Working member for machine for digging pipeline

FIELD: construction.

SUBSTANCE: working member comprises rotors provided with teeth arranged symmetrically with respect to the axis of pipeline and provided with drive and mechanism for bringing the rotors together and moving them apart. Each rotor is provided with cleaning device which is arranged behind the rotor and secured to the unmovable segment of the working member for keeping it unmovable or permitting rotation. The cleaning members permanently co-operate with the outer side of the rotor.

EFFECT: enhanced efficiency.

1 dwg

 

The invention relates to earth-moving machines, namely the working bodies of machines for digging, intended for opening the trunk pipelines are repaired in the field.

From the description of the patent of the Russian Federation No. 2146784 "Machine for removal of soil from under the oil(gas)-pipeline", IPC F 16 L 1 1/028, publ. 20.03.00, bull. No. 8 (prototype), well - known machine for digging with a work body in the form of two rotors with teeth (in the description - knives), symmetrically placed about the axis of the pipeline with the actuator and the device information and the cultivation of the rotor (in the description of the seizures).

While the machine is rotating the rotor with teeth loosen the soil under the pipe and move it into the recesses of the bottom of the trench As a rule, teeth or other loosening elements are located on the rotor rows in a checkerboard pattern, while in the series is set a few teeth, and the cutting edges of the teeth block the aisle. A large number of teeth on the working body leads to high consumption of the process of destruction of the soil, leads to their sticky as in cohesive soils, in General, which reduces the efficiency of the working body and leads to the necessity of periodic cleaning of the surface of the rotor manually in the cramped conditions of the trench.

Search address this issue by increasing p is omegatron between the teeth partially improve the situation only in certain ground conditions.

The objective of the invention is the increased efficiency of the development of the soil working body: reduce energy intensity and pressure force when digging under the pipeline by eliminating Hicks teeth ground by forcing cleaning sticky soil.

The problem is solved due to the fact that the working body of the machine for digging a pipeline, comprising a rotor with teeth, placed symmetrically with respect to the axis of the pipeline with the actuator and the mechanism for their information and cultivation, each rotor is provided with a cleaning device attached to a fixed part of the working body is static or with the possibility of rotation and located behind the rotor in the direction of travel of the machine, with treatment elements are constantly interacting with the outer surface of the rotor.

The advantages of the invention and its structural features are illustrated by the drawing, which shows a front view of the pin body with a cleaning device which is fixed statically (without drive) relative to the vertical axial plane of the pipe, the left part; the front view on the working body with a cleaning device equipped with a motor for rotation relative to the vertical axial plane of the pipe, right side.

The working body 1 of the vehicle 2 for digging pipe 3 includes a rotor 4 with the teeth 5. The rotors 4 posted by SIM is etrice relative to the axis of the pipe 3 on both of its sides and provided with a drive 6, the rotation mechanism 7 for information and cultivation of the rotors 4 and coverage of the pipeline 3.

The arrangement of the teeth 5 on the rotor 4 may be different, such as rows a, b, C with the spacing between rows in the horizontal plane or along a helical line, with gaps between the spiral lines.

Each rotor 4 provided with a purifying device 8 with treatment elements 9, such as brushes. The treatment device 8 mounted on a stationary bracket 10 of the working body 1, is mounted behind the rotor 4 in the direction of travel of the machine 1 and may have different options: without actuator with brushes 9 when static fixing station 11 with the same brush 9.

Other variants of the clearing device.

Treatment elements 9 (brush) cleaning device 8 is placed in between the rows of teeth 5 of the rotor 4.

The outer dimensions of the cleaning device 8 for cleaning items (brushes) 9 does not exceed the external dimensions of the working body 1 in the teeth 5 of the rotor 4.

Working the body 1 of the vehicle 2 as follows.

Prior to installation on the pipeline 3 working bodies 1 and the rotor 4 are dissolved in the hand mechanism 7, then machine 2 is installed on the pipe 3, and the working bodies 1 are included with the actuator 6 of the rotor 4 to the operating position.

Machine 2 translational moves along the pipe 3 and through the rotor 4 otkapivaet the soil under the pipe 3. The treatment device 8 m & g the m version is fixed on the bracket 10 with the rotor 4 in the direction of travel of the vehicle 2. The treatment device 8 with the actuator 11 with or without the help of treatment elements brushes 9 being in contact with the outer surface of the rotating rotor 4, cleans stuck in between the teeth 5 on the rotor 4 of the soil.

Using the proposed design increases the efficiency of the working body of the machine. By eliminating sticking of the teeth of the soil parameters of the process of development of the soil under the pipe, the energy intensity of efforts and pressure are maintained constant.

Thus, cleaning of the rotor is forcibly without stopping the machine.

The working body of the machine for digging a pipeline, comprising a rotor with teeth, placed symmetrically with respect to the axis of the pipeline with the actuator and the mechanism for their information and cultivation, characterized in that each rotor is provided with a cleaning device attached to a fixed part of the working body is static or with the possibility of rotation and located behind the rotor in the direction of travel of the machine, with treatment elements are constantly interacting with the outer surface of the rotor.



 

Same patents:

FIELD: construction.

SUBSTANCE: pipeline has triply connected supports mounted on the stable sections above and under the slope subject to creep, one connected supports arranged over the subject to creep slope, and deformation compensator. The distance between the upper support and site of the deformation compensator arranged below the slope subject to creep is determined from the formula proposed.

EFFECT: enhanced reliability of the pipeline.

2 dwg

FIELD: pipeline transport.

SUBSTANCE: flexible pipeline comprises several pulp lines provided with chambers with ball check valves and interconnected through piping diaphragms. The outer surface of the pulp line is provided with a displacement device for movement along the pipeline. The sections of pulp lines receive shell made of layers of syntactic and polyurethane, the ratio of thicknesses of which is (10-4):1. The displacement device affects the piping diaphragm, pumps hydraulic mixture from the bottom section to the next one which is arranged above the check valve, and moves along the outer side of the pulp line to the next piping diaphragm mounted above.

EFFECT: expanded functional capabilities.

3 dwg

FIELD: construction.

SUBSTANCE: pipeline is laid on the concave part of the longitudinal section of the trench bottom on the layer of soft soil and is locked by filling one or two layers of soil with compacting. Screw vertical anchors and load-carrying belts are then mounted. Before filling the trench, the space between the belt and pipeline is provided with a cloth of unwoven synthetic material.

EFFECT: enhanced reliability of pipeline locking.

4 dwg

FIELD: laying or reclaiming pipes.

SUBSTANCE: method includes removing upper layer of spoil, developing side trench with disposal the spoil by damping. The development of side trenches is performed step-by-step. The stripped trench is provided with stripping machine, the side trench are deepened by the working members of the stripping machine below the bottom of the pipeline and pipeline is continuously stripped by trenching machine and stripping machine when it moves forward. The stripping machine has frame with running carriages, clamps, supporting members and mechanism for forward motion.

EFFECT: enhanced efficiency.

3 cl, 4 dwg

FIELD: construction engineering; erection of underground pipe lines in permafrost soils, in bogs and in flooded and marshy areas.

SUBSTANCE: proposed polymer container ballasting unit has two distance rigidity frames located on both sides from pipe line, reservoirs made from polymer commercial cloth and filled soil which are secured to said frames, anti-erosion partitions and upper and lower weighting belts. Distance rigidity frames are curvilinear in form and their height exceeds diameter of pipe line being ballasted. Bend of each frame is made at obtuse angle and lower part of each frame is inclined towards pipe line relative to trench bottom. Polymer commercial cloth laid along pipe line makes distance frame rest against ground of trench bottom both in filling the reservoirs with soil and at action of pushing-out load.

EFFECT: extended functional capabilities.

3 cl, 1 dwg

FIELD: pipe line transport; major repair of pipe lines.

SUBSTANCE: proposed method includes introducing the front end of pipe into damage pipe and forming hermetic cavity in inter-pipe space; then, pressure air (gas) is charged into hermetic cavity for motion of new pipe inside damaged pipe, after which piston is fitted at end of new pipe and detachable flange is connected to rear end of damaged pipe; motion of new pipe is effected by periodic charging of air into hermetic cavities; each hermetic cavity is bounded by piston and seal.

EFFECT: reduction of tractive force.

5 dwg

FIELD: construction engineering; erection of pipe lines in permafrost soils at alternating terrain.

SUBSTANCE: trench in smooth terrain and in sections cut by hydrographic net is dug in active layer at depth sufficient for location of upper generatrix of pipe line above level of daily level. Prior to laying the pipe line, bottom walls and berms of trench are lined with cloth of non-woven synthetic material. backfill soil is placed in ballasting polymer panel-type devices or in ballasting polymer container-type units suspended from pipe line. Anti-erosion partitions made from non-woven synthetic material are formed in sloping sections together with funnel whose neck is located downward of water flow embracing the pipe line at specified clearance between neck and pipe line. Funnel is formed by covering the natural slope of backfill soil by free lower edge of non-woven synthetic material with ballasting polymer panel-type or ballasting polymer container-type devices placed on lower portion of funnel followed by subsequent removal of embankment protecting the pipe line. As far as sections of route cut by hydrographic network are concerned, anti-erosion partitions are formed in trench at transients with opposite slopes of microterrain; anti-erosion partitions are made from anti-erosion cloths and backfill soil is placed n soil-filled weighting materials attached to pipe line. At low points where opposite sections cross, water pass or water bypass structure is formed in trench.

EFFECT: enhanced reliability; reduced scope of earth-moving work; enhanced stability of pipe line in horizontal plane.

9 cl, 8 dwg

FIELD: construction engineering; erection of pipe lines in thawing permafrost soils and in flooded areas.

SUBSTANCE: proposed method includes ditching at trench with widened areas located at definite distances and pipe line is laid on bottom of trench. Pipe line is covered with flexible rugs and bottom of trench at widened areas is also covered with rugs; edges of rugs are fastened in widened areas and trench is filled. Used as anchor member are cylindrical textile containers placed in lugs of flexible rugs in parallel with pipe line and filled with soil. Prior to fastening the edge sections of flexible rugs, each of them is tightened at fixation of tension; preliminary tension of edge sections is effected during filling the widened areas and trench soil ensuring contact of flexible rugs with bottom of widened areas and trench. Filling the widened areas and trench is performed in direction towards pipe line, symmetrically relative to it.

EFFECT: enhanced reliability of attachment of pipe line at 0required marks.

13 cl, 4 dwg

FIELD: construction, applicable for trenchless laying and replacement of underground pipe-lines.

SUBSTANCE: a reciprocating striker is positioned in the casing of the pneumatic percussion mechanism. The air-distributing system of the mechanism includes the front and rear working chambers, inlet and exhaust valves and a fixture for closing and opening of the exhaust channels made in the form of a spring-loaded end face stopper coupled to a tractive member. At actuation of the pneumatic percussion mechanism, before the supply of compressed air, the exhaust channels are closed, they are opened after the inner cavities of the pneumatic percussion mechanism are filled with compressed air.

EFFECT: provided automatic cyclic action of the pneumatic percussion mechanism.

3 cl, 3 dwg

The invention relates to construction and is used for trenchless installation and replacement of underground pipelines

FIELD: construction, applicable for trenchless laying and replacement of underground pipe-lines.

SUBSTANCE: a reciprocating striker is positioned in the casing of the pneumatic percussion mechanism. The air-distributing system of the mechanism includes the front and rear working chambers, inlet and exhaust valves and a fixture for closing and opening of the exhaust channels made in the form of a spring-loaded end face stopper coupled to a tractive member. At actuation of the pneumatic percussion mechanism, before the supply of compressed air, the exhaust channels are closed, they are opened after the inner cavities of the pneumatic percussion mechanism are filled with compressed air.

EFFECT: provided automatic cyclic action of the pneumatic percussion mechanism.

3 cl, 3 dwg

FIELD: construction engineering; erection of pipe lines in thawing permafrost soils and in flooded areas.

SUBSTANCE: proposed method includes ditching at trench with widened areas located at definite distances and pipe line is laid on bottom of trench. Pipe line is covered with flexible rugs and bottom of trench at widened areas is also covered with rugs; edges of rugs are fastened in widened areas and trench is filled. Used as anchor member are cylindrical textile containers placed in lugs of flexible rugs in parallel with pipe line and filled with soil. Prior to fastening the edge sections of flexible rugs, each of them is tightened at fixation of tension; preliminary tension of edge sections is effected during filling the widened areas and trench soil ensuring contact of flexible rugs with bottom of widened areas and trench. Filling the widened areas and trench is performed in direction towards pipe line, symmetrically relative to it.

EFFECT: enhanced reliability of attachment of pipe line at 0required marks.

13 cl, 4 dwg

FIELD: construction engineering; erection of pipe lines in permafrost soils at alternating terrain.

SUBSTANCE: trench in smooth terrain and in sections cut by hydrographic net is dug in active layer at depth sufficient for location of upper generatrix of pipe line above level of daily level. Prior to laying the pipe line, bottom walls and berms of trench are lined with cloth of non-woven synthetic material. backfill soil is placed in ballasting polymer panel-type devices or in ballasting polymer container-type units suspended from pipe line. Anti-erosion partitions made from non-woven synthetic material are formed in sloping sections together with funnel whose neck is located downward of water flow embracing the pipe line at specified clearance between neck and pipe line. Funnel is formed by covering the natural slope of backfill soil by free lower edge of non-woven synthetic material with ballasting polymer panel-type or ballasting polymer container-type devices placed on lower portion of funnel followed by subsequent removal of embankment protecting the pipe line. As far as sections of route cut by hydrographic network are concerned, anti-erosion partitions are formed in trench at transients with opposite slopes of microterrain; anti-erosion partitions are made from anti-erosion cloths and backfill soil is placed n soil-filled weighting materials attached to pipe line. At low points where opposite sections cross, water pass or water bypass structure is formed in trench.

EFFECT: enhanced reliability; reduced scope of earth-moving work; enhanced stability of pipe line in horizontal plane.

9 cl, 8 dwg

FIELD: pipe line transport; major repair of pipe lines.

SUBSTANCE: proposed method includes introducing the front end of pipe into damage pipe and forming hermetic cavity in inter-pipe space; then, pressure air (gas) is charged into hermetic cavity for motion of new pipe inside damaged pipe, after which piston is fitted at end of new pipe and detachable flange is connected to rear end of damaged pipe; motion of new pipe is effected by periodic charging of air into hermetic cavities; each hermetic cavity is bounded by piston and seal.

EFFECT: reduction of tractive force.

5 dwg

FIELD: construction engineering; erection of underground pipe lines in permafrost soils, in bogs and in flooded and marshy areas.

SUBSTANCE: proposed polymer container ballasting unit has two distance rigidity frames located on both sides from pipe line, reservoirs made from polymer commercial cloth and filled soil which are secured to said frames, anti-erosion partitions and upper and lower weighting belts. Distance rigidity frames are curvilinear in form and their height exceeds diameter of pipe line being ballasted. Bend of each frame is made at obtuse angle and lower part of each frame is inclined towards pipe line relative to trench bottom. Polymer commercial cloth laid along pipe line makes distance frame rest against ground of trench bottom both in filling the reservoirs with soil and at action of pushing-out load.

EFFECT: extended functional capabilities.

3 cl, 1 dwg

FIELD: laying or reclaiming pipes.

SUBSTANCE: method includes removing upper layer of spoil, developing side trench with disposal the spoil by damping. The development of side trenches is performed step-by-step. The stripped trench is provided with stripping machine, the side trench are deepened by the working members of the stripping machine below the bottom of the pipeline and pipeline is continuously stripped by trenching machine and stripping machine when it moves forward. The stripping machine has frame with running carriages, clamps, supporting members and mechanism for forward motion.

EFFECT: enhanced efficiency.

3 cl, 4 dwg

FIELD: construction.

SUBSTANCE: pipeline is laid on the concave part of the longitudinal section of the trench bottom on the layer of soft soil and is locked by filling one or two layers of soil with compacting. Screw vertical anchors and load-carrying belts are then mounted. Before filling the trench, the space between the belt and pipeline is provided with a cloth of unwoven synthetic material.

EFFECT: enhanced reliability of pipeline locking.

4 dwg

FIELD: pipeline transport.

SUBSTANCE: flexible pipeline comprises several pulp lines provided with chambers with ball check valves and interconnected through piping diaphragms. The outer surface of the pulp line is provided with a displacement device for movement along the pipeline. The sections of pulp lines receive shell made of layers of syntactic and polyurethane, the ratio of thicknesses of which is (10-4):1. The displacement device affects the piping diaphragm, pumps hydraulic mixture from the bottom section to the next one which is arranged above the check valve, and moves along the outer side of the pulp line to the next piping diaphragm mounted above.

EFFECT: expanded functional capabilities.

3 dwg

FIELD: construction.

SUBSTANCE: pipeline has triply connected supports mounted on the stable sections above and under the slope subject to creep, one connected supports arranged over the subject to creep slope, and deformation compensator. The distance between the upper support and site of the deformation compensator arranged below the slope subject to creep is determined from the formula proposed.

EFFECT: enhanced reliability of the pipeline.

2 dwg

FIELD: construction.

SUBSTANCE: working member comprises rotors provided with teeth arranged symmetrically with respect to the axis of pipeline and provided with drive and mechanism for bringing the rotors together and moving them apart. Each rotor is provided with cleaning device which is arranged behind the rotor and secured to the unmovable segment of the working member for keeping it unmovable or permitting rotation. The cleaning members permanently co-operate with the outer side of the rotor.

EFFECT: enhanced efficiency.

1 dwg