Method for constructing bearing/limiting structures and device for realization of said method

FIELD: building and construction.

SUBSTANCE: method includes serial vibration immersion of inventory elements into soil, which are mated between each other, and their following vibration extraction with concurrent filling of hollow in soil with concrete mixture. Inventory elements are used, which are made in form of profiled posts, having gates in lower portion, closed during immersion in soil and opened by flexible links during extraction of elements from soil and feeding of concrete mixture. At the same time profiled elements of longitudinal walling have lesser length, than length of profiled elements of vertical posts, which during immersion are pressed in for greater depth than profiled elements of longitudinal walling. First, profiled element of longitudinal walling is immersed, and then via guiding conductor profiled element of vertical post is densely mated to it and is than immersed. Concrete mixture is loaded in profiled element of longitudinal walling with its extraction with open gates and extracted element is immersed in next position adjacently to previous profiled element of vertical post being in soil. Concrete mixture is loaded into profiled element of vertical post during its extraction with open gates and extracted element if immersed into following position with concurrent mating to previous profiled element of longitudinal walling with use of guiding conductor. Then inventory elements are immersed again. Device for construction of bearing-limiting structures in soil includes crane or pile driver with vertical guide, vibration immersion driver and at least two inventory hollow elements. Inventory elements are made in form of profiled elements of longitudinal walling and profiled elements of vertical posts. Profiled elements of longitudinal walling have length less than length of profiled elements of vertical posts, which are made of hollow rectangular profiles, rigidly interconnected by solid rib along transverse axis along whole height of element, while vertical guide in lower portion is provided with guiding conductor.

EFFECT: higher efficiency, broader functional capabilities.

2 cl, 13 dwg

 

The proposed method and device relate to the field of construction and can be used in the construction chosen to replace concrete-frame structures in the soil, in particular in the construction of retaining walls.

The known method and device for erecting ramming piles, including the vibration exciter with buried in the ground hollow composite body of the two longitudinal sections. The vibration exciter creates vibrations along the longitudinal axis of the housing and the components of its longitudinal partitions have the opportunity to move relative to each other (ABT. mon. The USSR №1236062, BI No. 21 from 07.06.86,, CL E 02 D 7/26).

The known method and device construction ramming piles, including the vibration exciter, which in the soil is immersed casing pipe or duct, the lower end of which is blocked by a detachable Shoe. After immersion of the pipe or duct to the required depth and fill the cavity with concrete, pipe or duct begin to extract and separate from them Shoe at a fixed distance, not exceeding the height of the layer of concrete mixture, perceiving the vertical vibration of the Shoe. Then make further extraction pipes or trunking. Through the space formed between the Shoe and the pipe (duct) concrete mixture flows from the pipe or duct and fills the cavity in the ground. Thus, in the ground form od the night cylindrical or prismatic supports (ed. mon. Of the Russian Federation No. 1761868, BI No. 34 from 15.09.92,, CL E 02 D 5/38).

The disadvantage of these methods and devices is their limited technological capabilities, i.e. the impossibility of creating in the soil solid chosen to replace the long-walling.

The closest technical solution of the present invention is a technique in which the soil using vibro sequentially dipped into the castle, and then vibrating remove inventory items with simultaneous filling of the cavity in the ground hardening material (Mechanization of construction, No. 9, 2000 Ore, Emily, Iwholename. Domestic high-performance vibratory pile driver to perform special operations in the ground. C. 2-5).

Closest to the invention is a device for the erection chosen to replace soil-bearing structures, including the vibration exciter and at least two hollow body, within each of which, with the possibility of longitudinal displacement posted by draught, connected in the bottom part with the Shoe and having stops. On the outer sides of the walls of each body is hard-coded guides and grooves, allowing the buildings to communicate with each other in both longitudinal and transverse planes. By consecutive vibraphone, fill with concrete mix and vibroisolating hollow to the of Busov, connected with guides and grooves in the ground form a continuous concrete wall of uniform rectilinear cross-section, embedded in the ground at a constant value (RF patent No. 2173373, BI No. 25 from 10.09.2001,, CL E 02 D 5/34).

The disadvantage of these methods and devices is their limited technological capabilities, i.e. creation in ground concrete wall whose cross section along the entire length has a small area, which reduces the ability of the wall to absorb torque from the forces of resistance of the soil when working wall as a retaining wall, as well as a negative influence in the operations of the dynamic impacts on nearby buildings and structures.

Task to be solved by the present invention is directed, is the expansion of technological capabilities and increase the efficiency of the method and of the device by increasing the resistance moment of the cross section of the wall and increase its ability to absorb torque from the forces of resistance of the soil, and the reduction of dynamic effects on the Foundation soil immersion elements.

The method of construction in the soil chosen to replace-walling includes sequential vibration immersion in the soil inventory items, mating among themselves, and their subsequent vibration retrieve the increase with simultaneous filling of the cavity in the ground with concrete. Use inventory items, made in the form of profiled elements longitudinal fence and profiled elements uprights having in the lower part of the sash closed when submerged in the ground and opened by means of flexible connections when removing elements from the soil and the supply of concrete mixture. Profiled elements longitudinal fences have a length less than the length of the profiled elements of the vertical posts, which when immersed press to a greater depth than the profiled elements of longitudinal barriers. First vibroport profiled longitudinal element of the fence, and then tightly match with him by sending shaped conductor element upright and carry out its vibrophone. After that load the concrete mix in the profiled longitudinal element of the fence and his vibroisolation with open shutters. The extracted element vibroport in the following position with adjunction to the previous in the soil profiled element vertical racks. Then load the concrete mix in the profiled element upright, his vibroisolation with open doors and vibroport the extracted item to the next position with the simultaneous docking with the previous profiled e is a COP longitudinal fence using the guide conductor. Next, repeat the immersion of items in inventory.

Device for the erection of soil chosen to replace-walling includes faucet or Koper with a vertical guideway, vibro and at least two inventory hollow element. Inventory items are made in the form of profiled elements longitudinal fence and profiled elements of the vertical posts, and a profiled longitudinal elements of the fence have a length less than the length of the profiled elements of the vertical posts, which are made of hollow rectangular sections rigidly interconnected by a continuous edge along the transverse axis across the height of the element. Vertical guide in the lower part is fitted with guide vanes conductor.

The device has a carriage mounted for movement along the vertical guide using polyspastny system and winch cable of a crane or copra.

The method of construction in the soil chosen to replace-walling and device for its implementation are illustrated by the drawings, where figure 1 shows a General view of the device; figure 2 is a transverse section of the constructed retaining wall; figure 3 is a section of the pit, attached erected a concrete wall in the role of a retaining wall; figure 4 is a longitudinal section of a profiled element continue the aqueous barriers; figure 5 - cross section a-a profiled longitudinal element fences; figure 6 is a longitudinal section of a profiled element of the vertical posts; figure 7 - cross section b-B of the profiled element vertical posts; Fig - pairing of several profiled elements in section; figure 9 - process vibration extract profiled longitudinal element of the fence with the simultaneous filling of ground cavities of the concrete mixture; figure 10 - vibrating indentation profiled longitudinal element of the fence; on 11 - vibration indentation profiled element vertical posts; Fig - vibration removing the profiled longitudinal element of the fence with the simultaneous pouring of the cavity in the substrate; on Fig - vibration indentation profiled longitudinal element of the fence in the next item.

The method of construction in the soil chosen to replace-walling consists in the following. On the hook polyspastny crane system 1 or copra hung the vibro-2, which is rigidly fastened to the movable carriage 3, located on the vertical guide rail 4. With the help of hydraulic capture profiled longitudinal element fences 5 fasten with vibro-2. Under the action of vibration and pressing the efforts of the profiles is consistent element longitudinal fence plunge into the ground to the design elevation through the guide conductor 6. After this profiled element vertical posts 7 match with the ground profiled longitudinal element fences 5 using the guide conductor 6 and repeat the immersion similar to the first, but at greater depth. Then a flexible connection 8 in the profiled element longitudinal fence 5 free, grabbed her by the upper hinge 9 and thereby provide an opportunity to open the door 10, a profiled longitudinal element of the fence from the top load of the concrete mix and begin with vibration to extract it from the soil. Under the action of gravity of the concrete mix is the opening of the valves 10 and 11, the concrete mixture flows from the element and fills formed by immersing the cavity in the ground. After extraction, the profiled longitudinal element fences 5 on its surface is immersed in the following position with simultaneous adjunction to the previous in the soil profiled element upright support 7 by means of the sending conductor 6. Then a flexible connection 12 profiled element vertical racks free and hook over the top of the loop 13 and produce a vibration removing the profiled element vertical posts with simultaneous pouring of the cavity in the ground. After extraction, the profiled element vertically in the front 7 on its surface is immersed in the following position with simultaneous docking with the previous in the soil profiled longitudinal element fences 5 using the guide conductor 6. Then the concrete structure reinforced by vibraphone vibrator low power in freshly placed concrete reinforcement cages or grids 14. Thus, in the ground form a continuous chosen to replace-enclosing concrete wall that can act as retaining walls, elements of which have different depth and increased in the zones of the cross-sectional area.

Device for erecting chosen to replace-walling includes a profiled longitudinal element fences 5 with flaps 10 and 11 in the lower part mounted on the transverse walls and abutting against the stops 15. The shutter 10 has a g-shaped and is connected to the upper part of the profiled longitudinal element of the fence by means of a flexible connection 8. The flexible link is a cable with two loops of 9 at the end. Profiled element vertical rack consists of a rectangular sections 16 are rigidly interconnected by a continuous edge 17 along the transverse axis across the height of the element. At the bottom of each rectangular profile on the transverse wall has two sash 18 and 19, rests on the lugs 20. The shutter 19 has a g-shaped and connected with the upper part of the hollow rectangular profile by means of a flexible connection 12 with two loops 13 on the end.

On the vertical guideline 4 of the valve 1 or copra in n the sung part is mounted the guide conductor 6, and in the upper part of the movable carriage 3, on which are fixed the cable 21, passing through the stationary block 22 mounted on a vertical guide rail 4, the winch of the crane 1 or copra.

The proposed method and device have the following advantages over the known solutions for similar purposes:

- reduced consumption of concrete and metal due to the fact that the required capacity of the retaining wall to perceive the force of resistance of the soil is provided by vertical posts that are sunk to a depth greater than the depth of the main longitudinal barriers;

- reduces the level of harmful dynamic impact on the surrounding buildings and structures due to the fact that when additional static loading profiled elements (indentation) dramatically decreases the elastic component of the oscillation of the array of the soil arising from vibration affecting them.

1. The method of construction in the soil chosen to replace-walling, including sequential vibration immersion in the soil inventory items, mating among themselves, and their subsequent vibratory extraction with simultaneous filling of the cavity in the ground with concrete, characterized in that use inventory items, made in the form of profiled elements continue the aqueous fencing and profiled elements of the uprights, having in the lower part of the sash closed when submerged in the ground and opened by means of flexible connections when removing elements from the soil and the supply of concrete mixture, with a profiled longitudinal elements of the fence have a length smaller than the length of the profiled elements of the vertical posts, which when immersed press to a greater depth than the profiled elements of the longitudinal rails, and initially vibroport profiled longitudinal element of the fence, and then tightly match with him by sending shaped conductor element upright and carry out its vibrophone, then load the concrete mix in the profiled longitudinal element of the fence with his vibroisolation with open doors and vibroport the extracted item to the next position by joining the previous in the soil profiled element vertical posts, and then load the concrete mix in the profiled element vertical rack when it vibroisolating with open doors and vibroport the extracted item to the next position with the simultaneous docking with the previous profiled longitudinal element of the fence using the guide conductor, then repeat the immersion inventory of elements stored is.

2. Device for the erection chosen to replace soil-bearing structures, including the crane or engine with vertical guide, vibro and at least two inventory hollow element, wherein the inventory items made in the form of profiled elements longitudinal fence and profiled elements of the vertical posts, and a profiled longitudinal elements of the fence have a length smaller than the length of the profiled elements of the vertical posts, which are made of hollow rectangular sections rigidly interconnected by a continuous edge along the transverse axis across the height of the element, and a vertical guide in the lower part is fitted with guide vanes conductor.

3. The device according to claim 2, characterized in that it is provided with a carriage mounted for movement along the vertical guide using polyspastny system and winch cable of a crane or copra.



 

Same patents:

FIELD: building structures, particularly shallow foundations.

SUBSTANCE: method involves creating well by ground excavation, introducing preparatory portion of hardening material in well hollow including calculated part of hardening material; arranging explosive charge in lower well part; securing explosive charge; blowing explosive charge up to create cavity for widened foundation post part; crushing and widening above calculated part after explosion; introducing additional portion of hardening concrete in well up to 4/5 of well height; filling it with calculated part of above material portion. Concrete for casting is used as preparatory hardening material.

EFFECT: reduced time, increased simplicity of foundation building and reliability.

2 cl, 5 dwg

The invention relates to the construction, namely, Foundation, and can be used during the construction of piled foundations in weak water-saturated clay soils in conditions of unfettered urban development

The invention relates to the field of construction in cramped conditions

The invention relates to the construction and installation of pile foundations mainly in ground subsidence of the second type, swelling and bulk soils

Pile // 2186905
The invention relates to the construction and can be used during the execution of pile foundations of buildings and structures

The invention relates to the construction and can be used for concreting of piles

The invention relates to industrial and civil construction and can be used in the construction in rocky soil pile foundations and deep foundations

The invention relates to the construction, in particular for pile foundations

FIELD: building structures, particularly shallow foundations.

SUBSTANCE: method involves creating well by ground excavation, introducing preparatory portion of hardening material in well hollow including calculated part of hardening material; arranging explosive charge in lower well part; securing explosive charge; blowing explosive charge up to create cavity for widened foundation post part; crushing and widening above calculated part after explosion; introducing additional portion of hardening concrete in well up to 4/5 of well height; filling it with calculated part of above material portion. Concrete for casting is used as preparatory hardening material.

EFFECT: reduced time, increased simplicity of foundation building and reliability.

2 cl, 5 dwg

FIELD: building, particularly pile foundation building.

SUBSTANCE: method involves drilling well; placing inventory casing pipe in well, wherein casing pipe has closed lower end and is provided with inventory electrical discharger; feeding concrete mixture in well and initiating high-voltage electrical discharges in well along with removing casing pipe and forming shaft. Well is formed by driving inventory casing pipe in ground; sealing casing pipe from top thereof and arranging check valves used for concrete mixture pouring, for supplying pressurized air and water, in upper pile part; forming channels for concrete mixture passage in casing pipe; providing above channels with self-opening valves. Electric discharger is fixedly connected to casing pipe so that discharger extends beyond lower part thereof and form lower casing pipe end closed when casing pipe is driven in ground. Inventory casing pipe is driven in ground and lower end thereof is deepened in support layer by pressing action combined with high-voltage electric discharge energy. Casing pipe is removed from ground and shaft forming is performed simultaneously with pulling static load application, feeding compressed air and initiating electrical discharges in concrete mixture.

EFFECT: increased load bearing capacity of cast-in-place pile.

6 dwg

The invention relates to the construction, in particular to a method of construction of pile foundations and foundations mainly in weak soils, and can be used in industrial and civil construction as the construction of new buildings and structures, and the strengthening of the foundations of old, damaged or requiring reconstruction

The invention relates to construction equipment and is intended for forming of piles, pile Foundation

The invention relates to tubular piles, enclosed in concrete

The invention relates to the field of construction, namely, devices for erection in the soil chosen to replace-walling low-rise residential buildings, preferably in sandy, loamy sand and plastic clay soils

The invention relates to methods and devices designed to improve the feasibility of short piles of aggregate

The invention relates to the construction, namely, Foundation, and can be used during the construction of piled foundations in weak water-saturated clay soils in conditions of unfettered urban development

The invention relates to the construction, and in particular to methods of device cementogenesis piles in weak, structurally unstable soils

The invention relates to the field of construction, in particular to a method of construction in soil printed designs

FIELD: building, particularly pile foundation building.

SUBSTANCE: method involves drilling well; placing inventory casing pipe in well, wherein casing pipe has closed lower end and is provided with inventory electrical discharger; feeding concrete mixture in well and initiating high-voltage electrical discharges in well along with removing casing pipe and forming shaft. Well is formed by driving inventory casing pipe in ground; sealing casing pipe from top thereof and arranging check valves used for concrete mixture pouring, for supplying pressurized air and water, in upper pile part; forming channels for concrete mixture passage in casing pipe; providing above channels with self-opening valves. Electric discharger is fixedly connected to casing pipe so that discharger extends beyond lower part thereof and form lower casing pipe end closed when casing pipe is driven in ground. Inventory casing pipe is driven in ground and lower end thereof is deepened in support layer by pressing action combined with high-voltage electric discharge energy. Casing pipe is removed from ground and shaft forming is performed simultaneously with pulling static load application, feeding compressed air and initiating electrical discharges in concrete mixture.

EFFECT: increased load bearing capacity of cast-in-place pile.

6 dwg