Polymer container ballasting unit

FIELD: construction engineering; erection of underground pipe lines in permafrost soils, in bogs and in flooded and marshy areas.

SUBSTANCE: proposed polymer container ballasting unit has two distance rigidity frames located on both sides from pipe line, reservoirs made from polymer commercial cloth and filled soil which are secured to said frames, anti-erosion partitions and upper and lower weighting belts. Distance rigidity frames are curvilinear in form and their height exceeds diameter of pipe line being ballasted. Bend of each frame is made at obtuse angle and lower part of each frame is inclined towards pipe line relative to trench bottom. Polymer commercial cloth laid along pipe line makes distance frame rest against ground of trench bottom both in filling the reservoirs with soil and at action of pushing-out load.

EFFECT: extended functional capabilities.

3 cl, 1 dwg

 

The invention relates to the construction and may find application in the construction of pipelines for various purposes in terms of the distribution of permafrost, crossing swamps, and flooded and swampy areas.

Known to fill with soil polymercontaining representing disposable on either side of the pipeline and interconnected capacity, made in the form of a U-shaped filler, the walls of which are made of non-woven synthetic material, impregnated with a hardening polymer resin, giving the cavity polymercontaining the necessary strength and rigidity (see THE 2296-001-00158631-97). Thus the top of the power belt of the product preserves the shape of the container when the backfill soil.

Weights textile container type (KG), produced by THE 102-588-91 represent two filled with mineral soil closed shell, made in the form of cylinders stacked on both sides of the pipeline construction, narashima interconnected in the manufacture of soft cloth.

Filled with mineral pound polymercontaining type CDP-f formed directly in the trench over laid in the design position of the pipeline (see Additions and changes to the VSN 39-1.9-003-98 - Notice No. 1) contains placed on both sides of the negatives is soft capacity, facing the slopes elongated wall panels which during Assembly of the container mounted on the slopes or berm trench, and filling the containers with soil placed over the pipeline, and is also provided with locking strips, providing the fastening of panels over the pipe, and removable or inventory stiffeners required when mounting the design and filling of soil.

The closest technical solution of the present invention adopted for the prototype, is a polymeric container ballasting device - PCBU (see VSN 39-1.9-003-98 clause 2.2, Fig. 3), containing two placed on each side of the pipeline rectangular spacer frame rigidity, resting on the pipe in the region of the middle formative, bonded with them and fill-pound capacity, from the technical panels of polymeric fabric, protivomaskitnye walls, and upper and lower cargo tape.

Analysis of the above structures leads to the conclusion that each of them has some disadvantages, namely:

- have a high cost, have a negative impact (PCBU) on the insulation coating of the pipeline during the entire period of its operation;

is quite difficult to manufacture and install;

- require (KG, PCBU) special requirements for RA is developing the trench.

The above allows to conclude that it is necessary to develop design ballasting device devoid of the above disadvantages.

For solving the problem, we propose a new polymercontaining ballasting device containing two spacer curved frame rigidity height greater than the diameter Ballesteros pipeline and ensuring their bearing on the bottom of the trench, and the maximum value of the soft capacity, educated bonded together protivomaskitnye septa and placed along the tube panels of the polymer technical fabric, mounted on the spacer part, and the bending frame is made at an obtuse angle, and the bottom part is placed with a slope towards the bottom of the trench in the side of the pipe, providing a bearing spacer frame on the ground as when filling the containers with soil, and the impact on the pipeline buoyancy load.

Spacer, curved frame stiffness made precast or in-situ, where they bend strengthened, and the number of upper and lower freight tapes can reach three or four.

The invention is illustrated in the drawing, which shows a General view polymercontaining ballasting device, where:

1 - pipeline;

2 - spacer curved frame stiffness;

3 - technical capacity of the polymer fabric;

4 - firming cover on the spacer frame;

5 - top cargo tape (bottom tape not shown);

6 - mineral soil backfill.

Manufacturing and Assembly polymercontaining ballasting device is carried out in three stages:

- made of polymer technical fabrics are manufactured tanks construction, the upper and lower cargo tape;

- produced and isolated (if required) spacer curved frame stiffness;

- installation (Assembly) device in the base (factory) or trust conditions.

Polymercontaining ballasting device is installed on the pipeline and works as follows.

Using a special beam or bridge inventory collected on the berm trench device installed on the pipeline without distortions so that the spacer curved frame stiffness rested on the bottom of the trench.

After the unit is installed in the trench for the pipeline of its capacity filled with soil using a shovel or bucket wheel excavator at a height exceeding the diameter Ballesteros pipe 15-20 see the displacement of the pipe relative to the longitudinal axis of the trench filling of the containers is performed by the excavator in the following sequence: first fu is t is poured into the container, spacer frame which rests on the slope of the trench in the lower part thereof, the bent portion, and then in the opposite capacity.

Final backfilling of the trench in the areas of installation polymercontaining ballasting devices can be implemented by a bulldozer.

When exposed to the pipeline buoyancy of the spacer frame devices rely mainly on pound the bottom of the trench, and ballasting effect on the pipe has not only filled the tank the pound, but a pound of backfill over them.

Polymercontaining ballasting device provides reliable ballast pipelines for various purposes, it has no negative effect on the insulation coating of the pipe, allows to simplify the technology of Assembly and installation, as well as to reduce the cost of ballast pipelines.

1. Polymercontaining ballasting device containing two placed on each side of the pipeline spacer frame stiffness, bonded with them and fill the soil capacity of the polymer panels technical fabrics protivomaskitnye walls, and upper and lower cargo tape, characterized in that the spacer frame stiffness is made of a curved shape with a height greater than the diameter Ballesteros pipeline, bending each frame stiffness done the n at an obtuse angle, and the lower part of each frame is placed with a slope in the direction of the pipeline in relation to the bottom of the trench, while placed along the pipeline cloth polymeric technical fabrics provide bearing spacer under the bottom of the trench as when filling the containers with soil, and the impact on the pipeline buoyancy load.

2. The device according to claim 1, characterized in that the spacer frame stiffness is movable.

3. The device according to claim 1 or 2, characterized in that the spacer frame stiffening bends provided with reinforcing plates or made in the form of the farm.



 

Same patents:

FIELD: pipe line transport; major repair of pipe lines.

SUBSTANCE: proposed method includes introducing the front end of pipe into damage pipe and forming hermetic cavity in inter-pipe space; then, pressure air (gas) is charged into hermetic cavity for motion of new pipe inside damaged pipe, after which piston is fitted at end of new pipe and detachable flange is connected to rear end of damaged pipe; motion of new pipe is effected by periodic charging of air into hermetic cavities; each hermetic cavity is bounded by piston and seal.

EFFECT: reduction of tractive force.

5 dwg

FIELD: construction engineering; erection of pipe lines in permafrost soils at alternating terrain.

SUBSTANCE: trench in smooth terrain and in sections cut by hydrographic net is dug in active layer at depth sufficient for location of upper generatrix of pipe line above level of daily level. Prior to laying the pipe line, bottom walls and berms of trench are lined with cloth of non-woven synthetic material. backfill soil is placed in ballasting polymer panel-type devices or in ballasting polymer container-type units suspended from pipe line. Anti-erosion partitions made from non-woven synthetic material are formed in sloping sections together with funnel whose neck is located downward of water flow embracing the pipe line at specified clearance between neck and pipe line. Funnel is formed by covering the natural slope of backfill soil by free lower edge of non-woven synthetic material with ballasting polymer panel-type or ballasting polymer container-type devices placed on lower portion of funnel followed by subsequent removal of embankment protecting the pipe line. As far as sections of route cut by hydrographic network are concerned, anti-erosion partitions are formed in trench at transients with opposite slopes of microterrain; anti-erosion partitions are made from anti-erosion cloths and backfill soil is placed n soil-filled weighting materials attached to pipe line. At low points where opposite sections cross, water pass or water bypass structure is formed in trench.

EFFECT: enhanced reliability; reduced scope of earth-moving work; enhanced stability of pipe line in horizontal plane.

9 cl, 8 dwg

FIELD: construction engineering; erection of pipe lines in thawing permafrost soils and in flooded areas.

SUBSTANCE: proposed method includes ditching at trench with widened areas located at definite distances and pipe line is laid on bottom of trench. Pipe line is covered with flexible rugs and bottom of trench at widened areas is also covered with rugs; edges of rugs are fastened in widened areas and trench is filled. Used as anchor member are cylindrical textile containers placed in lugs of flexible rugs in parallel with pipe line and filled with soil. Prior to fastening the edge sections of flexible rugs, each of them is tightened at fixation of tension; preliminary tension of edge sections is effected during filling the widened areas and trench soil ensuring contact of flexible rugs with bottom of widened areas and trench. Filling the widened areas and trench is performed in direction towards pipe line, symmetrically relative to it.

EFFECT: enhanced reliability of attachment of pipe line at 0required marks.

13 cl, 4 dwg

FIELD: construction, applicable for trenchless laying and replacement of underground pipe-lines.

SUBSTANCE: a reciprocating striker is positioned in the casing of the pneumatic percussion mechanism. The air-distributing system of the mechanism includes the front and rear working chambers, inlet and exhaust valves and a fixture for closing and opening of the exhaust channels made in the form of a spring-loaded end face stopper coupled to a tractive member. At actuation of the pneumatic percussion mechanism, before the supply of compressed air, the exhaust channels are closed, they are opened after the inner cavities of the pneumatic percussion mechanism are filled with compressed air.

EFFECT: provided automatic cyclic action of the pneumatic percussion mechanism.

3 cl, 3 dwg

The invention relates to construction and is used for trenchless installation and replacement of underground pipelines

The invention relates to the construction and relates to underground pipeline installation for areas with active seismotectonic zones

The invention relates to pipeline transport and used for the construction and operation of pipelines

The invention relates to the construction work

The invention relates to the construction and operation of pipelines in difficult climatic conditions of the North, in ndonesian giving erratic rainfall soils

The invention relates to the construction and can be used for the passage of the trench pipeline in frozen soils

FIELD: construction, applicable for trenchless laying and replacement of underground pipe-lines.

SUBSTANCE: a reciprocating striker is positioned in the casing of the pneumatic percussion mechanism. The air-distributing system of the mechanism includes the front and rear working chambers, inlet and exhaust valves and a fixture for closing and opening of the exhaust channels made in the form of a spring-loaded end face stopper coupled to a tractive member. At actuation of the pneumatic percussion mechanism, before the supply of compressed air, the exhaust channels are closed, they are opened after the inner cavities of the pneumatic percussion mechanism are filled with compressed air.

EFFECT: provided automatic cyclic action of the pneumatic percussion mechanism.

3 cl, 3 dwg

FIELD: construction engineering; erection of pipe lines in thawing permafrost soils and in flooded areas.

SUBSTANCE: proposed method includes ditching at trench with widened areas located at definite distances and pipe line is laid on bottom of trench. Pipe line is covered with flexible rugs and bottom of trench at widened areas is also covered with rugs; edges of rugs are fastened in widened areas and trench is filled. Used as anchor member are cylindrical textile containers placed in lugs of flexible rugs in parallel with pipe line and filled with soil. Prior to fastening the edge sections of flexible rugs, each of them is tightened at fixation of tension; preliminary tension of edge sections is effected during filling the widened areas and trench soil ensuring contact of flexible rugs with bottom of widened areas and trench. Filling the widened areas and trench is performed in direction towards pipe line, symmetrically relative to it.

EFFECT: enhanced reliability of attachment of pipe line at 0required marks.

13 cl, 4 dwg

FIELD: construction engineering; erection of pipe lines in permafrost soils at alternating terrain.

SUBSTANCE: trench in smooth terrain and in sections cut by hydrographic net is dug in active layer at depth sufficient for location of upper generatrix of pipe line above level of daily level. Prior to laying the pipe line, bottom walls and berms of trench are lined with cloth of non-woven synthetic material. backfill soil is placed in ballasting polymer panel-type devices or in ballasting polymer container-type units suspended from pipe line. Anti-erosion partitions made from non-woven synthetic material are formed in sloping sections together with funnel whose neck is located downward of water flow embracing the pipe line at specified clearance between neck and pipe line. Funnel is formed by covering the natural slope of backfill soil by free lower edge of non-woven synthetic material with ballasting polymer panel-type or ballasting polymer container-type devices placed on lower portion of funnel followed by subsequent removal of embankment protecting the pipe line. As far as sections of route cut by hydrographic network are concerned, anti-erosion partitions are formed in trench at transients with opposite slopes of microterrain; anti-erosion partitions are made from anti-erosion cloths and backfill soil is placed n soil-filled weighting materials attached to pipe line. At low points where opposite sections cross, water pass or water bypass structure is formed in trench.

EFFECT: enhanced reliability; reduced scope of earth-moving work; enhanced stability of pipe line in horizontal plane.

9 cl, 8 dwg

FIELD: pipe line transport; major repair of pipe lines.

SUBSTANCE: proposed method includes introducing the front end of pipe into damage pipe and forming hermetic cavity in inter-pipe space; then, pressure air (gas) is charged into hermetic cavity for motion of new pipe inside damaged pipe, after which piston is fitted at end of new pipe and detachable flange is connected to rear end of damaged pipe; motion of new pipe is effected by periodic charging of air into hermetic cavities; each hermetic cavity is bounded by piston and seal.

EFFECT: reduction of tractive force.

5 dwg

FIELD: construction engineering; erection of underground pipe lines in permafrost soils, in bogs and in flooded and marshy areas.

SUBSTANCE: proposed polymer container ballasting unit has two distance rigidity frames located on both sides from pipe line, reservoirs made from polymer commercial cloth and filled soil which are secured to said frames, anti-erosion partitions and upper and lower weighting belts. Distance rigidity frames are curvilinear in form and their height exceeds diameter of pipe line being ballasted. Bend of each frame is made at obtuse angle and lower part of each frame is inclined towards pipe line relative to trench bottom. Polymer commercial cloth laid along pipe line makes distance frame rest against ground of trench bottom both in filling the reservoirs with soil and at action of pushing-out load.

EFFECT: extended functional capabilities.

3 cl, 1 dwg

FIELD: laying or reclaiming pipes.

SUBSTANCE: method includes removing upper layer of spoil, developing side trench with disposal the spoil by damping. The development of side trenches is performed step-by-step. The stripped trench is provided with stripping machine, the side trench are deepened by the working members of the stripping machine below the bottom of the pipeline and pipeline is continuously stripped by trenching machine and stripping machine when it moves forward. The stripping machine has frame with running carriages, clamps, supporting members and mechanism for forward motion.

EFFECT: enhanced efficiency.

3 cl, 4 dwg

FIELD: construction.

SUBSTANCE: pipeline is laid on the concave part of the longitudinal section of the trench bottom on the layer of soft soil and is locked by filling one or two layers of soil with compacting. Screw vertical anchors and load-carrying belts are then mounted. Before filling the trench, the space between the belt and pipeline is provided with a cloth of unwoven synthetic material.

EFFECT: enhanced reliability of pipeline locking.

4 dwg

FIELD: pipeline transport.

SUBSTANCE: flexible pipeline comprises several pulp lines provided with chambers with ball check valves and interconnected through piping diaphragms. The outer surface of the pulp line is provided with a displacement device for movement along the pipeline. The sections of pulp lines receive shell made of layers of syntactic and polyurethane, the ratio of thicknesses of which is (10-4):1. The displacement device affects the piping diaphragm, pumps hydraulic mixture from the bottom section to the next one which is arranged above the check valve, and moves along the outer side of the pulp line to the next piping diaphragm mounted above.

EFFECT: expanded functional capabilities.

3 dwg

FIELD: construction.

SUBSTANCE: pipeline has triply connected supports mounted on the stable sections above and under the slope subject to creep, one connected supports arranged over the subject to creep slope, and deformation compensator. The distance between the upper support and site of the deformation compensator arranged below the slope subject to creep is determined from the formula proposed.

EFFECT: enhanced reliability of the pipeline.

2 dwg

FIELD: construction.

SUBSTANCE: working member comprises rotors provided with teeth arranged symmetrically with respect to the axis of pipeline and provided with drive and mechanism for bringing the rotors together and moving them apart. Each rotor is provided with cleaning device which is arranged behind the rotor and secured to the unmovable segment of the working member for keeping it unmovable or permitting rotation. The cleaning members permanently co-operate with the outer side of the rotor.

EFFECT: enhanced efficiency.

1 dwg