Method and device for stripping pipeline

FIELD: laying or reclaiming pipes.

SUBSTANCE: method includes removing upper layer of spoil, developing side trench with disposal the spoil by damping. The development of side trenches is performed step-by-step. The stripped trench is provided with stripping machine, the side trench are deepened by the working members of the stripping machine below the bottom of the pipeline and pipeline is continuously stripped by trenching machine and stripping machine when it moves forward. The stripping machine has frame with running carriages, clamps, supporting members and mechanism for forward motion.

EFFECT: enhanced efficiency.

3 cl, 4 dwg

 

The invention relates to the field of repair of trunk pipelines, and in particular to methods and equipment for opening the oil(gas)pipelines in route conditions

From the description of the patent of the Russian Federation No. 2163320 "mode of production Stripping", IPC F 16 L 1/026 publ. Bull. from No. 5, 2001 there is a method of opening of the pipeline in which the top layer of soil cut by the excavator, and the development of rocky or frozen ground is carried out using vzryvopozharnoy setup (VSU) using liquid explosive mixtures (GWS). The described method is suitable for extracting oil pipelines laid in rocky and frozen ground.

There is a method of opening the oil(gas)pipelines and device for its implementation from German patent No. 19514052, IPC F 16 L 1/026, publ. 19.10.95, where the repaired area off the upper part of the soil to a depth of up to a plane tangent to the outer surface of the pipeline with the formation of the vertical walls of the trench. After using the machine on tracks with symmetrically mounted chain working bodies with devices for transportation of soil to the developing blade side of the trench to a depth sufficient to use the intake milling of the working body. Further, under the pipeline start milling the working body and the development side is ransei carried out simultaneously with the digging during continuous movement of a caterpillar.

However, the described method and apparatus have a number of disadvantages: the machine is complicated to manufacture, does not exclude damage to the pipeline.

Closest to the claimed method is the current in the RF way of opening the trunk pipelines, described in EP 39-00147105-015-98 "Rules overhaul of the main oil pipelines", Ufa, IPTER, 1998, p.7-8 (p), 163 (rieb), 164-165 (1,2, PP, 3, 4, 6) (prototype attached) and "Machine for removal of soil from under the oil(gas)pipelines" in patent No. 2146784 (prototype), IPC F 16 L 1/028, publ. bull. from No. 8, 20 03.2000.

In accordance with the described manner at the opening of the pipeline, first remove the upper fertile layer of soil with a bulldozer, then using a shovel excavator develop lateral trench depth below the bottom of the pipe, symmetrical relative to the longitudinal axis of the pipeline, manually remove the soil directly from the pipeline, and the removal of soil from under the pipeline to produce a device for digging.

However, this method of opening limits the pace line work performance of two single-bucket excavators, as the more shovel excavators for opening the pipeline to apply it is impossible. The use of machines of continuous action to increase the Oia momentum is limited by the terrain and ground conditions.

The objective of the invention is to increase the rate of Stripping works by applying new technology and machinery for the implementation of this technology.

This object is achieved in that in the proposed method, including removal of the top layer of soil with a bulldozer, the development of lateral trenches with the removal of the soil in the side dumps using a single bucket excavators, development of lateral trenches carried out in stages: initially below the horizontal axial plane of the pipe not more than a quarter of its outer diameter with a single bucket excavators, and then at the open part of the pipeline is mounted Stripping machine, deepen side of the trench working bodies Stripping machine below the bottom of the pipe and continue the continuous opening of the pipeline shovels and Stripping machine during its progressive movement with the development of lateral trenches and removing the soil in the side dumps with transporting devices Stripping machine.

For implementing the method used Stripping machine containing the frame and undercarriage bogies, having clamps for piping support elements and the mechanism of translational movement, working bodies, symmetrically placed on either side of the vertical axis of the machine, in which each working body done the n in the form of a vertically arranged rotor, having a frame fixed to the frame of the machine, provided with a rotation drive device for removal of the substrate in a lateral blade, made in the form of a conveyor, and adooorable set with inner and outer sides of the rotor, and the inner adooorable installed with the possibility of removal of the substrate from the surface of the pipeline before running the truck, and external - with adjustable tilt angle in the vertical plane.

In addition, to prevent damage to the pipe when installing the machine on the pipe frame with ends fitted symmetrically to the vertical telescopic support rods can be locked down their positions, the distance between them is not less than the diameter of the pipeline.

For cleaning the inner surface of the bucket body work machine equipped with drive cleaning device.

Advantages of the method and Stripping machine for its implementation, its design features are outlined below and illustrated by the drawings, where:

- figure 1 shows a diagram of the opening of the pipeline used in the present method (prototype);

- figure 2 shows a diagram of the opening of the pipeline of the proposed method;

- figure 3 is a front view of the machine, mounted on a pipe;

- figure 4 is a side view on a machine (rotary working body srvc what UPE transparent).

The currently used method of opening the pipeline depicted in figure 1 and includes: removal of top fertile layer (zone I) a bulldozer, then the top layer and sides of the trench (area II) develop the shovel to remove the soil in the plow to a depth below the bottom of the pipe enough to fit under the intake pipe machine (or device for digging and soil removed from under the pipeline, manually remove the soil directly in the pipeline and under the pipeline (zone III) excavating machine or device for digging).

The proposed method (figure 2) and the opening of the pipeline when it is used is as follows.

As in the currently accepted method, first remove the top (fertile) layer using a bulldozer (zone I), further development of lateral trenches carried out in stages: initially below the horizontal axial plane of the pipe not more than a quarter of its outer diameter with a single bucket excavator (zone II). The specified depth of development needed to accommodate grips Stripping machine. Next, the side of the trench develop mounted on the exposed part of the pipeline Stripping machine driven translational movement by pipeline (area IIA), equipped with a rotary working the bodies deepening the side of the trench below the bottom of the pipe. After continue continuous opening of the pipeline shovels and Stripping machine, in which the Stripping machine moves through the pipeline and develops the side of the trench. Remove the soil in the side dumps carry out transporting device rotary working body Stripping machine. Remaining under the pipeline soil (zone III) develop and remove the known method and device.

Stripping machine for implementing the method of opening the pipeline contains a frame 1, provided with supporting elements - sliders 1, 3 translational mechanism to move the machine along the pipe 4 to the road trucks 5. The carriages 5 are equipped with grippers 6 of the pipe 4. The traveling trolley 5 is installed electrotherapist 7. Stripping machine is working bodies, vertically arranged rotor 8 with the rotation drive 9, placed on both sides of the vertical axis of the machine. Each of the rotors is provided with a frame 10. The frame 10 of the rotor connected to the frame 1 of the machine.

Inside the rotor 8 is fixed device for removal of the substrate in the blade, preferably in the form of conveyors 11. The inner and outer sides of the rotor 8 is installed adooorable 12 and 13. Internal adooorable 12 is fixed with the possibility of the of ontact with the pipe 4 and its cleanup before running the truck 5, and outer 13 is fixed with adjustable tilt angle in the vertical plane to obtain the corresponding profile of the trench depending on soil conditions.

Frame 1 Stripping machine the ends provided with symmetrically placed vertical support rods 14, the distance between which is not less than the outer diameter of the pipe 4, which eliminates the possibility of damage to the pipe 4 when installed and the depth of the machine. Rod 14 is telescopic with the ability to regulate their length vertically and fixing in position.

To avoid build-up of soil in the bucket rotor 8 provided with a driven treatment devices (not shown).

Does Stripping machine according to the above method as follows.

After opening the pipeline 4 shovels to a depth necessary to accommodate the grippers 6 Stripping machine for pipeline 4, namely below the horizontal axial plane is not more than a quarter of its outer diameter, mounted Stripping machine on the pipe 4 with the included drives conveyors 11 and the rotor 8. This extended rod 14 to prevent damage to the pipeline 4 rotors 8. Before placing the machine on the floaters 2 with detent rod 14 includes a drive grippers 6 of the pipe 4 and the drive mechanism 3 translational what about the movement of the machine in line 4, continuing the opening of the pipe 4 with the development of lateral trenches to a depth below the bottom of the pipe 4. The slope of the exterior of adooorable 13 is determined depending on soil density.

From the buckets of the rotor 8, the soil is unloaded onto the conveyors 11 and sent to the dump. The treatment device within the rotor 8 removes the remaining buckets of soil, which is poured in buckets and placed on the conveyor 11.

Stripping machine provides continuous development of lateral trenches. The ground from under the pipeline is removed known excavating machine that is installed after Stripping.

The application of the Stripping machine of the described construction allows to increase the rate of opening of the pipeline by reducing the amount of work performed inefficient shovels, as well as by reducing cycle digging.

1. The way the opening of the pipeline, including the removal of the top layer of soil with a bulldozer, the development of lateral trenches with the removal of the soil in the side dumps using a single bucket excavators, characterized in that the development of lateral trenches carried out in stages: initially below the horizontal axial plane of the pipe not more than a quarter of its outer diameter with a single bucket excavators, and then at the open part of the pipeline mo which can be carried on Stripping machine, deepen side of the trench working bodies Stripping machine below the bottom of the pipe and continue the continuous opening of the pipeline shovels and Stripping machine during its progressive movement with the development of the lateral trench and remove soil to the side dumps with transporting devices Stripping machine.

2. Stripping machine for implementing the method according to claim 1, containing a frame and undercarriage bogies, having clamps for piping support elements and the mechanism of translational movement, working bodies, symmetrically placed on either side of the vertical axis of the machine, characterized in that the working body in the form of a vertically arranged rotor having a frame fixed to the frame of the machine, provided with a rotation drive device for removal of the substrate in a lateral blade, made in the form of a conveyor, and adooorable set with inner and outer sides of the rotor, and the inner adooorable installed with the possibility of removal of the substrate from the surface of the pipeline before running the truck, and external - with adjustable tilt angle in the vertical plane.

3. Stripping machine according to claim 2, characterized in that its frame with the ends provided with symmetrically placed vertical rest p / the practical support rods can be locked down their positions, the distance between them is not less than the diameter of the pipeline.



 

Same patents:

FIELD: construction engineering; erection of underground pipe lines in permafrost soils, in bogs and in flooded and marshy areas.

SUBSTANCE: proposed polymer container ballasting unit has two distance rigidity frames located on both sides from pipe line, reservoirs made from polymer commercial cloth and filled soil which are secured to said frames, anti-erosion partitions and upper and lower weighting belts. Distance rigidity frames are curvilinear in form and their height exceeds diameter of pipe line being ballasted. Bend of each frame is made at obtuse angle and lower part of each frame is inclined towards pipe line relative to trench bottom. Polymer commercial cloth laid along pipe line makes distance frame rest against ground of trench bottom both in filling the reservoirs with soil and at action of pushing-out load.

EFFECT: extended functional capabilities.

3 cl, 1 dwg

FIELD: pipe line transport; major repair of pipe lines.

SUBSTANCE: proposed method includes introducing the front end of pipe into damage pipe and forming hermetic cavity in inter-pipe space; then, pressure air (gas) is charged into hermetic cavity for motion of new pipe inside damaged pipe, after which piston is fitted at end of new pipe and detachable flange is connected to rear end of damaged pipe; motion of new pipe is effected by periodic charging of air into hermetic cavities; each hermetic cavity is bounded by piston and seal.

EFFECT: reduction of tractive force.

5 dwg

FIELD: construction engineering; erection of pipe lines in permafrost soils at alternating terrain.

SUBSTANCE: trench in smooth terrain and in sections cut by hydrographic net is dug in active layer at depth sufficient for location of upper generatrix of pipe line above level of daily level. Prior to laying the pipe line, bottom walls and berms of trench are lined with cloth of non-woven synthetic material. backfill soil is placed in ballasting polymer panel-type devices or in ballasting polymer container-type units suspended from pipe line. Anti-erosion partitions made from non-woven synthetic material are formed in sloping sections together with funnel whose neck is located downward of water flow embracing the pipe line at specified clearance between neck and pipe line. Funnel is formed by covering the natural slope of backfill soil by free lower edge of non-woven synthetic material with ballasting polymer panel-type or ballasting polymer container-type devices placed on lower portion of funnel followed by subsequent removal of embankment protecting the pipe line. As far as sections of route cut by hydrographic network are concerned, anti-erosion partitions are formed in trench at transients with opposite slopes of microterrain; anti-erosion partitions are made from anti-erosion cloths and backfill soil is placed n soil-filled weighting materials attached to pipe line. At low points where opposite sections cross, water pass or water bypass structure is formed in trench.

EFFECT: enhanced reliability; reduced scope of earth-moving work; enhanced stability of pipe line in horizontal plane.

9 cl, 8 dwg

FIELD: construction engineering; erection of pipe lines in thawing permafrost soils and in flooded areas.

SUBSTANCE: proposed method includes ditching at trench with widened areas located at definite distances and pipe line is laid on bottom of trench. Pipe line is covered with flexible rugs and bottom of trench at widened areas is also covered with rugs; edges of rugs are fastened in widened areas and trench is filled. Used as anchor member are cylindrical textile containers placed in lugs of flexible rugs in parallel with pipe line and filled with soil. Prior to fastening the edge sections of flexible rugs, each of them is tightened at fixation of tension; preliminary tension of edge sections is effected during filling the widened areas and trench soil ensuring contact of flexible rugs with bottom of widened areas and trench. Filling the widened areas and trench is performed in direction towards pipe line, symmetrically relative to it.

EFFECT: enhanced reliability of attachment of pipe line at 0required marks.

13 cl, 4 dwg

FIELD: construction, applicable for trenchless laying and replacement of underground pipe-lines.

SUBSTANCE: a reciprocating striker is positioned in the casing of the pneumatic percussion mechanism. The air-distributing system of the mechanism includes the front and rear working chambers, inlet and exhaust valves and a fixture for closing and opening of the exhaust channels made in the form of a spring-loaded end face stopper coupled to a tractive member. At actuation of the pneumatic percussion mechanism, before the supply of compressed air, the exhaust channels are closed, they are opened after the inner cavities of the pneumatic percussion mechanism are filled with compressed air.

EFFECT: provided automatic cyclic action of the pneumatic percussion mechanism.

3 cl, 3 dwg

The invention relates to construction and is used for trenchless installation and replacement of underground pipelines

The invention relates to the construction and relates to underground pipeline installation for areas with active seismotectonic zones

The invention relates to pipeline transport and used for the construction and operation of pipelines

The invention relates to the construction work

The invention relates to the construction and operation of pipelines in difficult climatic conditions of the North, in ndonesian giving erratic rainfall soils

FIELD: construction, applicable for trenchless laying and replacement of underground pipe-lines.

SUBSTANCE: a reciprocating striker is positioned in the casing of the pneumatic percussion mechanism. The air-distributing system of the mechanism includes the front and rear working chambers, inlet and exhaust valves and a fixture for closing and opening of the exhaust channels made in the form of a spring-loaded end face stopper coupled to a tractive member. At actuation of the pneumatic percussion mechanism, before the supply of compressed air, the exhaust channels are closed, they are opened after the inner cavities of the pneumatic percussion mechanism are filled with compressed air.

EFFECT: provided automatic cyclic action of the pneumatic percussion mechanism.

3 cl, 3 dwg

FIELD: construction engineering; erection of pipe lines in thawing permafrost soils and in flooded areas.

SUBSTANCE: proposed method includes ditching at trench with widened areas located at definite distances and pipe line is laid on bottom of trench. Pipe line is covered with flexible rugs and bottom of trench at widened areas is also covered with rugs; edges of rugs are fastened in widened areas and trench is filled. Used as anchor member are cylindrical textile containers placed in lugs of flexible rugs in parallel with pipe line and filled with soil. Prior to fastening the edge sections of flexible rugs, each of them is tightened at fixation of tension; preliminary tension of edge sections is effected during filling the widened areas and trench soil ensuring contact of flexible rugs with bottom of widened areas and trench. Filling the widened areas and trench is performed in direction towards pipe line, symmetrically relative to it.

EFFECT: enhanced reliability of attachment of pipe line at 0required marks.

13 cl, 4 dwg

FIELD: construction engineering; erection of pipe lines in permafrost soils at alternating terrain.

SUBSTANCE: trench in smooth terrain and in sections cut by hydrographic net is dug in active layer at depth sufficient for location of upper generatrix of pipe line above level of daily level. Prior to laying the pipe line, bottom walls and berms of trench are lined with cloth of non-woven synthetic material. backfill soil is placed in ballasting polymer panel-type devices or in ballasting polymer container-type units suspended from pipe line. Anti-erosion partitions made from non-woven synthetic material are formed in sloping sections together with funnel whose neck is located downward of water flow embracing the pipe line at specified clearance between neck and pipe line. Funnel is formed by covering the natural slope of backfill soil by free lower edge of non-woven synthetic material with ballasting polymer panel-type or ballasting polymer container-type devices placed on lower portion of funnel followed by subsequent removal of embankment protecting the pipe line. As far as sections of route cut by hydrographic network are concerned, anti-erosion partitions are formed in trench at transients with opposite slopes of microterrain; anti-erosion partitions are made from anti-erosion cloths and backfill soil is placed n soil-filled weighting materials attached to pipe line. At low points where opposite sections cross, water pass or water bypass structure is formed in trench.

EFFECT: enhanced reliability; reduced scope of earth-moving work; enhanced stability of pipe line in horizontal plane.

9 cl, 8 dwg

FIELD: pipe line transport; major repair of pipe lines.

SUBSTANCE: proposed method includes introducing the front end of pipe into damage pipe and forming hermetic cavity in inter-pipe space; then, pressure air (gas) is charged into hermetic cavity for motion of new pipe inside damaged pipe, after which piston is fitted at end of new pipe and detachable flange is connected to rear end of damaged pipe; motion of new pipe is effected by periodic charging of air into hermetic cavities; each hermetic cavity is bounded by piston and seal.

EFFECT: reduction of tractive force.

5 dwg

FIELD: construction engineering; erection of underground pipe lines in permafrost soils, in bogs and in flooded and marshy areas.

SUBSTANCE: proposed polymer container ballasting unit has two distance rigidity frames located on both sides from pipe line, reservoirs made from polymer commercial cloth and filled soil which are secured to said frames, anti-erosion partitions and upper and lower weighting belts. Distance rigidity frames are curvilinear in form and their height exceeds diameter of pipe line being ballasted. Bend of each frame is made at obtuse angle and lower part of each frame is inclined towards pipe line relative to trench bottom. Polymer commercial cloth laid along pipe line makes distance frame rest against ground of trench bottom both in filling the reservoirs with soil and at action of pushing-out load.

EFFECT: extended functional capabilities.

3 cl, 1 dwg

FIELD: laying or reclaiming pipes.

SUBSTANCE: method includes removing upper layer of spoil, developing side trench with disposal the spoil by damping. The development of side trenches is performed step-by-step. The stripped trench is provided with stripping machine, the side trench are deepened by the working members of the stripping machine below the bottom of the pipeline and pipeline is continuously stripped by trenching machine and stripping machine when it moves forward. The stripping machine has frame with running carriages, clamps, supporting members and mechanism for forward motion.

EFFECT: enhanced efficiency.

3 cl, 4 dwg

FIELD: construction.

SUBSTANCE: pipeline is laid on the concave part of the longitudinal section of the trench bottom on the layer of soft soil and is locked by filling one or two layers of soil with compacting. Screw vertical anchors and load-carrying belts are then mounted. Before filling the trench, the space between the belt and pipeline is provided with a cloth of unwoven synthetic material.

EFFECT: enhanced reliability of pipeline locking.

4 dwg

FIELD: pipeline transport.

SUBSTANCE: flexible pipeline comprises several pulp lines provided with chambers with ball check valves and interconnected through piping diaphragms. The outer surface of the pulp line is provided with a displacement device for movement along the pipeline. The sections of pulp lines receive shell made of layers of syntactic and polyurethane, the ratio of thicknesses of which is (10-4):1. The displacement device affects the piping diaphragm, pumps hydraulic mixture from the bottom section to the next one which is arranged above the check valve, and moves along the outer side of the pulp line to the next piping diaphragm mounted above.

EFFECT: expanded functional capabilities.

3 dwg

FIELD: construction.

SUBSTANCE: pipeline has triply connected supports mounted on the stable sections above and under the slope subject to creep, one connected supports arranged over the subject to creep slope, and deformation compensator. The distance between the upper support and site of the deformation compensator arranged below the slope subject to creep is determined from the formula proposed.

EFFECT: enhanced reliability of the pipeline.

2 dwg

FIELD: construction.

SUBSTANCE: working member comprises rotors provided with teeth arranged symmetrically with respect to the axis of pipeline and provided with drive and mechanism for bringing the rotors together and moving them apart. Each rotor is provided with cleaning device which is arranged behind the rotor and secured to the unmovable segment of the working member for keeping it unmovable or permitting rotation. The cleaning members permanently co-operate with the outer side of the rotor.

EFFECT: enhanced efficiency.

1 dwg