves forming structure enclosing closed in plane bottom part; removing water from the structure; performing works in dry structure and demounting above structure. Method of enclosing structure forming involves producing bottomless hydraulic enclosure with controlled floatability; transporting and moving thereof to tunnel path; immersing the enclosure in water up to reaching water area bottom by reducing floatability thereof and fixing enclosure with fastening means and anchor system; leveling upper enclosure part with horizon line and arranging cranage and platforms for building material storage on upper enclosure part; erecting cutoff walls inside space defined by enclosure; removing water from the enclosure; developing bottom ground by trench digging; constructing pile tunnel base; building foundation grill on pile tunnel base; locating composite or precast reinforced concrete tunnel sections on foundation grill; recovering initial floatability of the enclosure. Enclosure structure has movable fastening means formed as blades along vertical walls thereof.

EFFECT: increased tunnel reliability, reduced time of erection thereof.

4 cl, 4 dwg

FIELD: production of ice.

SUBSTANCE: method comprises producing a hollow near the ship's side, delivering air under the ice cover, the air volume does not exceeding the volume of the space defined by ice covering from the top, water from the bottom, and ice walls from the sides over the contour of the future hollow. The walls are frozen from top to bottom by means of direct nonseparable heat exchangers mounted in advance into the covering immediately behind the contour up to the bottom of the future hollow. The delivery stops and the bottom of the future hollow is frozen with the use of L-shaped nonseparable heat exchangers set into the covering simultaneously with the direct heat exchangers. As a result, a closed space is defined, which is stripped, and ice blocks are removed.

EFFECT: enhanced efficiency.

FIELD: hydraulic engineering, particularly underwater structures adapted for oil and gas well operation, preferably on shallow continental shelf having bottom covered with thick silt layer and in ice-covered period.

SUBSTANCE: platform comprises base, vertical pile holders connected with the base and positioning unit for drilling string and well-control equipment fixation. Base is formed as a structure with cavities filled with ballast. The structure is composed of hollow members and functionally divided into two areas. Positioning unit is arranged in the first area, another area including catching opening. Platform is additionally provided with removable mounting frame with production equipment installed on the frame. Arranged in lower frame part are inclined guiding means to provide access into catching opening during mounting frame connection with support platform base in underwater position.

EFFECT: reduced labor inputs for production equipment mounting and maintenance, increased reliability.

7 dwg

FIELD: offshore oil-field hydraulic structures, namely for building fixed platforms.

SUBSTANCE: support substructure comprises three-dimensional latticed structure having prismatic shape and composed of tubular members. The structure has vertical panels with posts, cross-pieces, struts and horizontal diaphragms connected one to another. Horizontal diaphragms have guiding nets for marine risers. The structure is secured to ground by main piles arranged in vertical posts and by foundation having additional piles, which is rigidly connected to tubular members of side edges of above structure. The structure is provided with ice-protection means formed as two truncated prisms of sheet steel and having beveled side ribs rigidly connected one to another by major bases. Marine risers are arranged inside prisms. Each prism of ice-protection means is rigidly connected with tubular members of corresponding diaphragms of three-dimensional latticed structure.

EFFECT: increased resistance to wave, seismic and ice loads, improved manufacturability and, as a result, reduced cost of permanent offshore structure building.

3 cl, 2 dwg

FIELD: offshore oil-field hydraulic structures, namely for building fixed platforms.

SUBSTANCE: method for forming support substructure by welding large blocks involves producing and serially connecting precast members to create flat units, namely panels and diaphragms; connecting flat units by tubular inserts and tubular links to create three-dimensional latticed structure. All operations are divided into four stages in accordance with technological order. The first stage includes forming tubular links and tubular inserts, pile sections and marine riser sections. The second stage includes assemblage of flat panels and diaphragms in horizontal position on corresponding mats. The third and the forth stages include simultaneous installation of flat panels and diaphragms and rigid connection thereof.

EFFECT: reduced labor inputs, time and cost for assembly work performing due to elimination of complicated tubular joints used as assembly units.

3 cl, 7 dwg

FIELD: ground hydraulic structure erection, particularly to decontaminate silt or bottom sediments in water bodies.

SUBSTANCE: method involves building protective dam along perimeter of silt and/or bottom sediment area to be protected; laying waterproofing layer along inner dam perimeter, wherein waterproofing layer height is 2 times as much as silt and/or bottom sediment layer; forming artificial ground massif of watertight ecologically friendly natural ground in water area inside the dam, wherein artificial ground massif thickness is equal to at least three thicknesses of silt and/or bottom sediment layer; forming above-water relief area having 2.5 m height over water surface; forming surface flow discharge system and planting greenery in artificial ground massif.

EFFECT: increased reliability, reduced contamination concentration, prevention of hazardous substances ingress in ambient space and improved ecological safety.

2 cl, 1 dwg

FIELD: marine hydraulic structures, particularly fixed marine oil and gas production platforms.

SUBSTANCE: method for pile installation with the use of handling machine involves driving each pile in conical hole made in guiding means fixedly secured to marine platform base; installing pile and guiding means in coaxial position by guiding device having body installed on guiding members of the base so that the body may be displaced and fixed in predetermined position; lowering pile to working position; installing guiding device above water level on guiding members of platform base in predetermined position, wherein the guiding device is made as cylindrical body part and cylindrical part of guiding member secured one to another and having crossing axes so that cylindrical part of guiding means and cylindrical part of guiding member of guiding device are brought into coaxial state by corresponding linear and angular guiding member displacement; securing guiding device body with guiding members of platform base.

EFFECT: extended technological capabilities and simplified method of pile installation in working position.

5 cl, 4 dwg

FIELD: marine oil production hydraulic structure building, particularly marine platform assemblage.

SUBSTANCE: method involves forming assembly units, namely support unit, load-bearing deck and block units of upper structure, at subassembly site; docking floating vehicle to subassembly site; serially installing assembling units on stockpile carts; moving assembly units from subassembly site to floating vehicle with the use of above stockpile carts; transporting thereof to assemblage site and performing successive mounting thereof with the use of crane-and-mounting ships. The successive mounting operation involves installing support unit on previously prepared ground; installing piles in corresponding bell-shaped guiders of the support unit; driving the piles and cementing thereof to create pile foundation; arranging load-bearing deck on struts and installation guiding bars having different heights and previously formed on support unit, wherein the load-bearing deck has seats for struts and bars receiving and connection thereof is carried out by successive alignment of above bars and seats.

EFFECT: increased efficiency of building equipment and floating vehicle usage; reduced building time, decreased number of operations to be performed at sea, reduced labor inputs and decreased costs of marine fixed platform building.

7 cl, 17 dwg