The invention relates to the operation of wells and can be used to measure and control the number of components in the production wells. The objective of the invention is to improve the accuracy of measurement. The installation includes a housing, which houses the measuring degassing unit with movable inlet pipe production wells and output pipelines gas and liquid with a controllable shut-off bodies, equipped with a device for vertical movement and connected with the power Converter into an electrical signal. The installation also contains gatschet, a pump for pumping fluid, hydraulic and electrical control systems and computing unit. The power Converter into an electric signal in the form of load cell weight S-shaped elastic element, and a device for vertical movement of the measuring degassing unit in the form of a roller, mounted on the wall of the housing and associated with the lifting device. Measuring degassing unit is equipped with a fixation device. The installation further comprises a gas purification unit associated with Asociacion and technological capacity to collect condensate, the liquid and the hygrometer, ratesonline relates to automatic control systems and can be used to measure and control the amount of gas oil and water in production wells in the oil, gas and other industries.

A known device for the measurement of production wells (and.with. The USSR 1652521, E 21 In 47/00, op. 30.05.1991 year), including a measuring unit containing horizontal-tight tank (separator) with input and output pipelines and meter weight (hydraulic power Converter into an electrical signal), in addition, the system includes a controllable shut-off bodies, hydraulic and electrical control systems and computing unit.

Known device has a low accuracy of measurement of liquid mass, in addition, it is bulky and has a complex system of control, is not responsible for the protection of equipment, labor protection and technical safety.

A known device for the measurement of production wells (U.S. Pat. RF 2059067, E 21 In 47/00, op. 27.04.1996,), comprising a measuring unit comprising a cylindrical vertical tank (separator) that is installed with the possibility of vertical movement along the alignment bearings and provided with inlet pipe wells, output pipelines gas and liquid and measuring the weight (hydraulic converters force into an electrical signal). Input is, a pump for pumping fluid, and hydraulic and electric control systems and computing unit. Hydraulic power Converter into an electrical signal (sensor type Siwarex") contains a hollow body filled with liquid, which houses the piston reaches the ball.

Known device placed in the body-the body of the all terrain vehicle.

The principle of operation of the known installation is based on the direct weighing of incoming production wells. When this product is pipe after separation in measuring capacity, where the additional gas is withdrawn from the top, measure duplicating gas and absorbed by the collector. Weight measuring capacity together with the fluid creates a force that hydraulic Converter by the impact of the piston on the fluid creates pressure on the ball, which, in turn, is converted into an electrical signal. Thus formed is a 3-level speed command via the current entries in the control system (SU). The mass of the liquid ("net") is determined as the difference between the mass of the "gross" (liquid + weight capacity) and weight capacity. The liquid is pumped from the tank by the pump and is directed to a collector. A single measurement cycle is completed and the device is to have the following disadvantages: low accuracy of the flow measurement of oil, due to poor separation of the gas in the measuring vessel (separator) in connection with a residual phenomenon of saturation pressure in the production wells with medium and high gas factor, especially in a stable oil emulsion; cyclic measurement of production wells, also affect the accuracy of the measurement; the measurement error associated with a fairly complex structure of the sensor type Siwarex" - hydraulic power Converter into an electric signal through a 3-level speed signal transmission measurement in SU; installation of metering block with a cylindrical guide in the back of a car requires a precise calculation in accordance with the center of gravity of the vehicle, otherwise there is measurement error due to friction or crushing.

Thus, the problem of accurate measurement of production wells with medium and high gas factor by improving the quality of gas separation and implementing continuous process of measuring products wells (as opposed to circular in the prototype), as well as improving the reliability of operation.

This problem is solved by the proposed system for measuring the production wells, comprising a housing in which the pipelines gas and liquid with controlled shut-off bodies equipped with a device for vertical movement and connected with the power Converter into an electrical signal, gatschet, a pump for pumping fluid, hydraulic and electrical control systems and computing unit, in which, according to the invention, the power Converter into an electric signal in the form of load cell weight S-shaped elastic element, and a device for vertical movement of the measuring degassing unit in the form of a roller, mounted on the wall of the housing and associated with the lifting device, and the above-mentioned unit is equipped with a fixation device, the installation further comprises a gas purification unit, associated with Asociacion and technological capacity to collect condensate, liquid and hygrometer placed on the liquid line from the measuring degassing unit.

Suitable measuring degassing unit to perform in the form of two D-shaped separator.

The load cell weight S-shaped elastic element, for example, the brand "tenso-M" can be attached to the top cover and connected with the upper section of the two D-shaped separator by means of the signal cable and clamps.

Usuu capacity.

Lifting device for vertical movement of the measuring degassing unit should be carried out in the form of a winch.

The gas purification unit should be carried out in the form of a horizontal separator condensate and gruppovogo device.

Means for fixing the measuring degassing unit may be in the form of the Jack associated with the support.

A pump for pumping fluid from the installation can be performed in vacuum.

The execution of the power Converter into an electric signal in the form of a load cell weight S-shaped elastic element, such as the brand "tenso-M" allows a continuous process of measuring products wells (as opposed to circular in the prototype), which increases the measurement accuracy and makes the measurement more reliable, and management is simpler.

Execution device for vertical movement of the measuring degassing unit as installed on the wall of the housing of the roller associated with a lifting device, allows to simplify the design, to increase the stability of the vehicle weight, improve reliability of operation.

Means for fixing the measuring degassing unit you want to save the e moisture (condensate, water) of the associated petroleum gas entrance to the gas meter and to reduce measurement error.

Additional pipeline for supply of chemicals and steam in technological capacity necessary for measurements of petroleum production wells. The vacuum pump is necessary for self-installation. On the attached figure shows the proposed installation.

The installation includes measuring degassing unit, which includes two l-shaped separator 1 with the upper section 2, the lifting device in the form of a winch with 3 roller 4 and the rope 5. Measuring degassing unit is suspended on the load cell weight 6,associated with the signal cable 7 and the clamps 8, attached to the upper section 2. Two-piece separator 1 is supplied by a pipe 9 with a tangential inlet wells (gas-liquid oil mixture GINS), the piping of the gas outlet 10 and the liquid 11, dividers fluid 12 and 13, as well as emergency horizontal sensor 14. Two l-shaped separator is placed on the support 15 and is provided with means recording - adjustable Jack 16. The gas purification unit includes a horizontal condensate separator 17 and gruppovoe device consisting of a desiccant 18 and n is 20, connected with the pipe 21 supply of chemicals and steam. In addition, the installation includes a gas meter 22 to determine the amount of gas placed in the gas line after a dryer 18, the valve 23 in the gas line 24, the flow meter 25 to determine the amount of fluid in the production, 26 gauge, hygrometer 27 to determine the amount of water in iconette mixture on the output line of the liquid from the separator 1, the vacuum pump 28 and the locking bodies 29-45, .. installation is placed on a frame body (not shown).

Measurement of production wells using the proposed installation is produced as follows. Installation in transportable position (i.e., two-piece l-shaped separator tucked up in the upper position by means of the winch 3 and fixed on the support 15, the load cell 6 with the signal cable 7 no load) drive up to the well and connected to the manifold 9. Then lower support 15 Jack 16 and eliminate the tightness of the rope 5 by turning the winch handle 3 so that the two l-shaped separator was suspended on the load cell 6 (i.e., give centering the load signal cable 7 to the load cell 6) and then open the valve 29. The gas / oil mixture (GGNS) from the collector wells 9 Tangen you can change, switching to another well on the Bush.

Time measuring at least 0.5-1 h with a certain frequency in minutes, including the Main purpose of the two-piece separator 1 is the maximum speed the separation of gas from oil through the tangential inlets. Maximum drying gas supplied to the measurement in the area of asociacija 22, is effected by the devices 17 and 18. Permanent pre-measurement with the least measurement error weight, continuously incoming stream GINS in the separator is produced by the load cell weight 6, and the final measurement degassed fluid - flow meter 25 with an appropriate definition of pressure, differential pressure gauge 26 and measuring the amount of moisture on the moisture meter 27. All data is transmitted to the controller SMAR (not shown). Separated from GINS gas from the upper part of the separator 1 (stage 1) is supplied by two tangential inputs into the upper section 2, after the return of the corresponding moisture (level 2) - through a tangential entry - condensate separator 17 (stage 3), then through the pressure relief valve 23 in line gas 24 - in dehumidifier gruppovogo device 18 (step 4) and partially in the drive condensate 19. Enter in the drier 18 is made also tangential. Then the gas enters us, mixed with oil and water is the liquid inside the flexible connecting pipe wikid 11 installation. All cyclic gas measurements are averaged and transmitted to the controller in the SU, where memory is filled to 32 days. Aggregated data technician takes on the printer for the weekend protocols. Drive condensate 19 is applied and fired in self-cleaning and purging of the working line measurement, 9, 10, 11, when the condensate is supplied into the process container 20 and is pumped into the reservoir by the pump 28. A relief valve 23 type CPCR-4P-25/40 triggered by exceeding the working pressure in the gas line or in the cavity of the installation for the emission in spectrolite - damper (not shown). The safety valve is adjusted to the maximum pressure. The vacuum pump gear 28 can also be activated when the emergency exceeds the operating pressure of the liquid in the separator 1, the sensor 14 automatically turns the pump 28 for pumping fluid lines 11, 12, opening of the electric valve or other electric valves for pumping. Pumped liquid from the separator 1 through line 11 to the flow meter 25 and then sent to wikid installation and mingling with self-cleaning production lines. After work Testaccio weight 6 with the signal cable 7 is released from the load by means of the roller 4, the rope 5, the hoisting winch 3 and fix the upper section of the lever of the clamp 8, and two l-shaped separator by raising a support 15 Jack 16. Unit is ready to move.

The proposed installation can increase the accuracy of measuring the amount of gas and liquid (including water content in oil products with low, middle and high gas factor, as well as in high-wax oils. The installation allows a continuous and systematic control in the measurement of production wells. In addition, it is compact and reliable in operation, can be performed both stationary and transportable, and can be used on all oil fields with a total flow rate of 600 t/d of fluid and 600 000 nm3/day of gas.

Claims

1. The measuring unit for wells, comprising a housing, which houses the measuring degassing unit with movable inlet pipe production wells and output pipelines gas and liquid with a controllable shut-off bodies, equipped with a device for the pumping of liquid, hydraulic and electrical control systems and computing unit, wherein the power Converter into an electric signal in the form of load cell weight S-shaped elastic element, and a device for vertical movement of the measuring degassing unit in the form of a roller, mounted on the wall of the housing and associated with the lifting device, and the above-mentioned unit is equipped with a fixation device, the installation further comprises a gas purification unit associated with Asociacion and technological capacity to collect condensate, liquid and hygrometer placed on the liquid line from the measuring degassing unit.

2. Installation under item 1, characterized in that the measuring degassing unit is made in the form of two D-shaped separator.

3. Installation under item 2, characterized in that the load cell weight S-shaped elastic element, for example, the brand "tenso-M" attached to the top cover and connected with the upper section of the two D-shaped separator by means of the signal cable and clamps.

4. Installation under item 1, characterized in that it further comprises a pipeline for supply of chemicals and steam in technology is unique displacement measuring degassing unit is made in the form of a winch.

6. Installation under item 1, characterized in that the gas purification unit is made in the form of a horizontal separator condensate and gruppovogo device.

7. Installation under item 1, characterized in that the means for fixing the measuring degassing unit is made in the form of a Jack associated with support.

8. Installation under item 1, characterized in that a pump for pumping fluid from the installation is made vacuum.

 

Same patents:

The invention relates to the operation of wells and can be used in the measurement and control of flow rate

The invention relates to oil and gas industry and can be used for quality control of construction of wells, methods of stimulation and other activities associated with oil and gas production

The invention relates to the oil and gas industry, namely to control the development of oil and gas fields, in particular to methods for assessing the integrity of the production casing of the injection wells equipped with tubing
The invention relates to the oil industry and can be used in the development of fields with long lifetime and determination of the working thickness of the layers over the entire lifetime

The invention relates to the oil and gas industry, in particular to methods for estimation of leakages in the production string, equipped with tubing (tubing)

The invention relates to systems of control and accounting for oil extraction

Borehole flowmeter // 2205952
The invention relates to the exploration wells and can be used to build a profile of intake or absorption in wells with low productivity

The invention relates to the oil and gas industry and can be used in other sectors of the economy

The invention relates to the oil industry and can be used for measuring flow rate

The invention relates to the field of geophysical research and can be used to determine the technical condition of the wells and pathways compositions by the method of radioactive logging using labeled substances

FIELD: oil and gas extractive industry.

SUBSTANCE: device has body with ports in lower and upper ends, main sensitive elements in form of turbines and packing elements, placed in pairs at body ends, side port made in body between main sensitive elements and converter, connected to surface equipment. In side pipe, mounted inside the body between main sensitive elements, additional sensitive element is placed in form of turbine and thermal sensor. Lower end of side pipe is connected to side port. Diameter of turbine of additional sensitive element is less than diameter of turbines of main sensitive elements. Converter is a control block mounted above body including sleeves locator and electronic microprocessor device.

EFFECT: higher precision.

1 dwg

FIELD: oil and gas production.

SUBSTANCE: invention relates to gas-liquid systems coming from oil production wells. Mixture is separated into liquid and gas in separator. Liquid is periodically accumulated in separator container and then displaced with gas. During this operation, differential pressure for liquid reaching its lower and upper recorded levels and time required for filling recorded volumes are measured as well as absolute pressure and temperature of gas in container. Liquid flow value expressed in weight is calculated using special mathematical dependence. At oil field, liquid and gas enter separator from preliminary gas intake installation or from the first separation step.

EFFECT: increased accuracy of measurement due to avoided gas density registration and excluded necessity of using strictly cylindrically-shaped measuring container.

1 dwg

FIELD: oil extractive industry.

SUBSTANCE: mixture is separated on liquid and gas in separator. Liquid is periodically collected and forced away by gas while measuring absolute pressure and gas temperature in separator tank near upper and lower fixed liquid levels, and times of forcing away of fixed liquid volume. Additionally measured are absolute pressure and temperature in moment when liquid reaches intermediate fixed level. Then liquid is forced from intermediate fixed level to lower fixed level separator is switched off from well, and mass loss of gas is calculated from provided relation. Device for realization of method consists of separator with feeding pipe, in which a three-drive valve is mounted, and draining pipe, which through said valve is connected to liquid outlet channel and to gas outlet channel. Separator is provided with sensors of temperature and pressure and sensors of upper, intermediate and lower levels, mounted in such a manner, that they separate fixed volumes between each other in separator tank, in case of equality of which calculations are simplified.

EFFECT: higher precision.

2 cl, 1 dwg

FIELD: oil and gas extractive industry.

SUBSTANCE: method includes measuring volume and denseness of fresh oil in reservoir in case of even or balanced temperature and pressure. Combined sample of fresh oil is taken from pipeline during its draining and denseness of oil and bed water and ballast content is determined. Then mass of drained oil is determined with consideration of measured parameters. Prior to draining, fresh oil from reservoir is exposed until partial separation of bed water, and its denseness is measured. During draining of fresh oil, its denseness,, volumetric share of water therein, pressure and temperature are determined. Drained oil mass and percentage of ballast is determined from given mathematical expressions. Denseness of exposed bed water is measured on basis of sample, taken after exposure of fresh oil in reservoir. Denseness of exposed bed water is measured in its flow during draining from reservoir after exposure and before draining fresh oil. Volume of fresh oil in reservoir is measured continuously by its level and data from graduating table for reservoir. Draining of combined sample of fresh oil from pipeline during its draining is performed manually or automatically in case of constant kinetic condition. After exposure of fresh oil in reservoir point samples of fresh oil are taken, additional combined sample is made thereof and denseness of fresh oil, oil and bed water and ballast percentage is determined from it, and these parameters are used when evaluating precision of determining parameters of drained oil. Measurements of denseness, volumetric water share, pressure and temperature during draining of fresh oil in flow are performed periodically with averaging of current values of measured parameters for time interval, equal to period of change of parameters of fresh oil in reservoir. Mass of bed water MW is determined from given formula.

EFFECT: higher precision.

8 cl, 1 dwg

FIELD: oil and gas extractive industry.

SUBSTANCE: method includes separating gas from liquid in the mixture. Liquid is periodically accumulated in calibrated gas separator tank with concurrent by-way of gas into collector and accumulated liquid is pushed out by gas with open pipeline used for draining gas into collector. During pushing away accumulated liquid by gas differential pressure between lower and upper pipeline points is additionally measured. Liquid flow in gas-liquid mixtures is calculated as total of flow of liquid filling calibrating tank, and flow of liquid, carried away by gas from separator, determined from given relation. Method is realized by device, which contains calibrating tank with inlet branch pipe for feeding gas-liquid mixture therein, pipeline for draining gas and pipeline for draining liquid, connected to collector through three-drive valve. Also, following are mounted in separator: level relay-sensor limiting calibrating volume, absolute temperature sensor, absolute pressure sensor and differential pressure sensor between lower and upper separator points. Between lower and upper pipeline points a sensor for measuring differential pressure is mounted. At entrance of pipeline dispersant is mounted for evening gas and liquid speeds.

EFFECT: higher precision.

2 cl, 1 dwg

FIELD: oil and gas extractive industry.

SUBSTANCE: method includes measuring average value of flow during adequately picked time for each well of group with successive - according to given program - connection of wells to measuring device and following recalculation of debit to day productiveness. At the same time the most dynamic well of group is selected on basis of one of most unstable parameters. Numeric value of relative quadratic error δ3 of average flow value m(q) is set and recorded in memory of computer, for example, industrial controller. Period of scanning for this well is determined. With same period remaining wells of the group are scanned. Scanning period for each I of them is corrected by comparison of current - actual - relative average quadratic error δmi of average flow value q1 with previously set δ3 from conditions δ≥δ3(1+K); δmi≤δ3(1-K), where K - coefficient for limiting changing range δmi, defining necessity of correction of scanning period for I well towards decrease or increase. If switching moments for measurements of two or more wells from group coincide, order of their scanning is set in accordance to decrease of productiveness of these wells.

EFFECT: higher efficiency.

2 cl, 1 ex

FIELD: oil industry.

SUBSTANCE: device comprises multiple-pass well shifting connected with bullet and terminal controller connected with the turbine flow meter and well shifting. The method comprises measuring time interval before the first pulse corresponding to the measuring cycle of the turbine flow meter and determining time interval required for synchronization of the beginning of fluid accumulation in the bullet and the end of measurements from the measuring time obtained.

EFFECT: enhanced accuracy of measurements.

2 cl, 4 dwg

FIELD: gas industry.

SUBSTANCE: device has two level comparators, two pulse generators, first, second and third active band filters, first and second piezoceramic detectors of flow pressure pulses. Output of first detector is connected to input of synchronizing low frequency amplifier, output of which is connected to input of first filter, output of which is connected to first input of scaling amplifier, output of which is connected to ADC input, output of which is connected to first input of microprocessor controller, output of which is connected to second input of scaling amplifier. Additionally provided are passive two-mode filter, switchboard and fourth filter. Output of second piezoceramic detector is connected to input of two-mode passive filter, output of which is connected to input of fourth filter, output of which is connected to inputs of third and fourth filters, outputs of which are connected to inputs of first and second level comparators, outputs of which are connected to inputs of first and second pulse generators, outputs of which are connected to first and second switchboard inputs, output of which is connected to second input of controller, second output of which is connected to third input of switchboard.

EFFECT: higher efficiency and precision.

2 dwg

FIELD: gas industry.

SUBSTANCE: device has two piezoceramic detectors of flow pressure pulses, output of first of which is connected to input of synchronizing low frequency amplifier. Output of synchronizing amplifier is connected to input of first active band filter, output of which is connected to first input of scaling amplifier, output of which is connected to input of ADC. ADC output is connected to first input of microprocessor controller. First output of controller is connected to second input of scaling amplifier. Device also has level comparator, pulse generator, second and third active band filters, while controller is made with product parameters recorders. Additionally provided are two-mode filter, switchboard and fourth active band filter. Output of second piezoceramic detector is connected to input of two-mode passive filter, output of which is connected to input of second active band filter. Output of second filter is connected to inputs of, respectively, third and fourth filters, outputs of which are connected to first and second inputs of switchboard, connected to level comparator input. Output of the latter is connected to input of pulse generator, output of which is connected to second input of controller. Second output of controller is connected to third input of switchboard.

EFFECT: higher precision.

2 dwg

FIELD: oil and gas industry.

SUBSTANCE: device has container for marked liquid lowered on geophysical cable with depressurization assemblies and driving assemblies and measuring sensors, more than one. Measuring sensors are positioned above and below researched bed range no less than one on each side. As marked liquid, ferromagnetic liquid is used, and as measuring sensors - magnetic field measuring devices.

EFFECT: lower costs, simplified construction, higher precision.