Mobile drilling rig

 

(57) Abstract:

The invention relates to the drilling technique, namely, mobile drilling rigs with high cross, intended for deep drilling, maintenance and repair of wells. The invention solves the problem of reducing the time and effort required for installation - dismantling of the rig, as well as improve the reliability of the structure during operation of the installation. The essence of the invention lies in the fact that mobile drilling installation comprising a chassis, oil rig, a device for lifting a tower in a vertical operating position, the jacks, the tower is made removable and is connected to the console platform, a hinge mounted on the frame, at least three vzaimootmenyaemy catching type hook-loop orientation and fixation of the tower, zamorozhennye upright tower when installing it on the ground. 8 C.p. f-crystals, 6 ill.

The invention relates to the drilling technique, namely, mobile drilling rigs with high cross, intended for deep drilling, maintenance and repair of wells.

Known mobile oilfield installation comprising a transport base, a tower with a lifting mechanism (see the description izobretena dimensions of the shelter, and the limited height of the tower does not allow deep drilling installation. In addition, work on the Assembly - disassembly shelter installation is time-consuming, which reduces the efficiency of its use.

The closest but the achieved technical result, taken as a prototype, is a mobile repair drilling unit (see the description of the invention to the patent of the Russian Federation 2162133, IPC E 21 7/02 from 28.03.2000 g) containing a multi-axle chassis, horizontally disposed on the frame in the transport position, the oil rig, the device for lifting a tower in a vertical operating position, the support jacks with tareley for leveling.

Constructive design of the unit provides deep drilling, however, allows the setting of several rigs using one of the transport base: the tower attached to the chassis. The use of the known drilling unit increases the time field development in terms of the sectional arrangement of the wells due to the mounting and dismantling of the tower. In addition, the use of pulley system reduces reliability.

The invention solves the problem of reducing the time and complexity to the Assembly-disassembly of Batali installation.

To achieve a technical result of the proposed mobile drilling rig containing a multi-axle chassis, horizontally disposed on the frame in the transport position, the oil rig, the device for lifting a tower in a vertical operating position, the support jacks with tareley for leveling, according to the invention, the device for lifting a tower equipped with a console platform hinged to the frame, while the tower is made removable and is connected to the console platform, at least three vzaimootmenyaemy catching type hook-loop orientation and fixation of the tower, zamorozhennye upright tower when installing it on the ground, with two hooks are located at the free end of the cantilever platform, symmetrically to the longitudinal axis of the tower, the third side console mounting platform to the frame, and the base of the tower is equipped with at least four legs, mounted with a possibility of rotation and fixation in the working and transport positions.

The hooks are made flat with maw, provided with a safety groove.

Zev made prismatic or parabolic shape. The locking groove is placed at the base of a prism or of a parabola.

Each tx2">

The cross-section of the locking groove is made mating with the locking groove of the hook.

The free end of each foot is equipped with a hydraulic cylinder with a plate for leveling removable tower.

The piston of the hydraulic cylinder is made with two rods, one of which is equipped with a safety element.

Mobile drilling rig is equipped with an additional self-propelled platform with a console platform for service rigs, hinged can be locked in the tower free end, a manipulator, a control system, pumping station, rack - drive for the drill pipe.

Distinctive features of the proposed mobile drilling rig from the well-known, is the implementation of the HSE removable, for which the rig and platform device for lifting are connected by at least three vzaimootmenyaemy catching type hook-loop orientation and fixation of the tower, zamorozhennye in a vertical position. The base of the tower is equipped with at least four power jacks, mounted with a possibility of rotation and fixation in the working and transport positions. For the viability of a mobile drilling rig, it is equipped with extra samaha and on the rig free end, a manipulator, a control system, pumping station rack-drive for the drill pipe.

The implementation of the HSE removable allows in terms of cluster location of wells to use the vehicle to transport several towers of similar design during operation of the first tower. Derrick made whole not telescopic, allowing to reduce the time of Assembly-disassembly and improve the reliability of the structure during operation of the installation.

Mobile drilling rig is illustrated by drawings, where

Fig 1 shows a General view of the installation;

in Fig.2 - tower in the transport position;

in Fig.3 - tower in limbo;

in Fig.4 - callout a;

in Fig.5 is a view of B in Fig.3;

in Fig.6 - section b-b In Fig.3.

Mobile drilling rig contains a multi-axle chassis 1, a horizontally disposed on the frame 2 oil rig 3, the device for lifting a tower 3 in a vertical position, jacks 4 tareley 5 for hanging and leveling of a multi-axle chassis 1. Tower 3 are removable, one-piece construction. Device for lifting is a two cylinder 6 connected to the console platform is informa 7 is held on the frame 2 quick release axle 10. Tower 3 and console platform 7 is connected at least three catchers type hook-loop orientation and fixation of the tower 3. Two hooks 11 are located at the free end of the cantilever platform 7, symmetrically to the longitudinal axis of the tower 3, and the third side console mounting platform 7 to the frame 2. The hooks 11 are made flat with maw prismatic or parabolic shape, provided at the base of the locking groove 12. Each loop 13 is in the form of dumbbells attached the ends to the tower 3 and is provided in the middle of the locking groove 14. The cross-section of the locking groove 14 is mated with the locking groove 12 of the hook 11. The hooks 11 and the loops 13 of Tamarasheni in a vertical position during installation of the tower 3 on the ground.

The base 15 of the tower 3 is equipped with at least four legs 16. Supports 16 hinged to the base 15 can be rotated from the hydraulic actuator 17 and fixing in working and transport positions with stop end in the housing 15. The free end of each support 16 is equipped with a hydraulic cylinder 18 with the plate 19 for leveling removable tower 3. The piston of the hydraulic cylinder 18 is made of two rods 20 and 21, one of which is equipped with a safety element 22.

Mobile drilling rig sabiendo fixed with the ability to commit to rig 3 free end, the manipulator 25, the control system 26, a pump station 27, the rack-drive 28 for drill pipe 29.

Mobile drilling rig operates as follows.

In the transport position, the tower 3 is in the horizontal position. Loop 13 towers placed the locking grooves 14 in the auxiliary grooves 12 hooks 11. Console platform 7 with respect to the frame 2 fixed axis 10. The plate 5 of the chassis 1 is fixed on the frame 2. MWV 1 approaching scheduled for drilling a borehole in reverse. Installation of tower 3 start with hanging installation on full stroke of the jacks 4 chassis 1 and leveling of pre-installing the jacks 4 plate 5. The supports 16 of the base 15 tower 3 deploy outside of the base 15, for example, at an angle of 45oand fixed in the unfolded position the ends in the housing 15. Console platform 7 is cut off from the frame 2, the axle 10. Hydraulic drive 6 turn the console platform 7 on the axis 8 relative to the lugs 9 of the frame 2 on the 90o. Using a cable-and-pulley device on the drawing conventionally not pachecano) free tower 3 from the console platform 7. Tower 3 hang loops 13 on the hooks 11 of the cantilever platform 7. When lowering the chassis 1 on the ground tower 3 TNA the AI chassis 1 ground loop 13 tower 3 disengage from the hooks 11. The chassis 1 is departing from the tower 3, and it is used as directed. To the top 3 reverse pulls additional self-propelled platform 23. Hinged cantilever pad 24 for servicing rigs 3 deploy in the direction of the tower 3 and is fixed on last free end. Set in the working position of the arm 24, through which the supply pipe 29 from the rack 28 into the well. In emergency situations (in case of breakage Flex) provides insurance of one of the rod 21 of the hydraulic cylinder 18 a safety element, such as a screw 22.

Upon completion of drilling or operating the well, the rig 3 is removed, which first disconnect the rig from 3 system activity (control system 26 and pump 27 and is removed from engagement with the platform 24 for maintenance. Additional self-propelled platform 23 will depart from the well. At the same time to the well pulls back the chassis 1. Chassis 1 install jacks 4 taralyn 5 on the ground and start hanging and leveling. In the process of putting up the chassis 1, the hooks 11 pick up the loops 13 of the tower 3 and with the further rise (up to the full stroke of the hydraulic jacks), the loops 13 are oriented relative to the hooks is Isaiah on the hooks 11 of the cantilever platform 7. Hydraulic drive 6 deploy the console platform 7 with the tower 3 in a horizontal position and fix the axle 10, after removing from the hydraulic Jack 18 of the plate 19. Then the supports 16 of the base 15 of the hydraulic actuator 17 deploying into the transport position.

1. Mobile drilling rig containing a multi-axle chassis, horizontally disposed on the frame in the transport position, the oil rig, the device for lifting a tower in a vertical operating position, the support jacks with tareley for leveling, characterized in that the device for lifting a tower equipped with a console platform, a hinge mounted on the frame, while the tower is made removable and is connected to the console platform, at least three vzaimootmenyaemy catching type hook-loop orientation and fixation of the tower, zamorozhennye upright tower when installing it on the ground, the two hooks are located at the free end of the cantilever platform, symmetrically to the longitudinal axis of the tower, the third side console mounting platform to the frame, and the base of the tower is equipped with at least four legs, mounted with a possibility of rotation and fixation in the working and transport positions.

2. Mobile m

3. Mobile drilling rig under item 2, characterized in that the Zev made prismatic or parabolic shape.

4. Mobile drilling rig under item 2, wherein the locking groove is placed at the base of a prism or of a parabola.

5. Mobile drilling rig under item 1, characterized in that each loop is made in the form of dumbbells attached the ends to the tower and is provided in the middle of the locking groove.

6. Mobile drilling rig under item 5, characterized in that the cross section of the locking groove is made mating with the locking groove of the hook.

7. Mobile drilling rig under item 1, characterized in that the free end of each foot is equipped with a hydraulic cylinder with a plate for leveling removable tower.

8. Mobile drilling rig under item 7, characterized in that the piston of the hydraulic cylinder is made with two rods, one of which is equipped with a safety element.

9. Mobile drilling rig under item 1, characterized in that it is equipped with advanced self-propelled platform with a console platform for service rigs, hinged with the ability to commit to rig the free end, on which are located germanius

 

Same patents:

Drilling rig // 2188295
The invention relates to the mining industry, namely, drilling machines

Drilling rig // 2188294
The invention relates to the mining industry, namely, drilling machines

The invention relates to the field of drilling rigs and can be used for transportation of goods, pipe laying and road construction on wetlands

The invention relates to mining, in particular to installations for drilling in hard rocks, which contain a shaft pivotally connected to the frame and rotatable about the first axis, the lifting cylinder between the boom and the frame mounted on the other end of the boom pivotally connected to it the input beam, pivoting on a second axis parallel to the first axis, and the rotary cylinder between the feed beam and boom

The invention relates to the field of mining industry, in particular for constructive drill carriages, and is a device for guiding a flexible elements, such as hoses, around the drum for hose along the feed beam for moving the drill hammer

The invention relates to deep drilling, in particular, is a mobile repair the drilling rig, which can be used when servicing oil and gas wells

The invention relates to mining, in particular to the manipulators of drilling rigs engaged in drilling hard rocks when conducting mining

The invention relates to the field of water supply and drainage and can be used in drilling wells for various purposes (bored piles, ventilation, lesovoznye mine shafts, exploration, hydrogeological, etc.,) to a depth of up to 100 m

Drilling rig // 2119574
The invention relates to the field of drilling, in particular for drilling rigs for land well drilling, mobile facilities for repair of wells, and can be used in devices for unloading the wheel of progress and alignment of drilling rigs

The invention relates to mining, construction and other industries that can be used self-propelled installation for drilling shallow vertical wells

FIELD: oil and gas extractive industry.

SUBSTANCE: method includes use of device providing for manufacturability of assemblage of casing and drilling columns and concurrent drilling by two columns, provided with independent drives, and drilling, by casing column, of non-stable rock solids performed with frequency no greater than one calculated from formula

where Vmec - mechanical drilling speed, m/min, Fr - friction forces against rotation, Ften - friction forces against linear displacement, R - casing column radius, m, α - angle between vectors of directions of linear and rotating movements.

EFFECT: higher effectiveness, higher productiveness, higher reliability.

2 cl, 5 dwg, 1 ex

Drilling device // 2245982

FIELD: mining industry.

SUBSTANCE: device has slanting frame with lower rotation drive and localizer, clamps of drilling pipes, stacks for storing drilling pipes. Conveyor is mounted on slanted frame, having adjustable drive, while clamps of drilling pipes having elevator links are fixed to conveyor branches, as well as open localizers and upper drive-swivel, and stacks for storing drilling pipes are placed along movement of conveyor in its upper portion. Upper end of drilling column is placed in well pipeline. At the end of stacks for storing drilling pipes a vehicle is placed with clamps for pipes to provide additional traction force and performing hoisting operations for drilling stalks consisting of several drilling pipes.

EFFECT: higher efficiency.

3 cl, 3 dwg

Drilling plant // 2247210

FIELD: mining industry.

SUBSTANCE: device has transporting base, post with guides and moveable stops, jointly connected via axes to post and placed in upper link of post for rods of force cylinders, which are fixed perpendicularly to support surfaces of moveable stops at moveable rotator, mounted with possible axial displacement along guides of post, and made with possible axial displacement along guides of post, and made wit possibility of their output from area of effect of rods of force feeding cylinders by means of control cylinder, placed on post, drilling stand, hoisting winch, rope and rope blocks. Moveable stops are made with possible rotation around axes in direction of action of rods of force feed cylinders. Their axes are placed in hollow parallel to support surfaces of moving supports and connected to rod of control cylinder, and between each other, via rotation lever, mounted between moveable stops. Cylinder for control is jointly connected to rotation lever and plant post.

EFFECT: higher productiveness.

3 dwg

Drilling plant // 2247211

FIELD: mining industry.

SUBSTANCE: device has transporting base, post with stops in upper connection, moveable rotator with guides, on which corbels are made and control cylinders are fixed, connected by their rods to force support cylinders, which via fixing elements are connected to rotator guides via axes, placed perpendicularly to longitudinal axis of post and surface of guides, directed by their rods for interaction with stops of upper link of post and have opportunity o displacement relatively to rotator guides and output of rods beyond stops of upper link of post, drilling stand, hoisting winch, rope and rope blocks. Axes and elements surfaces mated thereto of force feeding cylinders are made conical. Rods of control cylinders are rotated in direction of stops of upper link for angle equal to half of slanting angle of conical surfaces.

EFFECT: higher productiveness.

3 dwg

Drilling plant // 2247213

FIELD: mining industry.

SUBSTANCE: drilling device includes a rotator and hoisting gear, consisting of two force hydraulic cylinder with separator ring between them, through which rod passes, provided with pistons mounted in cylinders. Hoisting mechanism also includes fixed and moveable rollers and flexible links. Moveable rollers are placed inside the hollow of force cylinders and are fixed on outer surfaces of pistons, and fixed ones - on outer surfaces of end covers of cylinders. Force cylinders are made of different diameters, while cylinder for hoisting drilling columns greatest diameter. Plant is provided with two bars, fixed on upper and lower end covers and made in form of guides for rotator, separator ring and end covers are provided with fixing assemblies on front and back supports of post and hydraulic cylinder for raising the post to working position.

EFFECT: higher efficiency, simplified construction.

3 dwg

Drilling device // 2248437

FIELD: mining industry.

SUBSTANCE: device has platform and on the platform it has oil station with drive, mast and mechanism for feeding drilling tool drive, made in form of hydraulic cylinder, body of which is fixed at platform, and on free and of rod of which a carriage with two rollers is mounted, which are placed along length of rod, two rollers, mounted in upper and lower portion of mast and flexible link, fixed by its ends in place of extreme position of each of carriage rollers with retracted and extended rod of hydraulic cylinder and skirting rollers of carriage on inner side, and rollers of mast - on outer side. Device is provided with additional two coaxially mounted rollers, mounted in zone of connection of end of flexible link, skirting side roller of carriage, and single roller, mounted in zone of connection of second end of flexible link. One of branches of flexible link after carriage roller skirts single roller and each branch of flexible link skirts coaxially mounted rollers on opposite sides.

EFFECT: higher reliability.

1 dwg, 2 cl

Drilling device // 2249665

FIELD: geology.

SUBSTANCE: device has base, mast, jointly mounted thereon, telescopic element for changing its angular position, carriage with engine and rotator, moveably placed on mast posts, hydraulic cylinder for moving carriage, directed downwards by its rod, and hydraulic system. Hydraulic cylinder is placed between upper and lower mast bars, its shell is rigidly fixed in carriage, and rod is connected to lower bar. Upper bar and/or carriage body are made in form of tank for working liquid of hydraulic system. Hydraulic system pump is placed on rotator, while cinematic link of engine to pump and/or rotator is made in form of wedge-belt transfer link, and connections of leading and following sheaves with their shafts are made threaded with oppositely directed thread. Between rotator and hydraulic cylinders for protection of rod a skirt is placed in form of ribbon, fixed on ends of mast.

EFFECT: lesser dimensions, higher mobility.

4 cl, 8 dwg

Drilling plant // 2250342

FIELD: construction industry.

SUBSTANCE: device has base moving carriage with frame, driving actuators, volumetric hydraulic drive with pumps and driving engines for actuators of left and right boards and stopping brakes with mechanism for controlling these, and also of, mounted on frame of moving carriage via manipulator, feeder frame with rotation gears and traction of drilling base along well axis with hydraulic engines of drives of these mechanisms, while hydraulic rotation engines of drilling base and its feeding gear during drilling are connected to pumps of right and left board instead of actuator drives hydraulic engines, via two-positional holders, which are controlled together with stopping brakes. If brakes are made with braking hydraulic cylinders and control holder for these, two-positional holders are made with hydraulic control, and inputs into chambers for control thereof are connected by mains to input into braking cylinders of stopping brakes. To combine possibilities of drilling vertical and/or horizontal well suspension gear is made in form of four-assembly device, on joints, with hydraulic cylinder for slanting feeder frame, which device is supported by means of transverse beam. To provide for possible drilling at corners of rectangular pit, feeder frame is fixed in intermediate guide of support gear with possible longitudinal displacement, and transverse beam of suspension gear is made symmetrical relatively to longitudinal symmetry plane of carriage.

EFFECT: higher efficiency.

4 cl, 6 dwg

FIELD: oil production industry, particularly for development, repair and drilling oil and gas wells.

SUBSTANCE: facility has frame, drill derrick and drawworks with drilling and bailing drums assembled on the frame, power-driven reduction gear, drive transmission of drilling and bailing drums connecting them with power-driven reduction gear and provided with leading and driven members. Each transmission is arranged in rigid one-piece oil-filled body. Driven member of the transmission has hollow shaft put on shaft cantilever of corresponding drawworks drum. Shafts of leading and driven member are mounted in above body by bearings. Body is provided with hinged unit arranged from leading member side and adapted to support thereof by the frame. Leading member shaft is connected to power-driven reduction gear through double cardan joint.

EFFECT: multiple decreasing of side loads applied to drawworks drum shaft cantilevers, increased life of transmission members and simplified transmission assembling and disassembling.

4 cl, 9 dwg

FIELD: deep-hole drilling and well repair, particularly for rotary drilling and repairing oil and gas wells.

SUBSTANCE: facility includes transportation base with drilling derrick, draw works and draw works and rotor drive transmission. Facility also has rotor with built-in wedge grip arranged on separate mobile base and including rotary table and main gear wheel fixedly secured to rotary table. The main gear is cylindrical and arranged between two radial-thrust bearings inside body of rotary table provided with replaceable and detachable driving attachment arranged in separate body and fixedly connected with rotary table body. The attachment includes cylindrical satellite and drive gear put on drive shaft.

EFFECT: reduced size and extended range of suitable drives.

4 cl, 5 dwg

Up!