The method of preparation of frozen rocks

 

(57) Abstract:

Usage: in the extraction of minerals from placer deposits. Essence: prepare the ground razvarivat wells, in which place the explosive charge and calabresi reagent with a strong dispersing effect, for example, the melt of metal chlorides. On the lower surface of the polygon construct a drainage sump and on the flanks of the post Gerogly, through which the produced water in the exploded array and defrosting rocks. While the sump build after detonation of explosive charges in boreholes. table 1.

The invention relates to the mining industry and can be used in the development of placer mineral deposits for the preparation of frozen soils for excavation.

The known method of preparing frozen loose deposits to mining, including drilling in the prepared array of wells, the loading wells, blasting them explosive charge and thawing shattered rocks by submitting a subsequently water, drilling water intake and drainage ditches (ed.St. USSR N 717940, CL E 21 41/00, 1978).

The disadvantage of this method is the low quality of defrost, which leads to low productivity mining is t ultimately on the extraction of useful component in the enrichment process.

The aim of the invention is to improve the quality of the defrost and the increase of extracting useful component due to the use in the preparation of teplootrazhayuschikh reagents with expression dispersing effect.

For this purpose, the known method of preparation of frozen rocks, including drilling in rocks of the wells, the loading wells charges digging and blasting, defrosting of the rocks by filing them in water in wells together with charges loosening place calabresi reagent with a strong dispersing effect, and after blasting holes on a rendered polygon construct drainage sump, on the flanks of the landfill post Gerogly, through which the produced water in the exploded array.

The method of preparation of frozen rocks is as follows.

Produce drilling to prepare the ground, in wells place an explosive charge and calabresi reagent with a strong dispersing effect type, the melt of metal chlorides (PHM), aluminium sulphate, etc. blasting is chosen such that the explosion was loosening rocks for a more uniform distribution of the reagent in the body prepared to reconsider placing the reagent portion, Packed in a waterproof shell made from easily destroyed in the explosion of the material. On the lower surface of the polygon construct a drainage sump and on the flanks of the post Gerogly by drilling or penetration, mount the system of conduits with the possibility of taking water from the drainage sump. Then make the water flow into the body of rendered polygon. In the process of completing the reaction occurs between the reagent and water with evolution of heat, begins the process of defrosting. After complete saturation of the body of ground water and fill the drainage sump begin pumping water from the last filing in located on the flanks of Gerogly. The result is a circulating stream of water having the direction from the bottom of the array to the drainage sump, as the temperature of the water flowing through Gerogly, above the temperature of the water filling the array. In addition, there is an additional heating due to the heat from that part of the reagent, which is not reacted during the initial saturation of the array. Formed in the body of the array of different areas, between which there is a constant heat transfer, lead to more intense defrost and eliminates the prob is a result of reagent. The effectiveness of the dispersion increases as a result of the fact that prior to contact with the reagent particles were subjected to explosive destruction.

P R I m m e R. thawing permafrost is at the range with the following parameters: length 300 m, width 50 m, power sand 6 m

The results of the work on the prototype method and the proposed method are given in the table.

The use of the proposed method for the preparation of frozen rocks improves the quality of defrost and increases the extraction of useful component in the enrichment process due to better dispersion of clay particles.

The use of the proposed method in comparison with the prototype provides increased intensity defrost 2 times and increase extraction by 3-18%

The METHOD of PREPARATION of FROZEN ROCKS, including drilling in rocks of the wells, the loading wells charges digging and blasting, defrosting of the rocks by filing them in water, characterized in that, with the aim of improving the quality of defrost and increasing the recovery of useful component in wells together with charges loosening place calabresi reagent with a strong dispersing effect, and after blasting holes on a rendered polygon construct the initial array.

 

Same patents:

The invention relates to the mining industry, namely mining in an open way, in particular "ore deposits"

FIELD: mining industry.

SUBSTANCE: device has screw, having transporting spiral ribbon held on the shaft. Equipment is provided with U-shaped chute and perforated drum with armature in form of screw ribbon, having curvilinear shape in cross-section, arched in the direction of movement. Drum is mounted in upper portion of U-shaped chute. In its lower portion a screw is mounted.

EFFECT: higher productiveness.

3 dwg

FIELD: mining industry, particularly for open-cut steeply dipping or inclined deposit development.

SUBSTANCE: method involves excavating pit up to design depth reaching by sliced benches; moving the benches as ore deposit is developed; cutting ore and debris; loading thereof on conveyance means to move ore to ground surface, wherein as pit is deepened conveyer systems are used; on reaching the design pit depth deposit is divided into slices and the slices are developed with minimal ore losses in triangular zones with negligible interaction in peripheral face by developed slot raise technology usage; reinforcing slopes with anchors and metal mesh at deep horizons where berm cleaning is difficult; performing slice cutting though the full ore body thickness at design pit bottom and conveying the cut ore to surface by steeply inclined conveyers and combined transportation means. In the case of ore development in slices having lesser thickness below pit bottom steeply dipping and vertical side part are built, concrete wall and metal mesh adapted to hold wedge-like lumps in the presence of potential caving, wherein in this case mining equipment is used and ore cut from underground layer is crushed in crushing mills located on main loading and transportation horizons and delivered to ground surface by conveyer or skip shaft. Mined-out space is filled with rock refuse at terminal stage.

EFFECT: increased efficiency of mineral extraction, reduced cost of deposit development.

8 dwg, 1 ex

FIELD: mining industry, as well as hydraulic, road, agriculture and other building, particularly to perform open cast mining and other woks by rock loosening.

SUBSTANCE: method involves obtaining information concerning main and structural-and-strength rock properties on the base of estimation of data of primary and post-authorization prospecting, as well as production prospecting; detailed rock zoning to separate production blocks and unit blocks characterized by uniform rock at borders thereof; writing computer program; automatically loosing rock of each unit block by most effective method, namely by mechanical, pneumatic, blast drilling or physical one performed with the use of all-purpose mobile rig tools. Above rig includes computer system, device provided with one, two or three replaceable teeth, with plate-like metal pins and with hydraulic cylinders. The rig also has device adapted to create holes in unit block and wedge out thereof, drilling device and charging device, laser charge initiation system, local shelter with damping means, device for rock cutting by applying pressurized air and impacts to rock and auxiliary excavation device.

EFFECT: increased efficiency of rock preparation for further cutting and loading and for solid mineral field development as a whole.

1 dwg

FIELD: mining industry, particularly to develop watered placer deposits and technological mineral deposits under permanent negative temperatures of ambient air.

SUBSTANCE: method involves performing preparation and production works, mineral processing and refuse stacking operations. To implement above method dam is built around mining equipment and deposit to be developed prior to air temperature reduction to negative value; installing sled-mounted hangar having transparent heat insulated roof over the dam and performing all above mentioned works and operations inside the hangar.

EFFECT: increased efficiency of production and processing equipment.

2 cl, 1 ex

FIELD: mining industry, particularly for co-developing salt and platinum deposits.

SUBSTANCE: method involves detecting presence of platinum in non-soluble salt residue salt during salt deposit development; performing geological mapping of salt-bearing cavity and determining sand distribution in stratum above salt layer; drilling wells and bore pits and taking samples to determine platinum content; contouring sand deposits bearing platinum with concentration suitable for industrial development; cleaning surface; blocking out and excavating platinum-bearing sand; directing above sand to gravity separation plant; tying thereof with water in gravity separation plant to separate platinum therefrom.

EFFECT: increased complexity of deposit development.

FIELD: methods of surface mining, particularly for following natural stone treatment by covering or impregnating thereof with liquid or other flowable substances on surface.

SUBSTANCE: method involves gunning salt pit surface with waterproofing agent; covering salt pile surface with clay-and-salt mud layer in dry and hot season after salt pile hardening in at least 1.0-1.5 months after pile filling with salt. The clay-and-salt mud is sylvinite ore-dressing waste obtained from chemical factory. The clay-and-salt mud layer has 10-20 mm thickness and is formed by gunning salt pile surface with above mud material. The clay-and-salt mud is supplied into pneumatic pump receiver, wherein solid/liquid phase ratio is 1:2 - 1:3.

EFFECT: increased efficiency of salt pile waterproofing.

FIELD: agricultural; devices for treatment.

SUBSTANCE: the invention is pertaining to the field of clarification of water at the industrial development of the placer deposits with utilization of the wastes of the timber loggings and extraction of the finely dispersed gold from the water runoffs of the gold mining. In the bed of the diversion channel they form the firebreak out of the filtering material containing the wood sawdust mass subjected to the preliminary sorting at the vibration installation and having the ratio of the fractions from 1 to 5 mm up to the fraction from 5 up to 15 mm as 1:3 and packaged in the netted forms made out of the wire skeleton. After the water clarification the wood sawdust mass is subjected to dehydration by pressing and to drying and incineration for extraction of the fine fractions of gold. The technical result of the invention is the increased efficiency of the water clarification and extraction of gold.

EFFECT: the invention ensures the increased efficiency of the water clarification and extraction of gold.

1 dwg

FIELD: mining industry, possible use during extraction of natural and man-made gravel deposits of both mineral resources of high density (gold, platinum, etc), and valued minerals of low density.

SUBSTANCE: method for softening and disintegration of argillaceous sands of gravel deposits includes driving a water-feeding trench, driving a water-collecting trench in 80-100 meters along direction of fall of deposit bed in parallel to water-feeding trench, depth of water-collecting trench providing for difference of bottom levels in trenches 1,5-3 meters, filling water-feeding trench with water and recharging it to maintain constant water level by means of gate and spillway with raised spillway gate, building walling dam 1-1,5 meters high, limiting the part of deposit being processed in plan, with spillway, after that outputs of filtration flow into water-collecting trench are constructed which are fixed by wetting of upper slope for height of 1-2 meters, then spillway gate is lowered onto spillway spine, and that part of deposit is flooded with water for depth of 0,8-1,3 meters and this level is maintained for initial softening of argillaceous sands of gravel deposits, after that dredger plant is assembled, consisting of suck-in line with suction device, dredger itself and force sludge duct. At the end of force sludge duct, vortex generator is mounted together with hydrodynamic cavitator, due to which during launch of operation of dredger plant argillaceous sands of gravel deposits along the way from face and suction device of dredger to hydrodynamic cavitator are subjected to second stage of softening and disintegration, and in hydrodynamic cavitator - to third-stage final disintegration, and then are dispatched to dressing plant.

EFFECT: increased productiveness and extraction efficiency during extraction of natural and man-made gravel deposits due to efficient softening and disintegration of argillaceous sands of gravel deposits and release of valued components during hydro-transportation of sands to dressing equipment.

2 dwg

FIELD: mining industry.

SUBSTANCE: said geotechnological complex incorporates a trestle with a tumbling bucket, a tumbling module with a chute located inside the closed loop of trench for disintegrated rock accumulation. The chute is directed along the rock inflow. The tumbling bucket installation provides for possibility of linear and angular displacement in the vertical plane; the bucket has slots and L-shaped rippers.

EFFECT: improved efficiency of mining due to intensification of disintegration of rock with complex physical and mechanical properties during dredging and placer mining.

5 dwg

FIELD: mining industry.

SUBSTANCE: said complex is provided with a supported trestle and an ultrasonic and mechanical tumbling module. Rotatable ultrasonic radiation module is connected to movable carriage rim by means of a hub and sliding supports. The movable carriage is provided with a drive for moving it along the trestle cross beam and a drive for turning the ultrasonic radiation module around the movable carriage yoke axis. The rotatable ultrasonic radiation module has drives for moving the ultrasonic sources in the vertical plane, a dual drive for moving the ultrasonic sources in horizontal plane, sensors to determine the rock physical and mechanical state, and communication links with functional module of disintegration process automatic control system.

EFFECT: improved efficiency of mining due to intensification of disintegration of rock with complex physical and mechanical properties during dredging and placer mining.

2 dwg