The method of construction of the pipeline in remote areas

 

(57) Abstract:

The invention relates to the field of construction and can be used in the construction of new pipelines or repair of existing in remote areas, mainly in swamps and flooded areas. The method includes the delivery section or sections constructed pipeline and connection to the existing pipeline using a helicopter. Technical result provided by the invention, consists in shortening installation and repair work, as well as in reducing labor and materialsfrom. 2 C.p. f-crystals, 1 Il.

The invention relates to the field of construction and can be used in the construction of new pipelines or repair of existing pipelines in remote areas, mainly in swamps and flooded roads.

Known methods of construction of pipelines in remote areas, including wetlands, providing for the possibility of laying the sections and their connections carrying significant volumes of earthworks, in particular the development of the trenches with a preliminary vitifoliae, or trenching using specialmente time or trenching explosion. However in all of these scenarios require backfilling, coupled with the use of a large number of special equipment and labor costs. (see, for example, VSN 2-130-81. The collection of normative-technical documents. Construction of main and field pipelines. The Ministry of construction of petroleum and gas industry all-Union scientific research Institute for construction of trunk pipelines. -M.: VNIIST, 1988, S. 29-35).

Also known is a method of construction of pipelines in the swamps and flooded highways, providing for filling in marshes or flooded areas of highway embankments, soil which develop in the nearby quarries, located in the high places, which also involves the need to use special equipment, large volumes of excavation, requiring more labor, and during the construction of barrows through the swamp with low bearing capacity using imported soil with advanced vitifoliae at the base; on the marshes with the carrying capacity of 0.25 kgf/cm mound occiput directly on the surface or khvorostyanoy the pavement, and on the marshes there, S. 35, 36). All of these methods are also associated with large labor and materialistically and require considerable construction time, large preparatory work.

All known methods of pipeline construction on wetlands and flooded areas are divided into used in winter and used in spring, summer and autumn periods. The methods implemented in the winter include: strip with berm trench, laying with winter roads, laying with artificially zamorojennih and reinforced roads or strip of alluvial soil, or by mounting the float supports, or dive under the action of its own weight and the weights, which requires the device lane for immersion pipe at a depth of 3 meters.

The methods implemented in spring, summer or autumn periods, include: strip with berm trench, or strip with a dirt embankment, landfilling on a non-woven synthetic material, or a strip with a time of technological roads of various designs, or strip method alloy or pulling, or seal with a strip of alluvial soil (see, for example, VSN 005-88. Construction of commercial steel pipelines. Technology and ORGANOMETALLIC Institute for construction of trunk pipelines.- M, 1990, S. 42-50, PL. 2).

However, all known methods also involve high labor and materialsfrom in connection with the need to use significant amounts of special equipment, large volumes of earthworks, large amounts of preparatory work associated with the construction of temporary technological roads and access roads to them, as well as culvert and drainage structures at the entrances to the highway and along it, the device and the necessary equipment shore installation sites for laying pipelines by alloy.

The present invention is the reduction of labor and materialsfrom and reducing turnaround time as the construction of new pipelines, and repair of existing, due to allow construction of the pipeline in remote areas, mainly in swamps and flooded roads, without the need of construction and Assembly sites stretching along the route, avoid large amounts of excavation and the need to use special equipment and service roads and access roads to it, as well as having a large number Montana oil and gas, due to the rapid entry of the pipeline into operation.

The problem is solved by using the method of construction of the pipeline in remote areas, mainly in swamps and flooded highways, characterized in that it includes the delivery section or sections constructed pipeline and connection to the existing pipeline, which is carried out by raising the end portion of the existing pipeline, mounting thereon a winch, a rack unit in the upper part and the allocation between them on the prepared temporary space under the raised end section of the pipeline pneumatic cushion-Jack leaning on her raised end portion, then into the open end of the pipe section with the help of a helicopter having having two centering device internal clamp and fixed in the cavity of the pipe section first centering device of the centralizer, then prepare the following temporary space and install it following the pneumatic cushion-Jack for supporting another mounted partition constructed the pipeline, which is delivered by helicopter and not OTS and the terminal segment of the existing pipeline clamp with fixation, then another tail section mounted partitions based on a set the next time the site of the pneumatic cushion-Jack with fixing this end portion mounted section of the rope, which is passed through the stand unit and attach the other end to the winch with the requisite gap between the ends of the existing pipeline and mounted sections of constructed area within the location of the centralizer, and then release the helicopter and produce welding ends with the liquidation of the mentioned gap in the area of location of the centralizer, then centering device clamp release and move the centralizer mounted in the cavity section to free its end face and the process of installation the following sections constructed pipeline repeat in the same sequence permutation winch and a rack mounted on the section of the pipeline.

This can construct the area of the newly built pipeline, as well as the existing land use stacked plot construction of the pipeline, built on the available area with a driveway along the laid pipe section, or can construct a plot of the repaired pipeline, Yes, built with the presence of driveways along it.

The technical result provided by the present set of features, is to reduce labor and materialsfrom and timing of pipeline construction in remote areas, mainly in swamps and flooded roads, by eliminating the need to use special equipment and service roads and access roads, as well as large volumes of earthworks and large number of Assembly and repair crews.

The invention is illustrated by the drawing, which schematically shows the process of installation of the pipeline on the marsh side.

The method of construction of phase 1 of the pipeline in remote areas, mainly in the 2 swamps and flooded tracks (not shown), includes a delivery section 3 of the pipeline and connection to the existing pipe 4, which is carried out by lifting the end portion 5 of the existing pipeline 4, mounting thereon the winch 6, 7 hours unit 8 in the upper part and the allocation between them on the prepared temporary space 9 under the raised end section 5 of the pipe 4 pneumatic cushion-Jack 10 with the bearing h is tolet 12 is slid with two centering device 13, 14 internal centralizer 15 and fixed in the cavity of this section 5 of the pipe 4, the first centering device 13 of the clamp 15. Then prepare the following temporary space 16 and install it following the pneumatic cushion-Jack 17 for supporting another mounted partition 3 is constructed phase 1 of the pipeline which is delivered by helicopter 12 and without disconnecting it from the helicopter 12, having one end 18 to the second centering device 14 is installed in the cavity of the end portion 5 of the existing pipe 4 clamp 15 with fixation. Then the other end section 19 mounted section 3 is based on a set the next time the platform 16 pneumatic cushion-Jack 17 with fixing this end portion 19 mounted section 3 of the cable 20, which pass through the block 8 front 7 and attach the other end 21 to the winch 6 maintaining the required gap 22 between the ends 11 and 18 of the existing pipeline 4 and mounted section 3 of constructed area 1 in the area of clamp 15. Then release the helicopter 12 and produce welding ends 11 and 18 with the elimination of the above-mentioned gap 22 in the area of clamp 15. After this centering device 13, and 14 is the process of installation the following sections 24 of constructed area 1 pipeline repeat in the same sequence permutation winch 6 and 7 hours on the mounted section 3 of the pipeline.

This may build plot 1 newly constructed pipeline, as well as the existing land use stacked plot construction of the pipeline, built on the available area with a driveway along the laid pipe section (not shown). Can also build plot 1 of the repaired pipeline, as well as the existing land use the latest, not requiring replacement during repair, the area of the pipeline laid to the presence of driveways along it (not shown).

The method can be used for the construction or repair of pipelines with a diameter greater than 1000 mm, laid out on the marshes and flooded roads.

1. The method of construction of the pipeline in remote areas, mainly in swamps and flooded highways, characterized in that it includes the delivery section or sections constructed pipeline and connection to the existing pipeline, which is carried out by raising the end portion of the existing pipeline, mounting thereon a winch, a rack unit in the upper part and the allocation between them on the prepared temporary space under the raised end section t is ryty the end of the pipe section with the help of a helicopter having having two centering device internal clamp and fixed in the cavity of the pipe section first centering device of the centralizer, then prepare the following temporary space and install it following the pneumatic cushion-Jack for supporting another mounted partition constructed the pipeline, which is delivered by helicopter and, without disconnecting it from a helicopter, having its one end face to the second centering device is installed in the cavity of the end portion of the existing pipeline clamp with fixation, after which the other end section mounted partitions based on a set the next time the site of the pneumatic cushion-Jack with fixing this end portion mounted section of the cable, which is passed through the stand unit and attach the other end to the winch with the requisite gap between the ends of the existing pipeline and mounted sections of constructed area within the location of the centralizer, and then release the helicopter and produce welding ends with the liquidation of the mentioned gap in the area of location of the centralizer, after which the centering device is a clamp release and move the centralizer mounted in the cavity section to free its end face and the process of installation the following sections constructed pipeline repeat is 2">

2. The method according to p. 1, wherein the erecting section of the newly built pipeline, as well as the existing land use stacked plot construction of the pipeline, built on the available area with a driveway along the laid pipe section.

3. The method according to p. 1, wherein the erecting section of the repaired pipeline, as well as the existing land use the latest, not requiring replacement during repair, the area of the pipeline laid to the presence of driveways along it.

 

Same patents:

The invention relates to a method of production of oil and gas activities in deepwater areas with severe weather and climate conditions, including the Arctic shelf, and marine structures hydraulic structures for this

The invention relates to a method of construction of underwater structures for preservation of submerged hazardous objects resulting from human activity, for example, due to accidents, flooding

The invention relates to the field of construction, allows you to build the foundations for deep water and is that the bearing shell is made of sections manufactured in the form of cylindrical rings with holes symmetrically positioned around the circumference of, and coaxially lowered to the ground by stringing on rails suspended from the conductor, located above the water surface, then through the cavity are developing well, which then together with the cavities of the shell are filled with structural material

Closure hatch // 2188291
The invention relates to utilities and relates to closures of the cap, consisting of a locking screw with a head under a special key and a running nut with levers, the device entered the disk attached to the hatch cover installed sleeve and three bracket with installed adjustable length levers, moving on axes in brackets, and locking screw upper part is included in the socket cover, and the lower part is included into the sleeve with the free rotation, and the locking screw is installed running nut with slots, in which opened and fixed on the axes of the ends of the levers, and made in the upper part of the locking screw groove in which the o-ring

The invention relates to the construction, namely, devices for protection of pipelines located on landslide slopes

The invention relates to the field of underground construction, ensuring the protection of various objects, such as nuclear power plants, from the outside explosive mechanical

The invention relates to the field of transport construction in mountainous restricted areas and can be used as the protection of Railways and highways, industrial facilities, settlements from geological processes, as part of the transport interchange, as an intermediate link between the tunnel and the bridge at the device roads in two levels

The invention relates to transportation construction, and in particular to methods of reconstruction of underground transportation facilities located within the transport complex of the city, and can be used in the reconstruction of the buildings as part of the transport complex of the city and the need for regulation and unloading of traffic to ensure smooth traffic flow, eliminating congestion in the transport complex of the city and reduce the number of accidents and road accidents

The invention relates to transportation construction, and in particular to methods of reconstruction of underground transportation facilities located within the transport complex of the city, and can be used in the reconstruction of the buildings as part of the transport complex of the city and the need for regulation and unloading of traffic to ensure smooth traffic flow, eliminating congestion in the transport complex of the city and reduce the number of accidents and road accidents

The invention relates to the construction, and in particular to methods of construction of the tunnel, and can be used in the construction of shallow tunnels under existing highways without interruption of traffic on them in difficult mining and geological conditions, including the presence of hydric soils in the bottom of the tunnel

The invention relates to the construction, and in particular to methods of construction of the tunnel, and can be used in the construction of shallow tunnels under existing highways without interruption of traffic on them in difficult mining and geological conditions, including the presence of hydric soils in the bottom of the tunnel

The invention relates to the field of construction, and in particular to methods of construction of the tunnel, and can be used in the construction of shallow tunnels under existing highways without interruption of traffic on them in difficult mining and geological conditions, including the presence of hydric soils in the bottom of the tunnel

The invention relates to the field of construction, and in particular to methods of construction of the tunnel, and can be used in the construction of shallow tunnels under existing highways without interruption of traffic on them in difficult mining and geological conditions, including the presence of hydric soils in the bottom of the tunnel

FIELD: hydraulic structures, particularly for laying underwater pipelines.

SUBSTANCE: method involves transporting pipeline tunnel sections by water to pipeline laying site; submerging thereof; placing pipeline tunnel sections on underwater piers with the use of flexible ties; sealing pipeline tunnel sections. Tunnel sections have nearly zero floatability. Pipeline tunnel sections are submerged and put on piers by flexible ties. Then pipeline tunnel sections are pushed in docking unit of previous submerged section with the use of submarine and sealed from inside and outside along with connection of inner service lines. After finishing pipeline tunnel sections assemblage entry and exit tunnels are secured to pipeline tunnel. System for underwater pipeline tunnel sections assembling includes underwater pipeline tunnel mounted on underwater piers and formed of separate sections having design lengths. Pipeline tunnel sections are divided into two chambers by horizontal partition. Transport path is arranged in upper chamber. Lower section is divided into several cavities by air-tight partitions for laying inner pipelines. Underwater pipeline tunnel sections are formed of two thick-walled shells of steel plates or titanium alloy. Longitudinal partitions are mounted between shells and secured along perimeter thereof. Longitudinal partitions serve as pipelines and stiffening ribs. Pipeline tunnel sections are laid on underwater permanent and temporary piers. Upper pier parts have bases of semicircular or parabolic shape. Pier part dimensions exceed that of pipeline tunnel sections.

EFFECT: increased efficiency of pipeline laying and maintenance during multi-purpose usage thereof.

5 cl, 6 dwg

FIELD: municipal engineering, particularly covers for manholes of different underground pipelines.

SUBSTANCE: cover comprises base, fixed rests and sliding rest located diametrically opposite to fixed rests and having stop and locking device. Fixed and sliding rests are arranged on cover base from support surface side. Movable rest is made as flat cam member with stop groove and key orifices. Cam member has central key orifice corresponding to key orifice formed in cover base. Locking device is made as rotary plate performing rotation around its axis and having short and long shoulders. Rotary plate includes counterweight and stop member arranged on long shoulder from opposite axis sides. Stop member may cooperate with flat cam member groove. Short shoulder may close central key orifice made in cam member when stop member is arranged in cam member groove.

EFFECT: increased locking reliability.

2 cl, 9 dwg

FIELD: municipal engineering, particularly covers for manholes of different underground pipelines.

SUBSTANCE: cover comprises base, fixed rests and sliding rest located diametrically opposite to fixed rests and having stop and locking device. Fixed and sliding rests are arranged on cover base from support surface side. Movable rest is made as flat cam member with stop groove and key orifices. Cam member has central key orifice corresponding to key orifice formed in cover base. Locking device is made as rotary plate performing rotation around its axis and having short and long shoulders. Rotary plate includes counterweight and stop member arranged on long shoulder from opposite axis sides. Stop member may cooperate with flat cam member groove. Short shoulder may close central key orifice made in cam member when stop member is arranged in cam member groove.

EFFECT: increased locking reliability.

2 cl, 9 dwg

FIELD: building, particularly erection of all-purpose underground structures having deep foundation pit of irregular shape.

SUBSTANCE: method involves building enclosing walls, two-stage foundation pit excavation, wherein the first stage includes anchoring of enclosing walls with cross-pieces; and assembling frame. Additionally installed within contour defined by enclosing walls is sheet-pile enclosure. Cross-pieces are arranged between enclosing walls and sheet-pile enclosure. The first stage of foundation pit excavation is performed in thrust support between enclosing walls and sheet-pile enclosure and then contour frame members are mounted in developed pit area. The second stage of foundation pit excavation includes developing inner pit part after which frame erection is completed.

EFFECT: improved structure stability, reduced labor inputs, material consumption and increased reliability.

4 cl, 2 dwg

FIELD: building, particularly underground or underwater structures.

SUBSTANCE: method involves building foundation; heating thereof before pouring concrete mix and performing concreting cast-in-place blocks by pouring concrete mix having different temperature along structure height; vibrating concrete mix; covering structure surfaces not enclosed by form with water-impermeable and heat-insulating material and curing thereof in form up to obtaining necessary concrete strength. Foundation is formed of piles arranged along tunnel wall axes. Foundation is heated up to 5 - 20oC. Concreting of members supported by wall piles is performed by filling form with concrete mix under temperature of 20 - 30oC up to level located at height exceeding height of wall component with 4 m-1 surface modulus by 500 mm. Remaining wall and floor structure parts are filled with reinforced concrete mix under 10 - 20oC temperature. Concrete of outer pile foundation area having 600 - 800 mm height measured from contact line with concrete mix is heated up to obtaining 0.28 - 0.3 R28 concrete strength. Form material and covering material have thermal resistance of 0.2 - 0.3 (m2·deg)/W. Form for forming wall components having 4 m-1 surface modulus are coated starting from bottom by material having thermal resistance of 0.2 - 0.5 (m2·deg)/W to improve warmth-keeping thereof. Height of form to be covered and concreting block height are determined from given formulae.

EFFECT: improved crack-resistance; increased erection rate due to increasing admissible dimensions of blocks to be concreted.

3 dwg, 1 ex

FIELD: building, particularly for slope consolidation and for stabilizing deep front landslide areas.

SUBSTANCE: structure includes foundation mat and piles formed in wells grouped in rows. Upper pile parts are embedded in foundation mat, lower one is restrained by not-sliding ground layers. Piles are composite along their lengths. Central pile parts are not filled with concrete. Heights of upper and lower pile parts decrease towards landslide head. Structure to prevent deep front land-slides comprises separate local pile groups connected by foundation mats and located within landslide body boundaries. Each foundation mat has tension bars anchored in stable slope layers and arranged under and above foundation mat along slope to retain thereof against displacement and rotation.

EFFECT: improved slope stability, increased operational reliability of structure built on wide landslides, reduced building time and material consumption.

2 dwg

FIELD: building, namely underground structure erection, particularly for building multipurpose pipelines under acting roads without traffic interruption and in difficult mining and geological conditions and in presence of watered tunnel base ground.

SUBSTANCE: method involves forming minitunnel by successive driving hollow reinforced concrete sections in ground and/or embankment along with simultaneous supplying thixotropic mix; connecting above sections one to another and to neighboring pipeline sections during driving thereof. Pipeline sections have opened end parts. One end part has annular grove opened from section end for receiving metal shell extending out of the section end and having thickness of not more than groove depth. Shell and end section part form stepped funnel. The second section end part tapers in stepwise manner to end thereof to form bush part having one step for shell of neighboring section receiving. The second section end part is provided at least with one step for gasket. Gasket is made of pliable sealing gas-and waterproof material and bearing against step surface by one gasket side and against inner shell surface by another side thereof. Steps of bush part are formed within half of thickness of section wall facing outwards, wherein neighboring sections are located so that gaps are formed between ends thereof. Compression ring and additional gasket abutting compression ring are installed in above gap. Additional gasket is made of pliable gas- and waterproof material and bears against inner shell surface by outer ring side and to neighboring section ends by end surface thereof. Length of bush part exceeds that of adjoining part of metal shell. End parts of pipeline sections adjacent to minitunnel mate neighboring end parts of minitunnel or adapter and/or inserted sections are used for pipeline and minitunnel connection. Pipeline is connected to minitunnel after driving the last pipeline section.

EFFECT: reduced material consumption, labor inputs and time required for pipeline laying; increased service life and economy.

8 cl, 16 dwg

Tunnel // 2250962

FIELD: building, particularly underground structures erected in difficult mining and geological conditions, namely in soft watered ground bedded under tunnel scoop and forming tunnel base.

SUBSTANCE: tunnel has composite lining including hollow metal members driven in ground and forming screen, load-bearing frames and grouting concrete. Metal members are connected one to another through interlocks. At least some of metal members have rigidity varying along length thereof and increasing in direction opposite to metal member driving direction. Metal members have constant outer diameters.

EFFECT: increased tunnel reliability and operational safety due to prevention of original ground deformation during tunnel building and operation; reduced ground settlement at base of tunnel built under motor road without traffic interruption, reduced building time, power and labor inputs, material consumption due to optimal material distribution along driven member in accordance with load distribution among member parts.

24 cl, 11 dwg