Mounting method-resistant pile foundation

 

(57) Abstract:

The essence of the invention: mounting-resistant base speed of the shell is set up on the platform simultaneously with the immersion of the respective piles. The shell is fixed on the upper end of the pile and lowered until it touches the shell aperture. Then the shell is cut off from the pile and bury the pile into the ground to the calculated depth. Then cut off the protruding part of the pile, fix it to the supporting leg, disconnect the shell and pull it. 2 Il.

The invention relates to the field of hydraulic engineering construction and can be used for the installation of pile foundations. The known method of installation of pile foundations for stationary platforms, including the descent of the pile inside the support leg and mount it using the clamping device [1].

Clamping device mounted on the support leg. After launching and driving piles through pipelines in the elastic chamber is injected epoxy resin. Elastic Luggage expands and presses the metal prongs to the pile.

The disadvantage of this method is the complexity of the clamping device, the unreliability of mounting piles to support the foot, especially during a storm, when platfo Foundation, including installation on the seabed fixed platform with a hollow support legs, with the location of the upper ends of their under water and dive through the latter to the bottom of the piles and their subsequent attachment to the supporting feet [2].

The disadvantage of this method is that it does not allow for rigid attachment to the welding of driven piles to support the feet. Cementation of space between the dead pile and a support leg complex and costly labor. Cutting piles after driving on the level of the upper end of the support leg requires the use of special mechanical devices deployed inside piles. Under the action of wave loads unripe fruit cement the connection can be destroyed.

Also known mounting method-resistant pile foundations, including installation on the seabed fixed platform with a hollow support legs, with the location of the upper ends of their under water, having a circular aperture for mounting the cylindrical shell [3].

The disadvantage of this method is the complexity of installation of the cylindrical shell at the aperture when the depth of the water.

The aim of the invention is the provision of opportunities for execution of work performed stepwise, attached to the upper end of the pile, put the pile in supporting a hollow leg, after contact with the diaphragm disconnect cylindrical shell from piles and cutting the protruding part of the piles perform after driving the cutting tool from the inside to the estimated distance from the surface of the diaphragm.

In Fig.1 shows a pile Foundation, General view; Fig.2 - section a-a in Fig.1

The method is as follows. Fixed platform 1 (Fig.1) base 2 privacyrelated and by balancing sinks to the bottom 3. Fixed platform has a hollow support leg 4 (Fig.2) and mounted around the annular diaphragm 5. In advance of the edges of the upper end 6 of the piles 7 on the ropes and grabs 8 hung inventory stepped cylindrical shell 9 with the lower annular edge of the sealing gasket. On the upper end of the pile is fixed cable 10 crane (not shown), 11 - line of cut piles. After installation on the bottom 3 of the platform 1 with a crane rope 10 is lowered into the hollow support legs 4 pile 7 to its contact with the bottom 3, with a stepped cylindrical shell sits on the diaphragm 5. Cables and clamps 8 are detached from the upper end 6 of the pile 7. After the m (not shown) and cut off the pile on the current level of 11. Strupat upper cut pile part 7 to the loading crane and remove it from the stepped cylindrical shell 9. After that, the diver or the diver descends into the shell, secures the lower part of the shell to the diaphragm 5, and then pump out the water from the inside of the shell to complete drainage. Then weld the end of the leg 4 to the remaining part of the pile. Fill the shell with water, disconnect it from the diaphragm, remove the surface and hung on to the next pile, repeat the cycle.

Technical and economic advantage of the proposed method is a reliable weld joint supporting a hollow leg platform to the piles. This method allows cutting off the welding seam, use the platform to another point.

MOUNTING METHOD-RESISTANT PILE FOUNDATIONS, including a dive to the bottom of the waters of the platform with a hollow supporting legs and an annular orifice, the setting on the aperture of the cylindrical shell, the pile through the hollow legs with their subsequent attachment to the supporting legs, wherein the using step shell, and the installation of each casing on the platform are at the same time with the immersion of the respective piles by mounting the shell on top is from piles and exercise capacity piles and burying it in the ground until the computed depth then cut from the inside of the shell protruding portion piles on the calculated distance from the surface of the diaphragm, and after fixing the piles to support the leg is cut off from the diaphragm casing and remove the latter.

 

Same patents:

Metal hollow pile // 2004685

FIELD: mechanics.

SUBSTANCE: device for anchoring floating structures incorporates mooring bar with ends furnished with the appliance to turn the aforesaid rod about its axis of rotation. At that the rod free end is provided with a sleeve letting the chains or cable to pass there through. The anchor chain passed through one of the aforesaid sleeves is fastened at one end faces of the said floating structure. Besides that, to up the structure stability, the proposed device can be furnished with links connecting the free ends of both mooring rods to the structure in question.

EFFECT: anchoring system causing no floating structure trim difference and providing for stable positioning with minor drift, reduced distance between anchor and floating structure.

11 cl, 15 dwg

FIELD: mining.

SUBSTANCE: system for stabilisation of sea platform mounted of gravitation foundation and anchored at sea bottom consists of multitude of sets of upper blocking elements installed on keel at lower part of platform, of great number of caissons installed at sea bottom, of great number of removable insertions each installed in each of caissons and of set of lower blocking elements in each insertion. Each set of the lower blocking elements is designed to engage with one of sets of the upper blocking elements by means of block system, when the keel is set above caissons. Insertions correspond to a tight attached to the keel cementing material pumped into insertions through the keel. The system stabilises the platform relative to forces of lateral shear and also facilitates easy removal of the platform off the caissons with insertions attached to the keel by applying upper lifting force. Further the platform can be transported and mounted of the second set of caissons arranged at the second site of sea bottom.

EFFECT: group of inventions facilitating mounting of platform ensuring good resistance to lateral shear forces and eliminating difficult and expensive operations for installation of shear skirts.

19 cl, 9 dwg

FIELD: construction industry.

SUBSTANCE: installation method of bottom complex for performing works on shelf involves assembly of tower erected on the ground and consisting of cone- and taper-shaped sections mounted in series on foundation base with sealing skirt embedded in bottom. Foundation base is installed with hoisting winches and ropes on water-borne vehicle and transported to installation site. Foundation is lowered with coordinated rope movement to bottom. Complex is built up with sections as to height which is more than depth of complex installed on bottom of water area. Vertical position of longitudinal axis of complex is ensured with simultaneous operation of jacks and vibrators arranged on external side along the perimetre of the base. Internal volume of tower is dried. Removal method of bottom complex involves filling of internal tower volume with water. Water-borne vehicle is submerged by means of method of ballast water into tanks. Sag of ropes is chosen with hoisting winches and they are fixed. Ballast water is pumped from tanks. Vibrators and jacks are activated simultaneously till skirt of foundation completely comes out of bottom ground. Complex is transported to new installation place. Complex of equipment includes tower to be installed on ground, and water-borne vehicle. Tower has foundation base with enlarged surface area and sealing skirt, hollow housing with cross section decreasing as to height so that upper section of housing installed on the ground is located above water level. Water-borne vehicle has two hinged housings equipped with tanks, and ballast water receiving and discharge systems.

EFFECT: providing reliable installation of complex on unprepared bottom ground, stability of complex at lateral loads with no anchors available.

10 cl, 3 dwg

FIELD: transport.

SUBSTANCE: invention relates to sea oil extraction platforms. Proposed SPAR platform 200 comprises hull 2202 with central hast 204. Air- and watertight partition 210 runs across central shaft to make variable-buoyancy compartment 220 in central shaft. In compliance with some versions, central shaft bottom is exposed in sea, while in compliance with other versions, central shaft bottom is sealed. At least one pipe 224 to house riser 227 runs through partition and said variable-buoyancy compartment. Said pipe has exposed top face to allows drainage of water accumulated in central shaft to make air- and watertight seal in joint with bulkhead. In some versions, two or more air- and watertight partitions 206, 208, 210 are arranged across central shaft to form one or more air- and watertight ballast tanks 216, 218 arranged fixed between every adjacent pair of bulkheads.

EFFECT: increased platform buoyancy due to its adjustment by central shaft.

16 cl, 4 dwg

FIELD: construction.

SUBSTANCE: ice-resistant support block of a marine engineering facility comprises a cylindrical shaft, a support unit and supporting braces. The shaft is made as hollow. The shaft is hingedly connected to supporting braces. The support unit comprises a support ring. The support ring is formed by at least three rectilinear pontoons. Pontoons are rigidly connected by their ends. The support ring is rigidly fixed to the cylindrical shaft by hollow radial spacers. Supporting braces are rigidly connected to the support ring by lower ends. Pontoons of the support ring, radial spacers, a cylindrical shaft and hollow supporting braces are made as capable of their floatability adjustment from positive to negative one.

EFFECT: invention provides for the possibility of serial construction, reduced labour intensiveness of installing a support block on site and its removal from soil, high repairability and capability of re-equipment in the dock.

8 cl, 6 dwg

FIELD: construction.

SUBSTANCE: method to install a platform support block provides for support block transportation, its submersion to the sea bottom and installation onto soil. Ballast reservoirs are used during transportation. Ballast reservoirs are inner cavities of structure elements. During installation the first installation unit is ballasted down. The shaft is put into vertical position. Its eyes are brought to the level above sea surface. Spacers are ballasted to ensure hinged connection of their eyes with eyes of the vertical shaft. The ballast is pumped from the support ring pontoons and/or radial spacers and/or vertical shaft. Spacer ends are put in contact with the support ring due to slight surfacing up of the first installation unit. Spacers are rigidly fixed. Assembly pontoons are ballasted. Its lowering to the prepared bottom section is provided.

EFFECT: simplicity of structure installation, possibility of serial construction, high repairability and possibility of re-equipment in the dock.

6 dwg

FIELD: construction.

SUBSTANCE: superstructure is built on a building slip in a dock on a support deck installed on side walls of the dock. A transport barge that has taken the ballast is introduced into the dock under the superstructure, and the superstructure is installed by means of ballast pumping away from the barge on its deck with its subsequent transportation to a marine oil and gas field. A hydraulic engineering pocket is arranged in place of installation of a support part of a marine oil and gas production facility on the marine oil and gas field. Length, width and depth of the latter make it possible to lead the transport barge to the support part, to install the superstructure onto the support part after taking the ballast by the transport barge, and also to move the transport barge away from the marine oil and gas field after pumping of ballast from it.

EFFECT: invention makes it possible to eliminate using additional crane facilities for transportation and assembly of a superstructure of marine oil and gas production facilities onto a transport barge, and possibility to exclude construction of a marine channel for passage of a transport barge to an oil and gas field in shallow waters.

16 dwg

FIELD: machine building.

SUBSTANCE: proposed system comprises foundation 12, hydroelectric turbine 10 to rest on said foundation 12, and afloat sea ship 14 that allows detachment of said foundation. Ship 1 allows detachment of foundation 12 and its lowering, and/or lifting to position right under the ship, and its attachment to ship. Foundation 12 comprises support 32 to pass upward through ship 14 when foundation 14 is attached to ship from below. Ship 14 has opening 30 for foundation 32 to pass through when foundation 12 is mounted under ship 14 to allow turbine 10 mounted on support 32 to pass there through.

EFFECT: simplified mounting.

13 cl, 7 dwg

FIELD: construction.

SUBSTANCE: shoe comprises a body and a unit of shoe attachment to a support pillar. It has zero or positive buoyancy and is arranged as capable of changing zero or positive buoyancy to buoyancy of a low negative value. The shoe body comprises a hole for stretching of a support pillar, besides, the specified hole is arranged in the centre of the shoe and comprises vertical guide slots for interaction with racks of the support pillar. The unit of shoe attachment to the support pillar comprises two stops, every of which is equipped with a guide sleeve placed in a body, a sliding block installed in the guide sleeve, and a manual drive to move the block in the guide sleeve.

EFFECT: simplified assembly of a shoe to a pillar.

11 cl, 5 dwg

FIELD: construction.

SUBSTANCE: invention relates to hydraulic engineering construction of structures and may be used for year-round drilling under conditions of the Arctic shelf. The platform comprises a bottom ballasted plate with an inbuilt support unit and a superstructure. The bottom plate is made in the form of an upper part, a lower part and a sliding sectional support unit of telescopic type. The support unit comprises telescopic sections that are separated at the installation point with a sliding mechanism. Telescopic sections, the sliding mechanism and all required auxiliary devices are installed in sluice compartments. All telescopic sections are of identical height, cylindrical or prismatic shape, and comprise guide slots on the inner and outer surface. Inner and outer cuts of the sections are selected for each other so that arrangement of sections is provided within each other with a gap sufficient for sliding and sealing of sections along the section guides relative to each other, in accordance with the telescope principle. The lower section's cut is larger than the upper one's. Sections of the support unit are arranged in a reinforced ice version. The invention also discloses methods of transportation, assembly and disassembly of a self-lifting mobile ice-resistant drilling platform of telescopic type.

EFFECT: increased reliability of a platform, lower labour intensiveness of methods of its transportation, assembly and dismantling.

13 cl, 3 dwg

FIELD: machine building.

SUBSTANCE: proposed system comprises foundation 12, hydroelectric turbine 10 to rest on said foundation 12, and afloat sea ship 14 that allows detachment of said foundation. Ship 1 allows detachment of foundation 12 and its lowering, and/or lifting to position right under the ship, and its attachment to ship. Foundation 12 comprises support 32 to pass upward through ship 14 when foundation 14 is attached to ship from below. Ship 14 has opening 30 for foundation 32 to pass through when foundation 12 is mounted under ship 14 to allow turbine 10 mounted on support 32 to pass there through.

EFFECT: simplified mounting.

13 cl, 7 dwg

FIELD: construction.

SUBSTANCE: foundation of a floating massif installed onto a base by a float-on method, being a part of the floating massif, includes a shell that widens towards the bottom. The geometry of the shell provides for gravitational leakage of loose material from it, the reserve of which the shell holds, and its lower outlet hole is closed with a gate retained in the closed condition with the help of links that transfer forces from the gate weight and loose material weight to the massif body.

EFFECT: higher manufacturability of the process, provision of structure stability, higher shift stiffness and strength under action of horizontal shifting loads.

6 cl, 3 ex, 1 tbl, 20 dwg

FIELD: construction.

SUBSTANCE: support structure of a marine complex, designed for installation in shallow water, is characterised by the fact that it comprises at least two supports installed in shallow water, every support is made of at least one rigid shell closed along the perimetre and filled inside with stone material, besides, the lower shell of the support is installed on the sea bottom, and each of the above installed shells in the lower part is made of smaller size along the perimeter that the perimetre of the upper part of the more lower shell. Besides, at least a part of the upper shell is made with a cone shape. Each support is made as capable of installation of process objects and equipment of the marine complex and placement of elements that combine separate process objects into a whole marine complex between supports. The specified upper shell has a diameter in the range from 30 to 60 metres.

EFFECT: provision of efficient protection against ice and wave loads, reduction of construction time, lower material intensity.

24 cl, 12 dwg

FIELD: construction.

SUBSTANCE: installation method of a supporting structure at sea or river bottom, in which a supporting structure is installed, which is capable of standing independently for some time, being rather heavy to be retained in position by friction at sea or river bottom, before operations are performed which are required for constant fixture of the supporting structure at sea or river bottom and during their performance. The above structure includes a variety of anchoring points intended for interaction with supporting devices having a possibility of their position control and contacting to the sea or river bottom. Besides, each of the above said devices has a possibility of receiving and setting to the specified position of anchors. The method involves the following stages, at which transportation of the supporting structure and its submersion to the sea or river bottom is performed by means of an installation ship. It involves the stages, at which the supporting structure is installed at the specified level and with the specified orientation relative to the sea or river bottom by means of supporting devices. Anchorage of the supporting structure is performed to the sea or river bottom with anchors by means of devices supported from the supporting structure in order to ensure possible manipulation of anchors and their submersion.

EFFECT: providing reliability of a structure; reducing material consumption and labour intensity.

17 cl, 10 dwg

FIELD: construction.

SUBSTANCE: group of inventions relates to jack-up drilling platforms in general and to a foundation, which may be used for a jack-up drilling platform, in particular. A foundation 10 equipped with a skirt, designed for installation onto a sea bottom with quite soft material above the bed of the base, comprises a shoe support 12, having an upper part and a foot 16, and a skirt 20, having an upper edge, which is connected as an integral part with the shoe support 12 and protrudes down, surrounding the foot 16, and a lower edge 25 for introduction into the sea bottom. The upper part and the foot 16 are connected along the perimeter and form an outer edge 14, besides, both the upper part and the foot 16 have flat or conical configuration. One support 40 of the jack-up drilling platform is installed on the upper part. The foot 16 has a flat base or a descending slope. The skirt 20 contains multiple circumferential holes 22, which adjoin the foot 16 of the shoe support 12 and arranged within the upper half of the skirt 20 height. Configuration of holes 22 provides for release of soft material from inner space defined by the skirt 20 and foot 16, during foundation 10 submersion into the sea bottom, at the same time the soft material is not gripped inside the foundation 10 equipped with the skirt. The foundation 10 equipped with the skirt is made as capable of introduction into the bed of the base for efficient depth. The jack-up drilling platform comprises a working platform, multiple supports 40 and multiple foundations 10 equipped with the skirt given above. Each support 40 has two ends, one of which is connected to the working platform to ensure support, and the other one - with one foundation 10 equipped with the skirt, so that foundations 10 equipped with the skirt provide for fixation and support of the jack-up drilling platform. The method to install the foundation 10 equipped with the skirt designed for installation on the sea bottom with quite soft material above the bed of the base, contains foundation slope into the soft material on the sea bottom and simplified release of soft material from the inner space, defined by the skirt 20 and foot 16, via multiple circumferential holes 22, thus increased capacity of the foundation.

EFFECT: group of inventions provides for increased bearing capacity of a jack-up drilling platform and a foundation equipped with a skirt.

25 cl, 3 dwg

FIELD: construction.

SUBSTANCE: group of inventions relates to hydrotechnical construction and can be used for creation and operation of offshore pile-gravity platforms for exploration of continental shelf hydrocarbon resources. Platform comprises superstructure, body with foundation, equipped with slots in form of direct correct cylinder, through which piles are installed. At that, piles are equipped with heads in form of inverted truncated regular cones with base diameters, smaller than diameter of slots in foundation, mounted on piles buried into slots with head cone base gradient above slot top.

EFFECT: technical result consists in improvement of platform stability and reduction of materials consumption.

10 cl, 5 dwg

FIELD: construction.

SUBSTANCE: hydroelectric turbine system having a base comprising a frame, a plurality of racks extending from the frame, and at least one load bearing member extending from the base in a position providing, in use, the base resistance to overturning. The load-bearing element has an arrangement and dimensions ensuring to it the elevated position above the installation site surface, when the plurality of racks are in contact with and supported by said surface.

EFFECT: ensuring the reliable turbine location without the risk of overturning without the need of a fastening, simplifying the installation and maintenance of the turbine system.

10 cl, 3 dwg