Device for the manufacture of printed piles and printed pile

 

The invention relates to the field of construction, and in particular to equipment for construction of piles in the soil to increase its load carrying capacity in the place of construction of various buildings and structures, as well as means of improving bearing capacity and strengthen the soil, for example, during the construction of foundations or in soil of different kind of fortification works. Device for the manufacture of printed pile contains steel casing pipe with mounted in the upper part of the device for mounting and vibro Shoe at the bottom. What's new is that the anchorage of the vibro made in the form of a reinforcing ring mounted around the upper part of the tube and attached thereto by welding, connected with casing pipe and below the reinforcing ring, a reinforcing plate having a plan axisymmetric shape, preferably diamond or circle, whose plane is perpendicular to the longitudinal axis of the casing and the ribs in the form of, for example, trapezoidal plates connecting the reinforcing ring and the reinforcing plate, and symmetrically relative to the longitudinal axis of the pipe, and the Shoe is made to lose in the form of a plate boletini lose a Shoe attached guide ring, inner diameter which exceeds the outer diameter of the casing, at least to the extent of thickness placed between them during installation of the casing strip of elastic material, preferably rubber, or outer diameter which is less than the internal diameter of the casing by the same amount. Printed pile, made using the device contains concrete or reinforced concrete body, supported on a guide ring lose a Shoe through a lining of elastic material, preferably rubber, or at least through a part of it. The technical result provided by the two objects is to improve the quality of constructed ramming piles and its bearing capacity due to the optimization process of the formation of a soil core under a lost Shoe, as well as reducing the complexity of the process of concreting piles. 2 ad and 3 C.p. f-crystals, 2 Il.

The invention relates to the field of construction, and in particular to equipment for construction of piles in the soil to increase its load carrying capacity in the place of construction of various buildings and structures, as well as means of improving bearing capacity and strengthen the soil, for example, in prazole closest to the technical essence is a device for the manufacture of printed piles, containing casing pipe buried in the ground with the help of a vibration exciter mounted on its upper end with a support, and overlying the cavity of the casing losing a Shoe on its lower end (SU 1761868 A1, E 02 D 5/38, 15.09.1992).

Also known construction ramming piles, made in the form placed in the array of ground extended, preferably vertically oriented, concrete or reinforced concrete body, the bottom of which rests through the Shoe on compacted in his vibraphone soil layer and, preferably, has a widening (SU 1761868 A1, E 02 D 5/38, 15.09.1992).

Known construction, using the method of vibraphone casing with subsequent supply in her concrete mixture and removing the casing, does not exclude the possibility of a reduction in the strength characteristics under construction ramming piles due to leaking joints in the process of immersion lose a Shoe and casing, which may lead to the leakage of groundwater into the cavity of the casing and to the inevitability of concrete piles through its displacement, which will adversely affect the quality of the piles. In addition, the process of creating a core of compacted soil moved during vibraphone area of the working surface of the Shoe and does not take into account possible changes of category, the moisture content and density of soil, which can lead to a decrease in the size of the nucleus or in the end - to puncture a kernel Shoe.

The objective of the present invention is to improve the quality built ramming piles, increase its carrying capacity by optimizing the process of formation of the soil cores under a lost Shoe, as well as reducing the complexity of the process of concreting piles.

This is achieved by the fact that:

device for the manufacture of printed pile contains steel casing pipe with mounted in the upper part of the device for mounting and vibro Shoe at the bottom, according to the invention a device for mounting vibro made in the form of a reinforcing ring, covering the upper part of the pipe, and attached to it by welding, connected with casing pipe, and below the reinforcing ring, a reinforcing plate having a plan axisymmetric shape, preferably diamond or circle, whose plane is perpendicular to the longitudinal axis of the casing and the ribs in the form of, for example, trapezoidal plates, connecting the reinforcing ring and the reinforcing plate and symmetrically relative to the longitudinal axis of the pipe, and the Shoe is made which would and to the top plate loose Shoe attached guide ring inner diameter which exceeds the outer diameter of the casing, at least to the extent of thickness placed between them during installation of the casing strip of elastic material, preferably rubber, or outer diameter which is less than the internal diameter of the casing by the same amount. In addition, the gasket may be made with a minimum linear length or width of her facing the pipe surface, not less, respectively, the sum of internal or external diameter of the guide ring of the Shoe, and twice the height of its walls. The gasket is placed between the casing pipe and the walls of the guide ring with the formation of the protruding beyond the contour of the ring its edges;

drilled pile is made using the above-described device and its concrete or reinforced concrete body is supported on a guide ring lose a Shoe through a lining of elastic material, preferably rubber or at least through a part of it. When the gasket may cover at least part of the perimeter of the lower part of the body pile height not lower the height of the walls napravlyayus quality built ramming piles and its bearing capacity due to the optimization process of the formation of a soil core under a lost Shoe, as well as reducing the complexity of the process of concreting piles.

The invention illustrated by the drawings, where Fig.1 presents a General view of an apparatus for manufacturing printed piles of Fig.2 is a view along a-a in Fig.1.

Device for the manufacture of printed pile contains steel casing pipe 1 with mounted in the upper part of the device for mounting the vibratory pile driver (not shown). Device for mounting vibro made in the form of a reinforcing ring 2, covering the upper part of the pipe 1 and is attached thereto, for example, by welding, and is connected to the casing tube 1 and below the reinforcing ring reinforcing plate 3. Plate 3 has in terms of an axisymmetric shape, preferably diamond or circle, and the plane perpendicular to the longitudinal axis of the casing 1. Device for mounting vibro made with ribs 4 in the form of plates, for example trapezoidal connecting the reinforcing ring 2 and the reinforcing plate 3. The ribs 4 are symmetrically located relative to the longitudinal axis of the pipe 1. The lower part of the casing is equipped with a lost Shoe, made in the form of a plate 5 greater area than the area of the outer circumference of the casing 1, and it increases the outer diameter of the casing 1, at least on the value of thickness is placed between them during installation of the casing pipe 1 gasket 7 of elastic material. The gasket 7 is made, preferably, of rubber, for example, microporous. The outer diameter is 6 less than the internal diameter of the casing 1 by the amount of the thickness placed between them during installation of the casing pipe 1 gasket 7. In addition, the spacer 7 may be performed with the minimum line size - the length or width of her facing the pipe surface, not less, respectively, the sum of internal or external diameter of the guide ring 6 of the Shoe, and twice the height of its walls. The strip 7 may be made of any shape and placed between the casing pipe and the walls of the guide ring with the formation of the protruding beyond the contour of the ring its edges. Printed pile (not shown) is performed using the above-described device and its concrete or reinforced concrete, at least part of its length, the body is supported through a lining 7 of elastic material, preferably rubber, for example, microporous, or at least through part of it, to lose a Shoe. When the gasket 7 may cover the lower part of the body of the pile, at least on part of its lane is aetsa as follows.

The vibro together with the basic machine with a guide for him the mast is installed on the place of education ramming piles. Steel pipe 1 is moved from a horizontal to an upright position above the established ground losing a Shoe at a distance of approximately 0.5 m On napravlyayus ring 6 lose a Shoe placed the gasket 7 and the lower pipe 1 with the formation of a dense waterproof connection. To the upper part of the tube 1 at the location of the ribs 4 attach the vibration exciter. During the operation of the vibration exciter is created aimed disturbing power, through which and by using a counterweight mounted on the guide base of the machine carriage carry out the immersion of the casing pushing lose a Shoe. The diameter of the lost Shoe exceeds the diameter of the casing, which removed the side friction of the pipe 1 on the ground. Under the Shoe in the immersion process formed the core of compacted soil under optimum conditions of the dip pipe 1 is moved together with the Shoe in the depth of unconsolidated array. Because of the different properties of soil, the depth of the array, including humidity, the efficiency of compaction conventional Shoe is reduced, the Odile shocking pulses, transmitted by the vibration exciter on the pipe 1, is transmitted to the Shoe with a certain time delay, which allows to increase the pulse duration and changing the rheological properties of the soil to ensure its effective seal. In addition, the gasket 7 prevents the cavity filling pipe 1 ground water, resulting in concreting piles carry out concrete mixture of controlled composition. Before concreting process or during it in the cavity of the pipe 1 is installed, if necessary, the valve piles. In the process of concreting the casing removed for reuse. The pile is thus in the form of a concrete body, installed on losing the Shoe through the elastic strip, while the Shoe is located on compacted soil core, the diameter of which in cross-section is about three diameters of the plate 5 of the Shoe.

The proposed technical solutions allow to increase the pace of work in flooded or saturated soils while complying with the required quality of the piles.

Claims

1. Device for the manufacture of printed piles containing steel casing pipe with mounted in the upper part of prisposoblenija of vibro made in the form of a reinforcing ring, covering the upper part of the pipe and attached thereto by welding, connected with casing pipe and below the reinforcing ring, a reinforcing plate having a plan axisymmetric shape, preferably diamond or circle, whose plane is perpendicular to the longitudinal axis of the casing and the ribs in the form of, for example, trapezoidal plates connecting the reinforcing ring and the reinforcing plate and symmetrically relative to the longitudinal axis of the pipe, and the Shoe is made loose, in the form of a plate of greater area than the area bounded by the outer circumference of the casing, and the upper part of the plate loose Shoe attached guide ring, inner diameter which exceeds the outer diameter of the casing, at least to the extent of thickness placed between them during installation of the casing strip of elastic material, preferably rubber, or outer diameter which is less than the internal diameter of the casing by the same amount.

2. Device for the manufacture of printed piles under item 1, in which the seal is made with a minimum linear length or width of her facing the pipe surface, not less relevant. the device for manufacturing printed piles under item 1, in which the gasket is placed between the casing pipe and the walls of the guide ring with the formation of the protruding beyond the contour of the ring its edges.

4. Printed pile, made using a device according to any one of paragraphs.1-3, in which concrete or reinforced concrete body is supported on a guide ring lose a Shoe through a lining of elastic material, preferably rubber or at least through a part of it.

5. Printed pile on p. 4, characterized in that the strip covers at least part of the perimeter of the lower part of the body pile height not lower the height of the walls of the guide ring lost Shoe.

 

Same patents:

The invention relates to the construction, namely, Foundation, and can be used during the construction of piled foundations in weak water-saturated clay soils in conditions of unfettered urban development

The invention relates to the field of construction in cramped conditions

The invention relates to the construction and installation of pile foundations mainly in ground subsidence of the second type, swelling and bulk soils

Pile // 2186905
The invention relates to the construction and can be used during the execution of pile foundations of buildings and structures

The invention relates to the construction and can be used for concreting of piles

The invention relates to industrial and civil construction and can be used in the construction in rocky soil pile foundations and deep foundations

The invention relates to the construction, in particular for pile foundations

The invention relates to the construction, namely, Foundation, and can be used in the device of piles, including in areas of shallow soils with aggressive properties

The invention relates to the construction, and in particular to methods of construction of piles in soils with different engineering-geological conditions

FIELD: building structures, particularly shallow foundations.

SUBSTANCE: method involves creating well by ground excavation, introducing preparatory portion of hardening material in well hollow including calculated part of hardening material; arranging explosive charge in lower well part; securing explosive charge; blowing explosive charge up to create cavity for widened foundation post part; crushing and widening above calculated part after explosion; introducing additional portion of hardening concrete in well up to 4/5 of well height; filling it with calculated part of above material portion. Concrete for casting is used as preparatory hardening material.

EFFECT: reduced time, increased simplicity of foundation building and reliability.

2 cl, 5 dwg

FIELD: building and construction.

SUBSTANCE: method includes serial vibration immersion of inventory elements into soil, which are mated between each other, and their following vibration extraction with concurrent filling of hollow in soil with concrete mixture. Inventory elements are used, which are made in form of profiled posts, having gates in lower portion, closed during immersion in soil and opened by flexible links during extraction of elements from soil and feeding of concrete mixture. At the same time profiled elements of longitudinal walling have lesser length, than length of profiled elements of vertical posts, which during immersion are pressed in for greater depth than profiled elements of longitudinal walling. First, profiled element of longitudinal walling is immersed, and then via guiding conductor profiled element of vertical post is densely mated to it and is than immersed. Concrete mixture is loaded in profiled element of longitudinal walling with its extraction with open gates and extracted element is immersed in next position adjacently to previous profiled element of vertical post being in soil. Concrete mixture is loaded into profiled element of vertical post during its extraction with open gates and extracted element if immersed into following position with concurrent mating to previous profiled element of longitudinal walling with use of guiding conductor. Then inventory elements are immersed again. Device for construction of bearing-limiting structures in soil includes crane or pile driver with vertical guide, vibration immersion driver and at least two inventory hollow elements. Inventory elements are made in form of profiled elements of longitudinal walling and profiled elements of vertical posts. Profiled elements of longitudinal walling have length less than length of profiled elements of vertical posts, which are made of hollow rectangular profiles, rigidly interconnected by solid rib along transverse axis along whole height of element, while vertical guide in lower portion is provided with guiding conductor.

EFFECT: higher efficiency, broader functional capabilities.

2 cl, 13 dwg

FIELD: building, particularly cast-in-place building units, namely support structures.

SUBSTANCE: reinforced concrete column is formed in retained formwork and consists of upper support part and lower foundation part. Column includes reinforcement frame grouted with concrete mix and embedded members arranged in upper column part. Upper part of frame is located in retained formwork. Embedded members are in level with foundation slab marks and with flooring panel marks. Embedded members are formed as closed contours with stiffening ribs. Column is built in single- or multi-slot hollow. Projection of geometric retained formwork cross-section center coincides with that of lower reinforcement frame part. Arms of lower reinforcement form part extending in Y-axis direction are sized in accordance with given mathematical relation. Method of column erection involves forming single- or multi-slot hollow; producing reinforcement form with embedded members; forming retained formwork; installing above components; vertically placing the reinforcement frame in hollow so that frame is spaced a distance from hollow bottom; vertically adjusting and fixing upper column part to prevent transversal displacement thereof; grouting lower column part in bottom-top direction; grouting inner retained formwork area of upper column part. Hollow has dimensions measured in Y-axis direction determined from given relation.

EFFECT: possibility of simultaneous building erection in upward and downward directions relative ground level.

7 cl, 13 dwg

FIELD: building, particularly for erecting support structures, namely pile foundations, injection anchors, walls in ground, cast-in-place reinforced earth constructions and other geotechnic structures used for new building erection or reconstruction of existent buildings.

SUBSTANCE: method involves forming well or trench section in ground; at least partly filling thereof with hardening material or drilling agent, for instance with cement-bentonite one; substituting thereof with hardening material; immersing reinforcing cage with outer flexible shell connected to at least part of cage length in well. The flexible shell is permeable for liquid fraction of the hardening material and provides waterproofing of the cage after setting of above material and hardening material located outside the shell. Shell parameters are determined from the given correlations.

EFFECT: increased load-bearing capacity, reliability and service life, extended field of application.

24 cl, 9 dwg

FIELD: building, particularly foundation building, namely for erecting pile foundations in seasonally freezing ground.

SUBSTANCE: method involves forming well extending for the full thickness of seasonally freezing ground layer, wherein well diameter increases pile diameter; installing heater in the well; transferring heat; driving casing pipe with detachable tip in ground through heater cavity; concreting well bore along with simultaneous lifting casing pipe and removing heater. Heat is supplied to concrete mixture within the limits of seasonally freezing ground after casing pipe removal. Inductor made as copper wire coil covered with heat-protective layer and located outside metal pipe is used as the heater. Heating is performed within 10-12 hours along with maintaining 75-80°C temperature of concrete mix by regulating inductor power up to obtaining concrete strength equal to 80% of design strength. After inductor removal from the well gap formed between well wall and pile body is filled with non-heaving ground.

EFFECT: reduced power inputs along with maintaining high productivity and increased load-bearing pile capacity.

2 cl, 3 dwg

FIELD: building, particularly pile foundation erection.

SUBSTANCE: method involves drilling hole; installing injection pipe in the hole bottom center; installing reinforcement case; injecting cement-and-sand grout through the injection pipe below lower pile end for ground compaction and widened part arrangement; concreting the pile. To create widened part of the pile and to compact ground after concrete hardening cement-and-sand grout is fed under pressure into sealed bag formed of elastic water impermeable material and connected to lower end of ejection pipe so that cement-and-sand grout expands the bag up to reaching necessary bag volume.

EFFECT: increased economy of pile forming, increased ability of clay ground compaction at pile base.

4 dwg, 1 ex

Pile // 2263746

FIELD: foundation building.

SUBSTANCE: pile has body made as shell filled with concrete and formed as members having trough-shaped cross-sections and extending in longitudinal direction. Members have side walls abutting the central wall and extending at obtuse angles from it. The shell has frame. Central walls of frame members are of ellipsoid shape and filled with concrete.

EFFECT: increased load-bearing capacity and reliability.

5 dwg

FIELD: building, particularly to erect cast-in-place pile having large diameter in collapsible ground layer of large thickness.

SUBSTANCE: method involves drilling pilot hole; installing casing pipe connected to puncher; punching the well ground by dropping load on the puncher through casing pipe to reach design point and enlarging the casing pipe; arranging reinforcement case in the pipe; filling the well with concrete mix as casing pipe moves upward; compacting the concrete mix. In the case of pile with 300-1500 mm diameter forming and in the case of collapsible ground layer thickness up to 18 m or 18-50 m ratio between pilot hole depth and collapsible ground thickness is 1:(4.5-6) and 1:(1.5-5). The puncher has reinforced concrete tip and head made of tube with outer diameter equal to inner diameter of pilot hole. Welded to the head are centering rings. The tip has ring to engage thereof with technological control rod provided with thread, washer with retainers and nut on opposite end thereof. Ratio of height H of upper head part provided with centering rings to length of casing pipe to be installed in the head is 1:(20-30). Ratio between outer puncher diameter D and outer diameter d at tapered part ℓ thereof is equal to 1:0.8. Length ratio between cylindrical head part L and cylindrical tapered part ℓ is equal to 1:0.6. Angles γ of head and head transition area leading to tapered part ℓ are equal to 30°. Difference between outer puncher diameter D to outer casing pipe T diameter is 90-100 mm.

EFFECT: reduced labor inputs and decreased material consumption.

2 dwg

FIELD: building, particularly to create bored piles in cased wells during building and building structure foundation erection.

SUBSTANCE: method involves heating ground surrounding place of pile erection and heating concrete mix with induction heater. The concrete mix is vibratory treated in pulsed mode at the beginning of heating operation by applying electromagnetic field generated by induction heater to metal reinforcement bars, wherein high-frequency current of induction heater is subjected to low-frequency modulation. At concrete mix setting beginning the pulsed mode is changed into high-voltage one. Device for above method realization comprises induction heater comprising steel pipe put on asbestos-cement pile casing pipe and winding made of copper coiled bus linked with high-frequency power source. The winding is connected to metal pipe. Diametrical longitudinal orifices are made in the steel pipe. The power source comprises circuit providing high-frequency current modulation with low frequency.

EFFECT: possibility of simultaneous heat and vibration application to concrete mix, reduced cost of the device along with reduced number of working tools, simplified control, provision of concrete shrinkage and compaction under heating, which is performed by single device.

2 cl, 4 dwg

FIELD: building, particularly foundation and retaining wall erection with the use of injection piles.

SUBSTANCE: injection pile comprises concrete shaft formed directly in well and comprising reinforcing cage made as metal injection pipe lowered in well to refusal and spaced from well wall. The injection pipe is provided with lower perforated section having side injection orifices arranged in several layers beginning from lower injection pipe end. Well diameter is not more than 3d, where d is outer injection pipe diameter. Perforated section length is more than 3d, but less than L and is equal to (0.2-0.7)L, where L is well depth. Retaining wall is built on pile foundation comprising injection piles. The retaining wall includes reinforcing cage made as metal pipe having upper part used as head. The retaining wall is composed of concrete blocks laid in several rows one upon another. Blocks of lower row form retaining wall base. At least upper block installed on lower one has through orifice, which is vertically aligned with mounting orifice formed in lower block. Common cavity defined by above orifices is reinforced and concreted.

EFFECT: simplified structure, reduced cost of pile foundation and retaining wall construction.

21 cl, 3 ex, 3 dwg