Method and system for shallow tunnel construction on bottom of water area

FIELD: hydraulic engineering, particularly for forming temporary structures for enclosing closed in plane water area bottom part and space above the bottom part through the full water thickness.

SUBSTANCE: method of shallow tunnel construction involves forming structure enclosing closed in plane bottom part; removing water from the structure; performing works in dry structure and demounting above structure. Method of enclosing structure forming involves producing bottomless hydraulic enclosure with controlled floatability; transporting and moving thereof to tunnel path; immersing the enclosure in water up to reaching water area bottom by reducing floatability thereof and fixing enclosure with fastening means and anchor system; leveling upper enclosure part with horizon line and arranging cranage and platforms for building material storage on upper enclosure part; erecting cutoff walls inside space defined by enclosure; removing water from the enclosure; developing bottom ground by trench digging; constructing pile tunnel base; building foundation grill on pile tunnel base; locating composite or precast reinforced concrete tunnel sections on foundation grill; recovering initial floatability of the enclosure. Enclosure structure has movable fastening means formed as blades along vertical walls thereof.

EFFECT: increased tunnel reliability, reduced time of erection thereof.

4 cl, 4 dwg

 

The present invention relates to hydraulic construction, mainly to technology strip road tunnel or tunnel other purposes under the river bed or underneath other shallow water areas. Mainly they can be used to form temporary fencing closed in the plan section of the bottom waters and located over him space throughout the water column.

Known USSR author's certificate No. 1067142, MKI E 02 D 5/20, published in BI - 2 - 1984 issued by the system for temporary drainage area of the bottom. In this known invention disclosed is a method of construction of the tunnel is shallow on the bottom. The above method involves the creation of temporary fencing hydraulic fence from a collection of shells formed by, for example, from a metallic sheet, each of which increases the depth of the waters erected element along the perimeter of the closed in terms of the chosen section of the bottom. In the closed form in terms of the fenced area, then from the enclosed space to remove the water and then inside it on the bottom of the dry method produces construction work on the construction of the tunnel. Upon its completion, hydraulic fence element is removed with subsequent use of its elements.

This is a known technical solution is selected as a prototype. It solves the problem, similar to the claimed invention, because it contains with it the greatest number of total essential features and is one of the latest developments in this field.

However, the prototype has significant drawbacks, which are that:

- use a variety of elements having a different form, and from which in the aquatic environment form a closed envelope directly on the bottom site that requires a long construction period;

- formed a temporary hydraulic fence may not be used as a vertically loaded structures to support the process of construction of the tunnel inside the fence.

Known technical solution under the title “System for temporary drainage area of the bottom (see USSR author's certificate No. 1067142, MKI E 02 D 5/20, published in BI - 2 -1984,). It implements the aforementioned known method of construction of the tunnel is shallow on the bottom and is a closed plan submerged at the bottom of the waters of the temporary hydraulic fence. This fence consists of a set of different forms of shells formed, for example, from a metallic sheet, which have an elliptical, circular or parabolic shape in the plan.

However, the prototype has a significant who's shortcomings, such as:

- consists of a set of variety in form and design, separate from each other elements that require to assemble them into a single structure in the water a long construction period, as well as high accuracy in their Assembly into complex hydrological conditions and, accordingly, a lot of work;

- this is a temporary hydraulic fence may not be used as a vertically loaded structures to support the process of construction of the tunnel inside the fence.

The first objective of the present invention to provide a novel method of construction of the tunnel is shallow on the bottom, which would be easier, more reliable and would allow us to build the tunnel is shallow for a short period of time.

This problem is solved by modifying the well-known method of construction of the tunnel is shallow on the bottom, which includes the formation of the provisional hydraulic fence around the perimeter of the closed-in area of the seabed and removing water from the enclosed space, running inside construction dry method, followed by its removal. According to the present invention initially create one with buoyancy-driven hydraulic fence without the bottom part, transported it to the bottom site prittlewell to bottom by decreasing the th buoyancy and fixed at the bottom, and upon completion of construction works within this enclosed space of the hydraulic barrier return the original buoyancy, separated from the bottom and transported to the next site of erection of the tunnel.

There is a version of the improvement of the proposed method, which for the manufacture of the hydraulic fence as a workpiece using a floating dock that is made without a bottom.

This new technical solution to all your set of essential features allows you to create a new method of construction of the tunnel shallow waters, which, compared with known similar purpose ways has the following advantage: a single reusable hydraulic barriers, performed in the factory. Significantly, the above-mentioned hydraulic fence has the property that are not in the prototype, namely to be load-bearing structure, which can be placed, for example, crane equipment and sites for temporary storage of construction materials.

Conducted by the applicant, patent information search showed that the proposed set of essential distinctive features is not detected. Compared with the prototype of the proposed method has the beings who nnye differences. They are that temporary hydraulic fence closed in the plan section of the bottom is formed in advance, and it is made in the factory that is not in the prototype. Therefore, the proposed method of construction of the tunnel is shallow in the water area can be considered as a relevant criterion of “novelty”.

The proposed method involves an inventive step, because for the average it professional qualification this method does not follow logically from the prior art. So, for example, from a prototype known creation in temporary water hydraulic fence from a set of constituent elements. The patent of Russia №2044117 issued by the method of formation of the new land area at the bottom, we offer hydraulic fence bottom to produce by forming it in the water from a set of component parts. In our case the situation is opposite:

- used hydraulic fence, made industrially in the form of a floating dock, which is made without a bottom;

- this fence is delivered to the installation site and by reducing the buoyancy placed at the bottom;

- upon completion of construction works within the enclosed space this hydraulic barrier return the original buoyancy and transported it to the next is castac the construction of the tunnel.

The second objective of the present invention is to provide a system for temporary drainage area of the bottom, capable of implementing the proposed method of construction of the tunnel shallow waters and to perform additional functions when the tunnel.

This problem was solved by modifying the known systems for temporary drainage area of the bottom, which contains closed in terms of temporary hydraulic structure. According to the present invention in the proposed system temporary hydraulic structure designed as a single structure without bottom with controlled buoyancy.

There is an option to improve this system, which as a temporary waterworks applied floating dock located along the vertical walls of the movable clamps, for example, in the form of knives.

This new technical solution to all your set of essential features allows you to have a system for temporary drainage area of the bottom, eliminating the process of the element mounting enclosing structures.

Compared with the prototype of the proposed system has significant differences, which are, first, that as a temporary fences closed in the plan section of the bottom, use the same design, produced in the factory.

<> The proposed system involves an inventive step, as it is for the average it professional qualification does not follow logically from the prior art. The prior art system of temporary hydraulic barriers that are created in the aquatic environment in the area of the bottom waters of sequentially mounted set of elements of different shapes. In our case, a temporary hydraulic fence made industrially, for example in the form of the dock, which gives the function of temporary hydraulic fencing section of the bottom.

The essence of the invention is illustrated by drawings, where:

Figure 1 - cross section of temporary hydraulic fencing during the construction phase of the tunnel;

Figure 2 - General view of the hydraulic fencing is a perspective view, in the transport position;

Figure 3 - General view of the hydraulic fencing is a perspective view of being printablepage on the bottom of the waters;

4 is a General view of temporary hydraulic fence installed on the bottom, in the execution stage of the tunnel is shallow.

Practical application of the proposed invention is illustrated below by the following description.

The proposed method of construction of the tunnel is shallow on the bottom is as follows:

Originally industrially manufactured avleat single with temporary buoyancy-driven hydraulic barrier 1, in particular, in view of the dock from which the bottom is missing. (1, 2, 3, 4). It may have, for example, the following geometrical dimensions. The width of the dock is 30 meters (for wiring through the draw-spans of the existing bridge), length 60 m, height - 15 meters. The side of the tower dock comply with a closed perimeter with the width of each 3 meters. They are the tanks 2 buoyancy transport dock 1 and landing it on the bottom of the 3 areas. When such hydraulic enclosure 1 is made in the factory, then it towed (Figure 2) through the draw-bridges (not shown), the output of the track tunnel, prittlewell to bottom by decreasing its buoyancy, fixed with the help of retractable knives 4 and is securely fastened to the ground by a system of anchors. The upper part of the dock 1 level on the horizon, so you can put on this fence crane equipment 5, and sites for temporary storage of construction materials. The alignment of the upper part of the dock can be done by the layout of the bottom waters and the extension of knives 4 (figure 1). The upper part of the dock 1 rises above the water level 10. For the development of bottom soil within the fenced dock 1 space around the perimeter of the future pit build sheet pile walls 6 (Fig 1, 4). Then remove the water from the enclosed space (Fig., 2, 4) and dry open way leading tunnel construction work (1, 4). While such hydraulic barrier can be moored floating cranes, concrete Plemzavod, barge (not shown). Upon completion of the construction of hydraulic barrier 1 return the original buoyancy, separated from the bottom and transported to the next site of erection of the tunnel (Figure 2).

The proposed system for temporary drainage area of the bottom, which is used to implement the above method, consists of a closed in terms of temporary hydraulic structures 1. This structure is designed as one, with controlled buoyancy design without the bottom part, for example in the form of the dock. On the inside the walls are movable clamps, for example, in the form of knives 4 (figure 1). Using such a system as described above. And after drainage of enclosed space on the bottom tear off the pit (Figure 4), create a support pile 7 field (Figure 1) tunnel, on which is erected a grillage 8 and place precast or monolithic reinforced concrete section 9 of the tunnel, ensuring reliable connections and waterproofing. Then occiput bottom protective cushion above the ceiling of the tunnel and turn the system on new construction site of the tunnel.

1. The method of construction of small tunnel rat is at the bottom of the waters, including the formation of the provisional hydraulic fence around the perimeter of the closed-in area of the seabed and removing water from the enclosed space, carrying within it the construction works by the dry process with subsequent dismantling of hydraulic barriers, characterized in that initially made one with buoyancy-driven hydraulic fence without the bottom part, which is then transported and take to the track tunnel, prittlewell to bottom by decreasing its buoyancy and is fixed on the bottom with the help of clamps and anchors, while the upper part of the hydraulic fences, placed above the water level on the horizon and place it crane equipment and sites for temporary storage of construction materials, then build sheet pile walls inside the enclosed space, and then remove the water from the enclosed space, develop the bottom ground by excavation, and then create a support pile field tunnel, on which is erected a grillage with the placing of precast or monolithic reinforced concrete sections of the tunnel, after completion of the work within the enclosed space of the hydraulic barrier return the original buoyancy, separated from the bottom and transported to the next site of erection of the ton who I am.

2. The method according to claim 1, characterized in that as hydraulic barriers use floating dock without a bottom.

3. System for temporary drainage area of the bottom that is used for implementing the method according to claim 1, characterized in that the temporary hydraulic fencing is made in the form of a uniform design with controlled buoyancy without the bottom part with movable clamps in the form of knives by vertical walls.

4. The system according to claim 3, characterized in that as a temporary hydraulic fencing used floating dock without a bottom.



 

Same patents:

The invention relates to the field of hydraulic engineering construction, namely for the construction of offshore pipelines, built in shelf seas with severe ice conditions

The invention relates to the development of mineral resources on the continental shelf and continental slope of the ocean (oil, gas, gas, gas condensate deposits, etc

FIELD: stationary sea oil platforms.

SUBSTANCE: block has underwater support, made in form of two-level bench, formed by vertical beam cases and horizontal links, and also has support columns, connected to support. Horizontal links of bench are made in form of floating tanks, while links, placed along perimeter of lower level of bench, are separated by water-impenetrable walls on sections, provided with ballasting means. Method for mounting support block at the bottom of continental shelf includes transporting, ballasting of floating tanks and fixing support block at the bottom of water body. Support block is transported into wells drilling zone in planned position, sections of floating tanks are ballasted until lower level of support lowers into bottom of water body for 0.3-0.7 of its height, different and slants are evened and holding beams are inserted into cases of support with their following forcing into hard bottom portion and fixing in cases. Ballasting of sections of floating tanks and forcing of holding beams can be performed in pairs in diagonal planes relatively to center of lower level of support.

EFFECT: simplified assemblage, higher reliability.

2 cl, 12 dwg

FIELD: hydraulic engineering, particularly building bases and foundations, namely bridge piers, in water.

SUBSTANCE: method involves monitoring water obstacle in support building place, including investigating water parameters, recording water level in the course of year, determining floor shape, investigating floor ground, influence of outer disturbing forces and calculating weight and dimensions of support foundation case on the base of above parameters; producing hollow case with several cavities; moving case to installation place; submerging case in water; pacing thereof on floor; fixing case by piles and smoothing floor. Case submerging and placing operations are performed simultaneously with stabilizing vertical case position by performing control and filling of corresponding cavities. Bottom smoothing process is carried out by forcing artificial material, such as concrete layers with crushed stone interlayers, under case bottom. During case placing case is secured by blades built in case bottom and by piles inserted in cavities. Correspondence between case weight, number of blades, head resistance and side friction thereof for particular ground is determined to provide case stability on ground. Upper edge of submerged case is located above maximum possible water wave height. Rock fill is formed around underwater case part.

EFFECT: reduced time of support erection, increased reliability and stability, safety and service life, reduced labor inputs, possibility to erect supports in Arctic basin.

3 cl 1 ex

The invention relates to the development of underwater mineral deposits, namely for the construction of technological systems, which provide carrying out maintenance work on the shelf of the open sea

The invention relates to the field of drilling offshore, in particular to methods of installation drilling monoatomic reason, stabilize them on the bottom and dismantling

The invention relates to the development of underwater mineral deposits, mainly of liquid and gas, the construction of technological systems that provide on the continental shelf the high seas with the ability against ice, and seismic loads

Drilling platform // 2231594
The invention relates to a device for carrying out engineering-geological surveys on the shelf and can be used for drilling operations in shallow water, open water areas

The invention relates to the development of underwater mineral deposits, mainly of liquid and gas, the construction of technological systems, which provide mainly operational, works on the deep shelf seas

The invention relates to the development of underwater mineral deposits, mainly of liquid and gas, the construction of technological systems that provide on the continental shelf the high seas

The invention relates to the field of hydraulic engineering construction and can be used during the construction of long-term hydraulic structures during the development and construction of shallow sites, for example in the extraction and deep processing of hydrocarbon raw materials, during the construction of the hatchery industrial complexes, in particular, during the construction of artificial Islands

The invention relates to the field of construction of offshore marine structures designed for drilling and/or production of oil or gas in the deepwater areas of the ice period

FIELD: hydraulic engineering, particularly building bases and foundations, namely bridge piers, in water.

SUBSTANCE: method involves monitoring water obstacle in support building place, including investigating water parameters, recording water level in the course of year, determining floor shape, investigating floor ground, influence of outer disturbing forces and calculating weight and dimensions of support foundation case on the base of above parameters; producing hollow case with several cavities; moving case to installation place; submerging case in water; pacing thereof on floor; fixing case by piles and smoothing floor. Case submerging and placing operations are performed simultaneously with stabilizing vertical case position by performing control and filling of corresponding cavities. Bottom smoothing process is carried out by forcing artificial material, such as concrete layers with crushed stone interlayers, under case bottom. During case placing case is secured by blades built in case bottom and by piles inserted in cavities. Correspondence between case weight, number of blades, head resistance and side friction thereof for particular ground is determined to provide case stability on ground. Upper edge of submerged case is located above maximum possible water wave height. Rock fill is formed around underwater case part.

EFFECT: reduced time of support erection, increased reliability and stability, safety and service life, reduced labor inputs, possibility to erect supports in Arctic basin.

3 cl 1 ex

FIELD: stationary sea oil platforms.

SUBSTANCE: block has underwater support, made in form of two-level bench, formed by vertical beam cases and horizontal links, and also has support columns, connected to support. Horizontal links of bench are made in form of floating tanks, while links, placed along perimeter of lower level of bench, are separated by water-impenetrable walls on sections, provided with ballasting means. Method for mounting support block at the bottom of continental shelf includes transporting, ballasting of floating tanks and fixing support block at the bottom of water body. Support block is transported into wells drilling zone in planned position, sections of floating tanks are ballasted until lower level of support lowers into bottom of water body for 0.3-0.7 of its height, different and slants are evened and holding beams are inserted into cases of support with their following forcing into hard bottom portion and fixing in cases. Ballasting of sections of floating tanks and forcing of holding beams can be performed in pairs in diagonal planes relatively to center of lower level of support.

EFFECT: simplified assemblage, higher reliability.

2 cl, 12 dwg

FIELD: hydraulic engineering, particularly for forming temporary structures for enclosing closed in plane water area bottom part and space above the bottom part through the full water thickness.

SUBSTANCE: method of shallow tunnel construction involves forming structure enclosing closed in plane bottom part; removing water from the structure; performing works in dry structure and demounting above structure. Method of enclosing structure forming involves producing bottomless hydraulic enclosure with controlled floatability; transporting and moving thereof to tunnel path; immersing the enclosure in water up to reaching water area bottom by reducing floatability thereof and fixing enclosure with fastening means and anchor system; leveling upper enclosure part with horizon line and arranging cranage and platforms for building material storage on upper enclosure part; erecting cutoff walls inside space defined by enclosure; removing water from the enclosure; developing bottom ground by trench digging; constructing pile tunnel base; building foundation grill on pile tunnel base; locating composite or precast reinforced concrete tunnel sections on foundation grill; recovering initial floatability of the enclosure. Enclosure structure has movable fastening means formed as blades along vertical walls thereof.

EFFECT: increased tunnel reliability, reduced time of erection thereof.

4 cl, 4 dwg

FIELD: production of ice.

SUBSTANCE: method comprises producing a hollow near the ship's side, delivering air under the ice cover, the air volume does not exceeding the volume of the space defined by ice covering from the top, water from the bottom, and ice walls from the sides over the contour of the future hollow. The walls are frozen from top to bottom by means of direct nonseparable heat exchangers mounted in advance into the covering immediately behind the contour up to the bottom of the future hollow. The delivery stops and the bottom of the future hollow is frozen with the use of L-shaped nonseparable heat exchangers set into the covering simultaneously with the direct heat exchangers. As a result, a closed space is defined, which is stripped, and ice blocks are removed.

EFFECT: enhanced efficiency.

FIELD: hydraulic engineering, particularly underwater structures adapted for oil and gas well operation, preferably on shallow continental shelf having bottom covered with thick silt layer and in ice-covered period.

SUBSTANCE: platform comprises base, vertical pile holders connected with the base and positioning unit for drilling string and well-control equipment fixation. Base is formed as a structure with cavities filled with ballast. The structure is composed of hollow members and functionally divided into two areas. Positioning unit is arranged in the first area, another area including catching opening. Platform is additionally provided with removable mounting frame with production equipment installed on the frame. Arranged in lower frame part are inclined guiding means to provide access into catching opening during mounting frame connection with support platform base in underwater position.

EFFECT: reduced labor inputs for production equipment mounting and maintenance, increased reliability.

7 dwg

FIELD: offshore oil-field hydraulic structures, namely for building fixed platforms.

SUBSTANCE: support substructure comprises three-dimensional latticed structure having prismatic shape and composed of tubular members. The structure has vertical panels with posts, cross-pieces, struts and horizontal diaphragms connected one to another. Horizontal diaphragms have guiding nets for marine risers. The structure is secured to ground by main piles arranged in vertical posts and by foundation having additional piles, which is rigidly connected to tubular members of side edges of above structure. The structure is provided with ice-protection means formed as two truncated prisms of sheet steel and having beveled side ribs rigidly connected one to another by major bases. Marine risers are arranged inside prisms. Each prism of ice-protection means is rigidly connected with tubular members of corresponding diaphragms of three-dimensional latticed structure.

EFFECT: increased resistance to wave, seismic and ice loads, improved manufacturability and, as a result, reduced cost of permanent offshore structure building.

3 cl, 2 dwg

FIELD: offshore oil-field hydraulic structures, namely for building fixed platforms.

SUBSTANCE: method for forming support substructure by welding large blocks involves producing and serially connecting precast members to create flat units, namely panels and diaphragms; connecting flat units by tubular inserts and tubular links to create three-dimensional latticed structure. All operations are divided into four stages in accordance with technological order. The first stage includes forming tubular links and tubular inserts, pile sections and marine riser sections. The second stage includes assemblage of flat panels and diaphragms in horizontal position on corresponding mats. The third and the forth stages include simultaneous installation of flat panels and diaphragms and rigid connection thereof.

EFFECT: reduced labor inputs, time and cost for assembly work performing due to elimination of complicated tubular joints used as assembly units.

3 cl, 7 dwg

FIELD: ground hydraulic structure erection, particularly to decontaminate silt or bottom sediments in water bodies.

SUBSTANCE: method involves building protective dam along perimeter of silt and/or bottom sediment area to be protected; laying waterproofing layer along inner dam perimeter, wherein waterproofing layer height is 2 times as much as silt and/or bottom sediment layer; forming artificial ground massif of watertight ecologically friendly natural ground in water area inside the dam, wherein artificial ground massif thickness is equal to at least three thicknesses of silt and/or bottom sediment layer; forming above-water relief area having 2.5 m height over water surface; forming surface flow discharge system and planting greenery in artificial ground massif.

EFFECT: increased reliability, reduced contamination concentration, prevention of hazardous substances ingress in ambient space and improved ecological safety.

2 cl, 1 dwg