Lost cap for erection of bored pile

FIELD: construction.

SUBSTANCE: invention is related to the field of construction, in particular, to technical facilities for erection of pile foundation erected from bored piles. Lost cap for erection of bored pile in the form of cone-shaped body is made of two parts, upper part of which represents truncated cone, and lower part is formed by bearing rod fixed in cantilever manner from the side of lower base along its symmetry axis with rippers in the form of radially installed plates.

EFFECT: reduction of head resistance and easier intrusion of guide tube in earth.

3 cl, 2 dwg

 

The invention relates to the field of construction, in particular to technology for the construction of pile Foundation under construction of bored piles.

A known method of construction of bored piles, which consists in the fact that the inventory of the casing, closed with submersible losing end of a conical tip, introducing into the soil by giving her a rotational movement and an axial vertical force. Moving into the ground, the tip pushing it and, overcoming the natural density further increases, resulting in increase of the normal stress acting on the side wall of the casing. After reaching the final project mark in it enter reinforcing cage, and then the concrete mass. Filling the cavity of the casing, retrieve it, giving it a rotary motion, which reduces the frictional force of the ground on the side surface of the casing. While the tip remains in the soil at the base of the concrete body of the pile, tightly bonded with him [A.S. USSR №1730356, CL E02D 5/38, publ. 30.04.92].

The known method has the disadvantage, which is that in the process of immersion of the casing into the soil to lose the tip has to overcome considerable resistance of the soil. This is due primarily to the fact that before the tip is formed compacted the second soil core with density, exceeding the natural density. The main part of the pressing efforts by immersing mechanism is spent to overcome this drag. Another smaller part is spent on overcoming the frictional forces on the side surface of the casing. The cause of compacted core is conical shaped lose the tip, forming on the surface of which there is a force perpendicular to this surface, decaying on the axial and lateral components. The first force before the tip of the core of high-density, squeezing already naturally compacted soil. Second force overcomes the ground to the side sealing wall for future wells.

Thus, the task of the invention is to facilitate the process of diving into the ground casing by reducing the drag on the losing end.

The problem is solved due to the fact that losing point made in the form of a conical body, consists of two parts, the upper of which is a truncated cone, and the lower part consists of fixed cantilever from the side of the smaller base on its symmetry axis bearing rod with rippers in the form of radially installed plates arranged along a helical line. Plates are mounted with angle of attack in napravleniyami tip, not greater than the friction angle of the soil.

The technical essence of the invention lies in the fact that during rotary movement of the casing with a lost tip is the loosening of the soil, allowing, ultimately, to destroy the concentration kernel before tip, and thus reduce drag and to facilitate the implementation of the casing into the ground.

Figure 1 is given a schematic representation of the process of immersion of the casing with the tilling of the soil. Figure 2 - General view of the design are losing tip, providing the tilling of the soil.

In the process of construction of bored piles used inventory casing 1, dip the end of which is mounted a losing point 2. The latter is a cone-shaped body consisting of two parts. The upper part is a monolithic truncated cone 3, provided with a means of communication with casing pipe (not shown), and the lower part is made in the form of a cutter formed by a supporting rod 4 fixed console from the smaller base of the upper part 3. The rod 4 is installed on the axis of symmetry forming a cone tip 2 and equipped with rippers, which are made in the form of cutting plates 5, mounted radially on the shaft 4 and arranged in a helical line. Each plate is installed with coal is m attack "α" in the direction of rotation of the handpiece, which does not exceed the friction angle of the soil.

We offer losing point works as follows.

The casing 1 is installed on the axis of the future of bored piles and tell her clockwise rotation torque "T", supplemented by external axial force "F". Tip 2 associated with the pipe 1, is embedded in the ground and making a rotational movement of its lower part, made in the form of cutters, destroys the soil, rihla it. Advancing lose the tip 2 is completely embedded in the soil and in the zone of compacted core "And" loosens the latest cutting plates 5, which not only cut, but also due to their inclination angle "α" stand on the periphery. The upper part 3 of the tip of the loosened soil shifts in the radial direction and it condenses, creating residual stresses. It is known that loosened the soil easier to seal. The arrangement of the plates 5 and helix creates additional opportunities that promote the installation of casing pipe - tip in the ground. Upon reaching the design elevation of the depth of immersion of the future of bored piles with casing pipe 1, using a rotational movement in the opposite direction, retrieve, but not earlier, than it will be filled with the reinforcing cage and concrete mass.

1. Losing point for the construction of bored piles, ypolnennye in the form of a conical body, characterized in that it consists of two parts, the upper part of which is a truncated cone, and the lower part consists of fixed cantilever from the side of the smaller base on its symmetry axis bearing rod with rippers in the form of radial plates installed.

2. Lose the handpiece according to claim 1, characterized in that the plates are arranged on the rod along a helical line.

3. Lose the handpiece according to claim 1, characterized in that the plate is installed with the angle of attack in the direction of rotation of the tip, not to exceed the friction angle of the soil.



 

Same patents:

FIELD: building, particularly to erect foundation bases in permafrost ground.

SUBSTANCE: method for tubular pile driving in permafrost ground involves drilling hole; installing pile in the hole and leaving it as it is inside the hole up to thermal permafrost ground regime recovery. To install pile in the ground inventive insert having diameter smaller than hole diameter in lowered in hole along central hole axis. Space between the insert and hole wall is filled with loose ground. Then the pile having inner diameter practically equal to outer diameter of the insert and opened lower end is driven in the loose ground. After that the insert is removed from hole. Other variants of pile driving are also disclosed.

EFFECT: increased building and assembly job efficiency due to decreased time of pile freezing in permafrost ground and improved load-bearing capacity of piles.

11 cl, 8 ex, 4 dwg

FIELD: building, particularly foundation and retaining wall erection with the use of injection piles.

SUBSTANCE: injection pile comprises concrete shaft formed directly in well and comprising reinforcing cage made as metal injection pipe lowered in well to refusal and spaced from well wall. The injection pipe is provided with lower perforated section having side injection orifices arranged in several layers beginning from lower injection pipe end. Well diameter is not more than 3d, where d is outer injection pipe diameter. Perforated section length is more than 3d, but less than L and is equal to (0.2-0.7)L, where L is well depth. Retaining wall is built on pile foundation comprising injection piles. The retaining wall includes reinforcing cage made as metal pipe having upper part used as head. The retaining wall is composed of concrete blocks laid in several rows one upon another. Blocks of lower row form retaining wall base. At least upper block installed on lower one has through orifice, which is vertically aligned with mounting orifice formed in lower block. Common cavity defined by above orifices is reinforced and concreted.

EFFECT: simplified structure, reduced cost of pile foundation and retaining wall construction.

21 cl, 3 ex, 3 dwg

FIELD: building, particularly to create bored piles in cased wells during building and building structure foundation erection.

SUBSTANCE: method involves heating ground surrounding place of pile erection and heating concrete mix with induction heater. The concrete mix is vibratory treated in pulsed mode at the beginning of heating operation by applying electromagnetic field generated by induction heater to metal reinforcement bars, wherein high-frequency current of induction heater is subjected to low-frequency modulation. At concrete mix setting beginning the pulsed mode is changed into high-voltage one. Device for above method realization comprises induction heater comprising steel pipe put on asbestos-cement pile casing pipe and winding made of copper coiled bus linked with high-frequency power source. The winding is connected to metal pipe. Diametrical longitudinal orifices are made in the steel pipe. The power source comprises circuit providing high-frequency current modulation with low frequency.

EFFECT: possibility of simultaneous heat and vibration application to concrete mix, reduced cost of the device along with reduced number of working tools, simplified control, provision of concrete shrinkage and compaction under heating, which is performed by single device.

2 cl, 4 dwg

FIELD: building, particularly to erect cast-in-place pile having large diameter in collapsible ground layer of large thickness.

SUBSTANCE: method involves drilling pilot hole; installing casing pipe connected to puncher; punching the well ground by dropping load on the puncher through casing pipe to reach design point and enlarging the casing pipe; arranging reinforcement case in the pipe; filling the well with concrete mix as casing pipe moves upward; compacting the concrete mix. In the case of pile with 300-1500 mm diameter forming and in the case of collapsible ground layer thickness up to 18 m or 18-50 m ratio between pilot hole depth and collapsible ground thickness is 1:(4.5-6) and 1:(1.5-5). The puncher has reinforced concrete tip and head made of tube with outer diameter equal to inner diameter of pilot hole. Welded to the head are centering rings. The tip has ring to engage thereof with technological control rod provided with thread, washer with retainers and nut on opposite end thereof. Ratio of height H of upper head part provided with centering rings to length of casing pipe to be installed in the head is 1:(20-30). Ratio between outer puncher diameter D and outer diameter d at tapered part ℓ thereof is equal to 1:0.8. Length ratio between cylindrical head part L and cylindrical tapered part ℓ is equal to 1:0.6. Angles γ of head and head transition area leading to tapered part ℓ are equal to 30°. Difference between outer puncher diameter D to outer casing pipe T diameter is 90-100 mm.

EFFECT: reduced labor inputs and decreased material consumption.

2 dwg

Pile // 2263746

FIELD: foundation building.

SUBSTANCE: pile has body made as shell filled with concrete and formed as members having trough-shaped cross-sections and extending in longitudinal direction. Members have side walls abutting the central wall and extending at obtuse angles from it. The shell has frame. Central walls of frame members are of ellipsoid shape and filled with concrete.

EFFECT: increased load-bearing capacity and reliability.

5 dwg

FIELD: building, particularly pile foundation erection.

SUBSTANCE: method involves drilling hole; installing injection pipe in the hole bottom center; installing reinforcement case; injecting cement-and-sand grout through the injection pipe below lower pile end for ground compaction and widened part arrangement; concreting the pile. To create widened part of the pile and to compact ground after concrete hardening cement-and-sand grout is fed under pressure into sealed bag formed of elastic water impermeable material and connected to lower end of ejection pipe so that cement-and-sand grout expands the bag up to reaching necessary bag volume.

EFFECT: increased economy of pile forming, increased ability of clay ground compaction at pile base.

4 dwg, 1 ex

FIELD: building, particularly foundation building, namely for erecting pile foundations in seasonally freezing ground.

SUBSTANCE: method involves forming well extending for the full thickness of seasonally freezing ground layer, wherein well diameter increases pile diameter; installing heater in the well; transferring heat; driving casing pipe with detachable tip in ground through heater cavity; concreting well bore along with simultaneous lifting casing pipe and removing heater. Heat is supplied to concrete mixture within the limits of seasonally freezing ground after casing pipe removal. Inductor made as copper wire coil covered with heat-protective layer and located outside metal pipe is used as the heater. Heating is performed within 10-12 hours along with maintaining 75-80°C temperature of concrete mix by regulating inductor power up to obtaining concrete strength equal to 80% of design strength. After inductor removal from the well gap formed between well wall and pile body is filled with non-heaving ground.

EFFECT: reduced power inputs along with maintaining high productivity and increased load-bearing pile capacity.

2 cl, 3 dwg

FIELD: building, particularly for erecting support structures, namely pile foundations, injection anchors, walls in ground, cast-in-place reinforced earth constructions and other geotechnic structures used for new building erection or reconstruction of existent buildings.

SUBSTANCE: method involves forming well or trench section in ground; at least partly filling thereof with hardening material or drilling agent, for instance with cement-bentonite one; substituting thereof with hardening material; immersing reinforcing cage with outer flexible shell connected to at least part of cage length in well. The flexible shell is permeable for liquid fraction of the hardening material and provides waterproofing of the cage after setting of above material and hardening material located outside the shell. Shell parameters are determined from the given correlations.

EFFECT: increased load-bearing capacity, reliability and service life, extended field of application.

24 cl, 9 dwg

FIELD: building, particularly cast-in-place building units, namely support structures.

SUBSTANCE: reinforced concrete column is formed in retained formwork and consists of upper support part and lower foundation part. Column includes reinforcement frame grouted with concrete mix and embedded members arranged in upper column part. Upper part of frame is located in retained formwork. Embedded members are in level with foundation slab marks and with flooring panel marks. Embedded members are formed as closed contours with stiffening ribs. Column is built in single- or multi-slot hollow. Projection of geometric retained formwork cross-section center coincides with that of lower reinforcement frame part. Arms of lower reinforcement form part extending in Y-axis direction are sized in accordance with given mathematical relation. Method of column erection involves forming single- or multi-slot hollow; producing reinforcement form with embedded members; forming retained formwork; installing above components; vertically placing the reinforcement frame in hollow so that frame is spaced a distance from hollow bottom; vertically adjusting and fixing upper column part to prevent transversal displacement thereof; grouting lower column part in bottom-top direction; grouting inner retained formwork area of upper column part. Hollow has dimensions measured in Y-axis direction determined from given relation.

EFFECT: possibility of simultaneous building erection in upward and downward directions relative ground level.

7 cl, 13 dwg

FIELD: building and construction.

SUBSTANCE: method includes serial vibration immersion of inventory elements into soil, which are mated between each other, and their following vibration extraction with concurrent filling of hollow in soil with concrete mixture. Inventory elements are used, which are made in form of profiled posts, having gates in lower portion, closed during immersion in soil and opened by flexible links during extraction of elements from soil and feeding of concrete mixture. At the same time profiled elements of longitudinal walling have lesser length, than length of profiled elements of vertical posts, which during immersion are pressed in for greater depth than profiled elements of longitudinal walling. First, profiled element of longitudinal walling is immersed, and then via guiding conductor profiled element of vertical post is densely mated to it and is than immersed. Concrete mixture is loaded in profiled element of longitudinal walling with its extraction with open gates and extracted element is immersed in next position adjacently to previous profiled element of vertical post being in soil. Concrete mixture is loaded into profiled element of vertical post during its extraction with open gates and extracted element if immersed into following position with concurrent mating to previous profiled element of longitudinal walling with use of guiding conductor. Then inventory elements are immersed again. Device for construction of bearing-limiting structures in soil includes crane or pile driver with vertical guide, vibration immersion driver and at least two inventory hollow elements. Inventory elements are made in form of profiled elements of longitudinal walling and profiled elements of vertical posts. Profiled elements of longitudinal walling have length less than length of profiled elements of vertical posts, which are made of hollow rectangular profiles, rigidly interconnected by solid rib along transverse axis along whole height of element, while vertical guide in lower portion is provided with guiding conductor.

EFFECT: higher efficiency, broader functional capabilities.

2 cl, 13 dwg

FIELD: building structures, particularly shallow foundations.

SUBSTANCE: method involves creating well by ground excavation, introducing preparatory portion of hardening material in well hollow including calculated part of hardening material; arranging explosive charge in lower well part; securing explosive charge; blowing explosive charge up to create cavity for widened foundation post part; crushing and widening above calculated part after explosion; introducing additional portion of hardening concrete in well up to 4/5 of well height; filling it with calculated part of above material portion. Concrete for casting is used as preparatory hardening material.

EFFECT: reduced time, increased simplicity of foundation building and reliability.

2 cl, 5 dwg

FIELD: building and construction.

SUBSTANCE: method includes serial vibration immersion of inventory elements into soil, which are mated between each other, and their following vibration extraction with concurrent filling of hollow in soil with concrete mixture. Inventory elements are used, which are made in form of profiled posts, having gates in lower portion, closed during immersion in soil and opened by flexible links during extraction of elements from soil and feeding of concrete mixture. At the same time profiled elements of longitudinal walling have lesser length, than length of profiled elements of vertical posts, which during immersion are pressed in for greater depth than profiled elements of longitudinal walling. First, profiled element of longitudinal walling is immersed, and then via guiding conductor profiled element of vertical post is densely mated to it and is than immersed. Concrete mixture is loaded in profiled element of longitudinal walling with its extraction with open gates and extracted element is immersed in next position adjacently to previous profiled element of vertical post being in soil. Concrete mixture is loaded into profiled element of vertical post during its extraction with open gates and extracted element if immersed into following position with concurrent mating to previous profiled element of longitudinal walling with use of guiding conductor. Then inventory elements are immersed again. Device for construction of bearing-limiting structures in soil includes crane or pile driver with vertical guide, vibration immersion driver and at least two inventory hollow elements. Inventory elements are made in form of profiled elements of longitudinal walling and profiled elements of vertical posts. Profiled elements of longitudinal walling have length less than length of profiled elements of vertical posts, which are made of hollow rectangular profiles, rigidly interconnected by solid rib along transverse axis along whole height of element, while vertical guide in lower portion is provided with guiding conductor.

EFFECT: higher efficiency, broader functional capabilities.

2 cl, 13 dwg

FIELD: building, particularly cast-in-place building units, namely support structures.

SUBSTANCE: reinforced concrete column is formed in retained formwork and consists of upper support part and lower foundation part. Column includes reinforcement frame grouted with concrete mix and embedded members arranged in upper column part. Upper part of frame is located in retained formwork. Embedded members are in level with foundation slab marks and with flooring panel marks. Embedded members are formed as closed contours with stiffening ribs. Column is built in single- or multi-slot hollow. Projection of geometric retained formwork cross-section center coincides with that of lower reinforcement frame part. Arms of lower reinforcement form part extending in Y-axis direction are sized in accordance with given mathematical relation. Method of column erection involves forming single- or multi-slot hollow; producing reinforcement form with embedded members; forming retained formwork; installing above components; vertically placing the reinforcement frame in hollow so that frame is spaced a distance from hollow bottom; vertically adjusting and fixing upper column part to prevent transversal displacement thereof; grouting lower column part in bottom-top direction; grouting inner retained formwork area of upper column part. Hollow has dimensions measured in Y-axis direction determined from given relation.

EFFECT: possibility of simultaneous building erection in upward and downward directions relative ground level.

7 cl, 13 dwg

FIELD: building, particularly for erecting support structures, namely pile foundations, injection anchors, walls in ground, cast-in-place reinforced earth constructions and other geotechnic structures used for new building erection or reconstruction of existent buildings.

SUBSTANCE: method involves forming well or trench section in ground; at least partly filling thereof with hardening material or drilling agent, for instance with cement-bentonite one; substituting thereof with hardening material; immersing reinforcing cage with outer flexible shell connected to at least part of cage length in well. The flexible shell is permeable for liquid fraction of the hardening material and provides waterproofing of the cage after setting of above material and hardening material located outside the shell. Shell parameters are determined from the given correlations.

EFFECT: increased load-bearing capacity, reliability and service life, extended field of application.

24 cl, 9 dwg

FIELD: building, particularly foundation building, namely for erecting pile foundations in seasonally freezing ground.

SUBSTANCE: method involves forming well extending for the full thickness of seasonally freezing ground layer, wherein well diameter increases pile diameter; installing heater in the well; transferring heat; driving casing pipe with detachable tip in ground through heater cavity; concreting well bore along with simultaneous lifting casing pipe and removing heater. Heat is supplied to concrete mixture within the limits of seasonally freezing ground after casing pipe removal. Inductor made as copper wire coil covered with heat-protective layer and located outside metal pipe is used as the heater. Heating is performed within 10-12 hours along with maintaining 75-80°C temperature of concrete mix by regulating inductor power up to obtaining concrete strength equal to 80% of design strength. After inductor removal from the well gap formed between well wall and pile body is filled with non-heaving ground.

EFFECT: reduced power inputs along with maintaining high productivity and increased load-bearing pile capacity.

2 cl, 3 dwg

FIELD: building, particularly pile foundation erection.

SUBSTANCE: method involves drilling hole; installing injection pipe in the hole bottom center; installing reinforcement case; injecting cement-and-sand grout through the injection pipe below lower pile end for ground compaction and widened part arrangement; concreting the pile. To create widened part of the pile and to compact ground after concrete hardening cement-and-sand grout is fed under pressure into sealed bag formed of elastic water impermeable material and connected to lower end of ejection pipe so that cement-and-sand grout expands the bag up to reaching necessary bag volume.

EFFECT: increased economy of pile forming, increased ability of clay ground compaction at pile base.

4 dwg, 1 ex

Pile // 2263746

FIELD: foundation building.

SUBSTANCE: pile has body made as shell filled with concrete and formed as members having trough-shaped cross-sections and extending in longitudinal direction. Members have side walls abutting the central wall and extending at obtuse angles from it. The shell has frame. Central walls of frame members are of ellipsoid shape and filled with concrete.

EFFECT: increased load-bearing capacity and reliability.

5 dwg

FIELD: building, particularly to erect cast-in-place pile having large diameter in collapsible ground layer of large thickness.

SUBSTANCE: method involves drilling pilot hole; installing casing pipe connected to puncher; punching the well ground by dropping load on the puncher through casing pipe to reach design point and enlarging the casing pipe; arranging reinforcement case in the pipe; filling the well with concrete mix as casing pipe moves upward; compacting the concrete mix. In the case of pile with 300-1500 mm diameter forming and in the case of collapsible ground layer thickness up to 18 m or 18-50 m ratio between pilot hole depth and collapsible ground thickness is 1:(4.5-6) and 1:(1.5-5). The puncher has reinforced concrete tip and head made of tube with outer diameter equal to inner diameter of pilot hole. Welded to the head are centering rings. The tip has ring to engage thereof with technological control rod provided with thread, washer with retainers and nut on opposite end thereof. Ratio of height H of upper head part provided with centering rings to length of casing pipe to be installed in the head is 1:(20-30). Ratio between outer puncher diameter D and outer diameter d at tapered part ℓ thereof is equal to 1:0.8. Length ratio between cylindrical head part L and cylindrical tapered part ℓ is equal to 1:0.6. Angles γ of head and head transition area leading to tapered part ℓ are equal to 30°. Difference between outer puncher diameter D to outer casing pipe T diameter is 90-100 mm.

EFFECT: reduced labor inputs and decreased material consumption.

2 dwg

FIELD: building, particularly to create bored piles in cased wells during building and building structure foundation erection.

SUBSTANCE: method involves heating ground surrounding place of pile erection and heating concrete mix with induction heater. The concrete mix is vibratory treated in pulsed mode at the beginning of heating operation by applying electromagnetic field generated by induction heater to metal reinforcement bars, wherein high-frequency current of induction heater is subjected to low-frequency modulation. At concrete mix setting beginning the pulsed mode is changed into high-voltage one. Device for above method realization comprises induction heater comprising steel pipe put on asbestos-cement pile casing pipe and winding made of copper coiled bus linked with high-frequency power source. The winding is connected to metal pipe. Diametrical longitudinal orifices are made in the steel pipe. The power source comprises circuit providing high-frequency current modulation with low frequency.

EFFECT: possibility of simultaneous heat and vibration application to concrete mix, reduced cost of the device along with reduced number of working tools, simplified control, provision of concrete shrinkage and compaction under heating, which is performed by single device.

2 cl, 4 dwg

FIELD: building, particularly foundation and retaining wall erection with the use of injection piles.

SUBSTANCE: injection pile comprises concrete shaft formed directly in well and comprising reinforcing cage made as metal injection pipe lowered in well to refusal and spaced from well wall. The injection pipe is provided with lower perforated section having side injection orifices arranged in several layers beginning from lower injection pipe end. Well diameter is not more than 3d, where d is outer injection pipe diameter. Perforated section length is more than 3d, but less than L and is equal to (0.2-0.7)L, where L is well depth. Retaining wall is built on pile foundation comprising injection piles. The retaining wall includes reinforcing cage made as metal pipe having upper part used as head. The retaining wall is composed of concrete blocks laid in several rows one upon another. Blocks of lower row form retaining wall base. At least upper block installed on lower one has through orifice, which is vertically aligned with mounting orifice formed in lower block. Common cavity defined by above orifices is reinforced and concreted.

EFFECT: simplified structure, reduced cost of pile foundation and retaining wall construction.

21 cl, 3 ex, 3 dwg