The method of construction of piles or racks in a weak and unstable soils

 

(57) Abstract:

The invention relates to the construction of piles or racks in a volatile water-saturated soils. The method of construction of piles or racks includes education in the soil cavity, sealed walls in two stages, the first of which along the axis of the constructed piles or racks Sabouraud without removal of soil to the surface auger drilling tool to a depth corresponding to a project depth of piles or racks, followed by extraction auger drilling tool by rotation in the opposite direction with simultaneous application of downward axial force, the value of which take the corresponding specified value of soil density in the walls of the borehole, with the formation of the axis of constructed piles or racks compacted soil zone, and in the second phase, after extraction auger drilling tool along the axis formed by compacted soil zones perform well with a diameter not exceeding the diameter of the piles or racks. The technical result consists in the simplification of the technology, reducing the complexity and cost of construction of piled and rack structures in unstable soils. 3 C.p. f-crystals.

Izobreteny is in the saturated and guttering soils.

The closest in technical essence and the achieved result is the method of construction of piles or racks in a weak and unstable soils, including education in the soil cavity, sealed walls and setting up or formation of the trunk.

The disadvantage of this method is the complexity and the complexity of technology and the need to use imported materials.

Object of the invention is the simplification of the construction while reducing complexity and cost and increasing productivity and quality of the construction.

The problem is solved due to the fact that the method of construction of piles or racks in a weak and unstable soils, including education in the soil cavity, sealed walls and the installation and/or formation of the stem, the cavity forming is carried out in two stages, the first of which along the axis of the constructed piles or racks Sabouraud without removal of soil to the surface auger drilling tool to a depth corresponding to a project depth of piles or racks, followed by extraction auger drilling tool by rotation in the opposite direction with simultaneous application of downward axial y, with the formation of the axis of constructed piles or racks compacted soil zone of cylindrical shape, the diameter of which is 1.5-2 times the diameter of the pile shaft or rack, and the second phase after extraction auger drilling tool along the axis formed by compacted soil zones perform well with a diameter not exceeding the diameter of the piles or racks. During the rotation of auger drilling tool in the opposite direction, while removing exercised by the introduction into the well to the additional volume of soil and/or reinforcing material, and installation of pile shaft or a rack formed in the well is carried out in a forced manner with the application downward axial dynamic or static force or the version without the application of axial force.

The technical result provided by this sequence of operations and set the size of the compacted soil zone, is that while ensuring the sustainability of the walls of the cavity in a weak and unstable soils increases the strength of the fixing piles or racks, reduced complexity and cost, as well as significant performance improvements.

Vostede the sequence.

Axis of constructed piles or racks Sabouraud without removal of soil to the surface auger drilling tool to the depth of the lower end of the pile or rack. Then carry out the extraction auger drilling tool by rotating in the opposite direction with simultaneous application of downward axial force, the magnitude of which corresponds to the value of soil density in the walls formed by the wells. In the extraction process of the drilling tool with reverse rotation may be the introduction of an additional amount of filler or reinforcing material, or mixtures thereof. This axis of constructed piles or racks formed densified area of cylindrical shape, the diameter of which is regulated by the quantity applied to the drilling tool axial forces and is typically 1.5-2 diameter piles or racks. After extracting auger drilling tool along the axis of the formed densified zones perform well with a diameter not exceeding the diameter piles or racks. Then formed in a well sealed walls make the installation of piles or racks forced or standpipe way. In the first case apply clogging, indentation or vibrato is in the hole of larger diameter. In addition to the installation of the mortgage method can be applied to the formation of piles or stand base printed way. Can also be used combined method: mortgage in combination with printed.

The advantages of the proposed method consist in the fact that while providing a secure attachment to the walls of the borehole in an unstable and guttering soils is achieved by simplifying technology, increasing productivity by integrating processes, as well as reducing the complexity and costs by allowing the use of standard equipment and local materials (soil).

The proposed solution can be effectively used in the construction of various construction projects on the weak and unstable soils, in particular, transmission lines and substations in the areas of distribution of the wet marshy soils and degrading permafrost.

1. The method of construction of piles or racks in a weak and unstable soils, including education in the soil cavity, sealed walls and the installation and/or formation of the barrel, characterized in that the cavity forming is carried out in two stages, the first of which along the axis of the constructed piles or stoakley the depth of the piles or racks, followed by removing the screw drilling tool by rotation in the opposite direction with simultaneous application of downward axial force, the value of which take the corresponding specified value of soil density in the walls of the borehole, with the formation of the axis of constructed piles or racks compacted soil zone of cylindrical shape, the diameter of which is 1.5 - 2 times the diameter of the pile shaft or rack, and the second phase after extraction auger drilling tool along the axis formed by compacted soil zones perform well with a diameter not exceeding the diameter piles or racks.

2. The method according to p. 1, characterized in that during the rotation of auger drilling tool in the opposite direction, while removing exercised by the introduction into the well to the additional volume of soil and/or reinforcing material.

3. The method according to p. 1, characterized in that the installation of the pile shaft or a rack formed in the well is carried out in a forced manner with the application downward axial dynamic and static effort.

4. The method according to p. 1, characterized in that the installation of the pile shaft or a rack formed in SLE

 

Same patents:

Port facility // 2117091
The invention relates to the construction, in particular to the construction of port structures on soft soils

The invention relates to industrial and civil construction and can be used in the construction of roads, airfields, foundations for various structures, as well as in the construction of any structures on soft soils

The invention relates to industrial and civil construction and can be effectively used in the construction of roads, airfields, foundations for various structures, as well as in the construction of any structures on soft soils

The invention relates to the construction, namely the construction of roads, airfields, foundations for various structures power transmission line supports, and other structures, working directly with the ground, mostly weak

Pile // 2109879
The invention relates to the construction, namely the construction of piles for use during the construction of pile foundations in soils of low strength

Pile // 2109107
The invention relates to the construction and can be used as foundations of buildings and structures constructed on permafrost

The invention relates to the construction, namely the structures erected on a heaving during freezing rocks

The invention relates to the construction, namely the structures erected on a heaving during freezing and subsidence during thawing soils

The invention relates to the construction and can be used during the construction of pile foundations of buildings and structures on permafrost

The invention relates to the construction and can be used to increase the bearing capacity of frozen, plastic - frozen and saline frozen soils and ice during their interaction with piles and other types of foundations of buildings and structures

The invention relates to the field of construction and can find application in the construction of gas pipelines and gas production in the conditions of flooded tundra and marshes of the North, particularly in subsidence and heaving soils

FIELD: foundation building, particularly for all-purpose buildings and structures, electric power lines and outer service lines in continuous or discontinuous permafrost conditions on all types of thawed ground except water-saturated grounds, seasonally thawing and freezing ground with 3 - 9 m depth located above permafrost or rock underplaying ground.

SUBSTANCE: method involves ramming foundation pit in seasonally thawing and freezing ground layer with forming compacted area around foundation pit and under it; building foundation unit in foundation pit. Foundation pit ramming is performed in thawed ground before freezing thereof. Compacted area is formed as solidified ground column supported by permafrost or rock grounds. Foundation pit is rammed up to bulging ground out of pit in upward direction, which indicates that solidified ground column rests upon permafrost or rock ground. After that thawed ground ramming is stopped and foundation unit is built in foundation pit so that foundation unit is supported by solidified ground column.

EFFECT: increased reliability of foundation base, reduced power and labor inputs, improved load-bearing capacity of thawed ground, prevention of foundation settlement during ground thawing and heaving thereof during foundation base freezing.

10 cl, 6 dwg

FIELD: building, particularly building structures erected on ground subjected to heaving during ground freezing and subsidence during thawing thereof.

SUBSTANCE: method involves marking compaction points on ground surface and compacting ground. Compaction areas are located on foundation axes or parallel thereto so that the areas overlap one another. Compaction is performed by simultaneous well forming along with rolling out well wall. Material for changing heaving ground properties is placed into well and rolled into well wall. Then the well is filled with nonfrost-susceptible material along with following compacting thereof. Rolled out well depth is not less than depth of seasonal frost penetration in ground.

EFFECT: increased efficiency of foundation protection.

3 dwg

FIELD: building, particularly to construct pile foundation in territories with severe climatic conditions.

SUBSTANCE: pile foundation with grillage includes piles driven in seasonally frozen heaving soil, grillage to connect pile heads supported directly by heaving foundation soil. Pile heads have reinforcement rod projections extending for at least 150 mm and welded with anchoring rods located in grillage body. Summary area of extended reinforcement of one pile, maximal pile stretching force and actual value of pile foundation buckling are determined from given relations taking into consideration that maximal admissible relative buckling difference is to be more or equal to actual value.

EFFECT: reduced material consumption and labor inputs, increased reliability and enhanced pile foundation operation during building and building structure usage.

3 dwg, 1 ex

FIELD: construction, particularly to erect buildings and building structures on permafrost ground, which may thaw during building or building structure usage.

SUBSTANCE: method involves digging-out pit; filling the pit with nonfrost-susceptible material; introducing reinforcing members in the nonfrost-susceptible material and mounting foundations. The reinforcing member is made as rigid reinforced concrete panel arranged in compacted nonfrost-susceptible material layer. Distance between foundation bottom and panel top is selected to provide uniform load transmission from the foundations to the panel. Upper panel surface is formed of heat-insulation material and sloped parts inclined from panel center to panel periphery are created. Panel rigidity is related with thawing permafrost ground deformation extent.

EFFECT: reduced building deformation caused by non-uniform deformation of thawing permafrost ground.

1 dwg

FIELD: foundations for special purposes, particularly foundation platforms connected to tanks.

SUBSTANCE: reinforced concrete beams or trusses are installed between reinforced concrete panels of upper and lower belts of three-dimensional platform. Reinforced concrete beams or trusses have inclined upper face and are connected one to another in center by monolithic rigid core. The reinforced concrete panels have trapezoid or segmented shape in plane. Reinforced concrete beams or trusses with key connections are located in parallel between reinforced concrete panels of upper and lower belts. Tank walls and coverings have arched structure shaped as prismatic polyhedron inscribed in cylindrical surface defined by square parabola or another curve with generatrices parallel to beams or trusses of three-dimensional foundation platform.

EFFECT: increased structural efficiency due to increased reliability of three-dimensional foundation platform, reduced metal consumption and labor inputs.

2 cl, 9 dwg

FIELD: construction, particularly foundation erection in heaving soil at negative temperatures.

SUBSTANCE: method involves creating pit; forming hole in ground; driving foundation body in hole and filling thereof with non-heaving soil. After hole creation heating element is located in designed foundation base area and is linked to power source through temperature regulator.

EFFECT: decreased costs and increased capacity of foundation erection.

FIELD: construction and operation of railroad overhead system to be erected in adverse subgrade conditions, namely in permafrost conditions and deep seasonal heaving ground freezing.

SUBSTANCE: method involves forming bored pile having lower widened part in ground in area of pole erection; connecting pile with overhead system pole at height of 0.6-0.8 m over ground surface with the use of platform horizontal welded joint through embedded members built in pile head and pole. Well-known discharge impulse technology is used for pile erection. Said discharge impulse technology provides pile anchoring in permafrost ground and increases pile resistant to ground heaving forces. Widened pile part provides decreased length of pile anchoring in permafrost ground.

EFFECT: increased conical reinforced concrete pole stability, decreased labor inputs and reduced pre-stressed reinforcement due to decreased length of pile anchoring in permafrost ground and reduced pile section within active heaving zone, as well as decreased material consumption and labor inputs for joint creation between foundation and pole.