Device for the formation of bored piles

 

(57) Abstract:

The invention relates to industrial and civil construction and can be used in the construction in rocky soil pile foundations and deep foundations. The invention consists in that the device for the formation of bored piles, including suspended to the base car guide with mounted therein an electric motor connected to the drilling tool rotary, electric motor associated with a drilling tool, made in the form located on its Central axis of the bit, through the Central shaft of the gearbox, which is kinematically connected to the peripheral walls, at least part of which is fixed additional drilling tools in the form of peripheral bits, and the gearbox is mounted the mechanism of rotation of its body fixed relative to the housing of the motor of the Central toothed wheel, connected to slave peripheral gears shafts and located underneath the Central pinion, which is connected via parasitic gear with a driven gear fixed on the peripheral shafts mounted in the bearings of the cor is th bit is not less than 0.05 radius of rotation of the Central bit and installed with adjustable depending on the category of a ground offset value relative to his height. In this case, the housing may be made cylindrical prismatic go with a vertical through-channels, isolated from the body cavity of the gears. The device extends the technological capabilities and provides increased pace of work on the education of bored piles. 1 C. p. F.-ly, 2 Il.

The invention relates to industrial and civil construction and can be widely used in construction in rocky soil pile foundations and deep foundations.

The closest known is a device for the formation of bored piles, including suspended to the base car guide with mounted therein an electric motor connected to the drilling tool rotational steps (see ed.St. USSR N 1350253, CL E 02 D 5/38, 1985).

The known device has low productivity due to the adopted process, inherent in its design.

The objective of the invention is to increase productivity by reducing process downtime.

This is achieved by the fact that the device for the formation of bored piles, including suspended to the base machine voltage, the electric motor is connected with the drilling tool, made in the form located on its Central axis of the bit, through the Central shaft of the gearbox, which is kinematically connected to the peripheral walls, at least part of which is fixed additional drilling tools in the form of peripheral bits, and the gearbox is mounted the mechanism of rotation of its body fixed relative to the housing of the motor of the Central toothed wheel connected with the slave peripheral gears shafts and located underneath the Central pinion, which is connected via parasitic gear with a driven gear fixed on the peripheral shafts mounted in the bearings of the gear case, moreover, the peripheral bit installed with an overlap in terms of the circle of rotation of the Central bit is not less than 0.05 radius of rotation of the Central drill bit with adjustable depending on the category of a ground offset relative to his height. When the housing is cylindrical or prismatic with a vertical through-channels, isolated from the cavity of the housing.

In Fig. 1 shows a General view of the device the Finance bored piles is a suspension unit and contains suspended to the base car guide 1 with mounted therein an electric motor 2, connected to the drilling tool rotational steps. The electric motor 2 is connected with the drilling tool, made in the form located on its Central axis bit 3, through the Central shaft 4 of the gear 5, which is kinematically connected to the peripheral shafts 6, at least part of which is fixed additional drilling tools in the form of peripheral bits 7. The gear 5 is mounted the mechanism of rotation of its body fixed relative to the housing of the electric motor 2 of the Central toothed wheel 8 connected with the driven gears 9 peripheral shafts and located underneath the Central pinion 10, which is connected via parasitic gear 11 with the driven gear 12, fixed on the peripheral shaft 13 mounted in bearings of the housing 5. Peripheral bit 7 installed with an overlap in terms of the circle of rotation of the Central bit 3 is not less than 0.05 radius of rotation of the Central bit 3, with adjustable depending on the category of a ground offset value relative to his height. When the housing 5 is made of a cylindrical or prismatic with a vertical through-channels 16 isolated from the cavity of the spring Assembly established the basic machine in position for the formation of wells under the bored pile. Mounted on the guide motor 2 transmits drilling tools such as drill bits 3 and 7 rotational motion. The rotation is transmitted to the bit 3 through the Central shaft 4 of the gear 5, which is kinematically connected with the peripheral rollers 6. The housing 5 is driven by a motor 2, the transmitting torque of the Central toothed wheel 8 connected with the driven gears 9 peripheral shafts. Thus, the peripheral bit 7 set with overlap in terms of the circle of rotation of the Central bit 3 is not less than 0.05 radius of rotation of the Central bit 3, simultaneously perform both rotational movement about their axes in the direction of rotation of the bit 3 and the rotational movement about the axis of the bit 3. The possibility of regulation, depending on the type of soil the amount of relative displacement of bits 3 and 7 in height provides optimum performance conditions. This also contributes to the implementation of rotating in the direction of rotation of the bits of the housing 5 of a cylindrical or prismatic with a vertical through-channels 14, isolated from the cavity of the housing. The issue developed breed is the

Thus, the proposed embodiment of the device greatly enhances its technological capabilities and provides increased pace of work on the education of bored piles.

1. Device for the formation of bored piles, including suspended to the base car guide with mounted therein an electric motor connected to the drilling tool rotational steps, characterized in that the electric motor is connected with the drilling tool, made in the form located on its Central axis of the bit, through the Central shaft of the gearbox, which is kinematically connected to the peripheral walls, at least part of which is fixed additional drilling tools in the form of peripheral bits, and the gearbox is mounted a rotation mechanism with stationary relative to the housing of the motor of the Central toothed wheel connected with the slave peripheral gears shafts, located underneath the Central pinion, which is connected via parasitic gear with a driven gear fixed on the peripheral shafts mounted in the bearings of the gear case, and peripheral bit installed with an overlap in terms of HN with the possibility of regulation depending on the category of a ground offset value relative to his height.

2. The device under item 1, characterized in that the housing is cylindrical or prismatic with a vertical through-channels, isolated from the cavity of the housing.

 

Same patents:

The invention relates to the construction, in particular for pile foundations

The invention relates to the construction, namely, Foundation, and can be used in the device of piles, including in areas of shallow soils with aggressive properties

The invention relates to the construction, and in particular to methods of construction of piles in soils with different engineering-geological conditions

The invention relates to the field of construction and can be used in the manufacture of concrete and reinforced concrete structures

The invention relates to the field of construction and can be used for the construction of foundations of piles of

The invention relates to the construction, in particular to devices for sealing construction materials mainly in the construction of piles

The invention relates to the construction, and in particular to methods of construction of piles of shells, arranged in loose soils with humidity, non-optimal

FIELD: building structures, particularly shallow foundations.

SUBSTANCE: method involves creating well by ground excavation, introducing preparatory portion of hardening material in well hollow including calculated part of hardening material; arranging explosive charge in lower well part; securing explosive charge; blowing explosive charge up to create cavity for widened foundation post part; crushing and widening above calculated part after explosion; introducing additional portion of hardening concrete in well up to 4/5 of well height; filling it with calculated part of above material portion. Concrete for casting is used as preparatory hardening material.

EFFECT: reduced time, increased simplicity of foundation building and reliability.

2 cl, 5 dwg

FIELD: building and construction.

SUBSTANCE: method includes serial vibration immersion of inventory elements into soil, which are mated between each other, and their following vibration extraction with concurrent filling of hollow in soil with concrete mixture. Inventory elements are used, which are made in form of profiled posts, having gates in lower portion, closed during immersion in soil and opened by flexible links during extraction of elements from soil and feeding of concrete mixture. At the same time profiled elements of longitudinal walling have lesser length, than length of profiled elements of vertical posts, which during immersion are pressed in for greater depth than profiled elements of longitudinal walling. First, profiled element of longitudinal walling is immersed, and then via guiding conductor profiled element of vertical post is densely mated to it and is than immersed. Concrete mixture is loaded in profiled element of longitudinal walling with its extraction with open gates and extracted element is immersed in next position adjacently to previous profiled element of vertical post being in soil. Concrete mixture is loaded into profiled element of vertical post during its extraction with open gates and extracted element if immersed into following position with concurrent mating to previous profiled element of longitudinal walling with use of guiding conductor. Then inventory elements are immersed again. Device for construction of bearing-limiting structures in soil includes crane or pile driver with vertical guide, vibration immersion driver and at least two inventory hollow elements. Inventory elements are made in form of profiled elements of longitudinal walling and profiled elements of vertical posts. Profiled elements of longitudinal walling have length less than length of profiled elements of vertical posts, which are made of hollow rectangular profiles, rigidly interconnected by solid rib along transverse axis along whole height of element, while vertical guide in lower portion is provided with guiding conductor.

EFFECT: higher efficiency, broader functional capabilities.

2 cl, 13 dwg

FIELD: building, particularly cast-in-place building units, namely support structures.

SUBSTANCE: reinforced concrete column is formed in retained formwork and consists of upper support part and lower foundation part. Column includes reinforcement frame grouted with concrete mix and embedded members arranged in upper column part. Upper part of frame is located in retained formwork. Embedded members are in level with foundation slab marks and with flooring panel marks. Embedded members are formed as closed contours with stiffening ribs. Column is built in single- or multi-slot hollow. Projection of geometric retained formwork cross-section center coincides with that of lower reinforcement frame part. Arms of lower reinforcement form part extending in Y-axis direction are sized in accordance with given mathematical relation. Method of column erection involves forming single- or multi-slot hollow; producing reinforcement form with embedded members; forming retained formwork; installing above components; vertically placing the reinforcement frame in hollow so that frame is spaced a distance from hollow bottom; vertically adjusting and fixing upper column part to prevent transversal displacement thereof; grouting lower column part in bottom-top direction; grouting inner retained formwork area of upper column part. Hollow has dimensions measured in Y-axis direction determined from given relation.

EFFECT: possibility of simultaneous building erection in upward and downward directions relative ground level.

7 cl, 13 dwg

FIELD: building, particularly for erecting support structures, namely pile foundations, injection anchors, walls in ground, cast-in-place reinforced earth constructions and other geotechnic structures used for new building erection or reconstruction of existent buildings.

SUBSTANCE: method involves forming well or trench section in ground; at least partly filling thereof with hardening material or drilling agent, for instance with cement-bentonite one; substituting thereof with hardening material; immersing reinforcing cage with outer flexible shell connected to at least part of cage length in well. The flexible shell is permeable for liquid fraction of the hardening material and provides waterproofing of the cage after setting of above material and hardening material located outside the shell. Shell parameters are determined from the given correlations.

EFFECT: increased load-bearing capacity, reliability and service life, extended field of application.

24 cl, 9 dwg

FIELD: building, particularly foundation building, namely for erecting pile foundations in seasonally freezing ground.

SUBSTANCE: method involves forming well extending for the full thickness of seasonally freezing ground layer, wherein well diameter increases pile diameter; installing heater in the well; transferring heat; driving casing pipe with detachable tip in ground through heater cavity; concreting well bore along with simultaneous lifting casing pipe and removing heater. Heat is supplied to concrete mixture within the limits of seasonally freezing ground after casing pipe removal. Inductor made as copper wire coil covered with heat-protective layer and located outside metal pipe is used as the heater. Heating is performed within 10-12 hours along with maintaining 75-80°C temperature of concrete mix by regulating inductor power up to obtaining concrete strength equal to 80% of design strength. After inductor removal from the well gap formed between well wall and pile body is filled with non-heaving ground.

EFFECT: reduced power inputs along with maintaining high productivity and increased load-bearing pile capacity.

2 cl, 3 dwg

FIELD: building, particularly pile foundation erection.

SUBSTANCE: method involves drilling hole; installing injection pipe in the hole bottom center; installing reinforcement case; injecting cement-and-sand grout through the injection pipe below lower pile end for ground compaction and widened part arrangement; concreting the pile. To create widened part of the pile and to compact ground after concrete hardening cement-and-sand grout is fed under pressure into sealed bag formed of elastic water impermeable material and connected to lower end of ejection pipe so that cement-and-sand grout expands the bag up to reaching necessary bag volume.

EFFECT: increased economy of pile forming, increased ability of clay ground compaction at pile base.

4 dwg, 1 ex

Pile // 2263746

FIELD: foundation building.

SUBSTANCE: pile has body made as shell filled with concrete and formed as members having trough-shaped cross-sections and extending in longitudinal direction. Members have side walls abutting the central wall and extending at obtuse angles from it. The shell has frame. Central walls of frame members are of ellipsoid shape and filled with concrete.

EFFECT: increased load-bearing capacity and reliability.

5 dwg

FIELD: building, particularly to erect cast-in-place pile having large diameter in collapsible ground layer of large thickness.

SUBSTANCE: method involves drilling pilot hole; installing casing pipe connected to puncher; punching the well ground by dropping load on the puncher through casing pipe to reach design point and enlarging the casing pipe; arranging reinforcement case in the pipe; filling the well with concrete mix as casing pipe moves upward; compacting the concrete mix. In the case of pile with 300-1500 mm diameter forming and in the case of collapsible ground layer thickness up to 18 m or 18-50 m ratio between pilot hole depth and collapsible ground thickness is 1:(4.5-6) and 1:(1.5-5). The puncher has reinforced concrete tip and head made of tube with outer diameter equal to inner diameter of pilot hole. Welded to the head are centering rings. The tip has ring to engage thereof with technological control rod provided with thread, washer with retainers and nut on opposite end thereof. Ratio of height H of upper head part provided with centering rings to length of casing pipe to be installed in the head is 1:(20-30). Ratio between outer puncher diameter D and outer diameter d at tapered part ℓ thereof is equal to 1:0.8. Length ratio between cylindrical head part L and cylindrical tapered part ℓ is equal to 1:0.6. Angles γ of head and head transition area leading to tapered part ℓ are equal to 30°. Difference between outer puncher diameter D to outer casing pipe T diameter is 90-100 mm.

EFFECT: reduced labor inputs and decreased material consumption.

2 dwg

FIELD: building, particularly to create bored piles in cased wells during building and building structure foundation erection.

SUBSTANCE: method involves heating ground surrounding place of pile erection and heating concrete mix with induction heater. The concrete mix is vibratory treated in pulsed mode at the beginning of heating operation by applying electromagnetic field generated by induction heater to metal reinforcement bars, wherein high-frequency current of induction heater is subjected to low-frequency modulation. At concrete mix setting beginning the pulsed mode is changed into high-voltage one. Device for above method realization comprises induction heater comprising steel pipe put on asbestos-cement pile casing pipe and winding made of copper coiled bus linked with high-frequency power source. The winding is connected to metal pipe. Diametrical longitudinal orifices are made in the steel pipe. The power source comprises circuit providing high-frequency current modulation with low frequency.

EFFECT: possibility of simultaneous heat and vibration application to concrete mix, reduced cost of the device along with reduced number of working tools, simplified control, provision of concrete shrinkage and compaction under heating, which is performed by single device.

2 cl, 4 dwg

FIELD: building, particularly foundation and retaining wall erection with the use of injection piles.

SUBSTANCE: injection pile comprises concrete shaft formed directly in well and comprising reinforcing cage made as metal injection pipe lowered in well to refusal and spaced from well wall. The injection pipe is provided with lower perforated section having side injection orifices arranged in several layers beginning from lower injection pipe end. Well diameter is not more than 3d, where d is outer injection pipe diameter. Perforated section length is more than 3d, but less than L and is equal to (0.2-0.7)L, where L is well depth. Retaining wall is built on pile foundation comprising injection piles. The retaining wall includes reinforcing cage made as metal pipe having upper part used as head. The retaining wall is composed of concrete blocks laid in several rows one upon another. Blocks of lower row form retaining wall base. At least upper block installed on lower one has through orifice, which is vertically aligned with mounting orifice formed in lower block. Common cavity defined by above orifices is reinforced and concreted.

EFFECT: simplified structure, reduced cost of pile foundation and retaining wall construction.

21 cl, 3 ex, 3 dwg