Fixed constructions (E)

E            Fixed constructions(157762)

Determination method of the rail track spatial coordinates and geometrical parameters and device for its implementation // 2628541
FIELD: transportation.SUBSTANCE: device, implementing the method of determining the spatial coordinates and geometric parameters of the rail track contains the track measuring truck, including the movable and fixed wheel pairs, interconnected between each other by the support frame, installed perpendicular to the direction of travel. The first and the second satellite antennas are installed above the corresponding rail threads in the terminal parts of the mentioned support frame. The phase centers of the antennas lie on the same line in the plane perpendicular to the direction of the track measuring truck, the indicated satellite antennas is being associated respectively with the first and the second inputs of the satellite receiver, which input-output is connected to the modem receiving the signals from the base satellite station, and the output of the indicated satellite receiver is connected to the on-board computer.EFFECT: simplification of the device design.4 cl; 3 dwg
ethod of earthen cement concrete diaphragm plate control in ground dam // 2628447
FIELD: construction.SUBSTANCE: method of earthen cement concrete diaphragm 3 plate control in a ground dam 2 includes the fiber optic temperature sensor 5 laying along the entire area of the earthen cement concrete diaphragm 3 from the side of the tail pond 4 and its connection to the reading fiber optic transceiver determining the fault location and the leakage amount through the earthen cement-concrete diaphragm 3. To do this, waterproof shelves 1 of dawk are poured in steps of 1.0-3.0 m and slope i towards the lower dam 4 in the process of erecting a ground dam 2 along its height in the zone of the subsequent creation of a earthen cement concrete diaphragm 3 for directing the flow of water towards the location of a fiber optic temperature sensor 5 layed along the edges of the waterproof shelves 1. The width of the waterproof shelf 1 is taken to be at least 2.5 to 3 times of the width of the earthen cement concrete diaphragm 3 to prevent damage to the fiber optic temperature sensor 5 during subsequent drilling operations to create a earthen cement concrete diaphragm 3.EFFECT: location of damages in the earthen cement concrete diaphragm of the ground dam correct to 1m, quantitative assessment of the water filtration volume through damages, reduction in the time and costs of their detection and elimination.2 cl, 3 dwg

Snow-melting machine // 2628443
FIELD: construction.SUBSTANCE: snow-melting machine comprises a bath with a grate in the upper part for receiving and melting the snow mass and a meltwater drain hole, burners, gas cylinders with a pressure regulator, a gas pipe and an igniter. The gas burners with the electric igniter are mounted under the bath bottom. The bath bottom is made in the form of a profiled sheet with corrugation waves of the sinusoidal form, the projections and recesses of which are perpendicular to the longitudinal bath axis. The bottom has an incline to the right or to the left downwards in the vertical plane towards the bath sidewall reaching said projections of the bottom. Under the bath bottom, below the gas burners, there is a chamber for meltwater with a drain hole.EFFECT: simplifying the design, reducing the installation cost and the operating costs, increasing the machine productivity.1 dwg

ethod of water well regeneration // 2628428
FIELD: mining.SUBSTANCE: sealing of well with pneumatic plug at static level depth after which the mechanical colmatant is destroyed by pumping the water well. Subsequent washing of the well sump is carried out with an ejector pump, which is a hydroelevator with a washing device. The washing flow corresponds to designed well flow rate. After the pneumatic plug is installed, carbon monoxide CO gas is fed into the wellbore. The gas is supplied at the level of the well sump.EFFECT: reduction of water de-oxygenation duration in the wellbore and the near-filter wellbore.1 dwg

ethod for balancing loads in bit with polycrystalline diamond equipment // 2628363
FIELD: construction.SUBSTANCE: according to method for balancing loads in a bit with polycrystalline diamond equipment having blades with PDC teeth fixed thereon and additional support elements for limiting the cutting depth, during the design process, the support elements are arranged on the blades in such a way that the maximum distance from the support elements to the bit axis Lmax satisfies the inequality Lmax<0.4⋅R, where R is the bit radius.EFFECT: reduced energy consumption of drilling and increased durability of the bit equipment.2 dwg

Cutting structures for a drill bit with fixed cutting tools // 2628359
FIELD: mining.SUBSTANCE: cutting tool comprises a tool body, a plurality of blades extending from the tool body, and a plurality of non-planar cutting elements on each of the plurality of blades. A plurality of non-planar cutting elements forms a cutting profile in the rotated form of said plurality of non-planar cutting elements in one plane. The cutting profile comprises a conical portion, a protruding portion, a shoulder portion and a calibration portion. Mentioned plurality of non-planar cutting elements comprise a first mould at least on a conical portion but not on a shoulder portion or a calibration portion and a second having an excellent shape on at least one of the protruding portion, the shoulder portion and the calibration portion but not on the conical portion site.EFFECT: ensuring an effective penetration rate and an acceptable bit life.19 cl, 22 dwg

ethod of structure movement // 2628357
FIELD: construction.SUBSTANCE: method of movement includes separating the structure from the foundation, lifting it to a predetermined height, preparing base elements under the lower part of the structure, installing at least two guides on the base elements, and laying rolling elements thereon. The guides are made in the form of wooden beams placed in a direction that coincides with the structure movement direction. As rolling elements, long-length metal pipes are chosen. They are placed at a distance from each other in the transverse direction or at an angle to the movement direction with the projection of their ends beyond the width or length of the lower part of the structure.EFFECT: reduced labour costs when moving buildings.9 cl, 5 dwg

Sealing in form of central protuberance for pipe connection // 2628356
FIELD: oil and gas industry.SUBSTANCE: metal-to-metal sealing system, connecting the first and the second pipe elements contains the first sealing configuration, disposed on the first pipe element and the second sealing configuration, disposed on the second pipe element. The first sealing configuration contains the first ring recess and the first ring tooth and the second sealing configuration contains the second ring recess and the second ring tooth. The second ring tooth is located within the first ring recess. The surface of the second ring tooth cooperates with the adjacent first ring protuberance surface, so as to define the first protuberance. The first ring tooth is located within the second ring recess. The surface of the first ring tooth cooperates with the adjacent second ring protuberance surface so as to define the second protuberance. The sections of the first sealing contact of the surfaces elements are axially spaced from the first and the second protuberances.EFFECT: effective sealing and problems preventing in the area of high loads of the deformable central protuberance in the pipe elements joints.23 cl, 5 dwg
ethod for arranging anti-erosion water-saving pipeless closed drainage on catena in moraine soils // 2628354
FIELD: agriculture.SUBSTANCE: method for arranging an erosion-free water-saving pipeless closed drainage on the catena in moraine soils with binary deposits includes plowing the soil in paddocks across the slope to form back ridges and open furrows - furrows with bridges that trap the surface water runoff. Wherein upwards on a straight slope having an inclination of at least 15 ‰ and not more than 50 ‰, the width of each previous paddock Bi is less than the width of each subsequent one Bi+1. Before plowing the soil on the catena, the tree and shrub vegetation is removed, with cutting and removing scrub trunks, while leaving natural field- or garden protective forest belts with the subsequent marking of the placement of the open furrows between them. Thereinafter, along the planned lines of the open furrows perpendicular to the straight slope, ditches are laid with a depth not less than the calculated p-percentage probability of exceeding the soil freezing depth at the place of their laying, followed by laying in each ditch along its perimeter a tape of a fiberglass material of at least b = 2L+s, where L is the ditch slope length, and s - the ditch width along the bottom, in which fascines built of trees and shrubs and laid in the ditch on the fiberglass tape by 1/3…1/2 of its height are wrapped. Then the ditches are gathered with a full turn of the furrow slice, covering the fascines wrapped in the tape of a fiberglass material with sod, and the final plowing-in of each ditch with water-permeable soil of the binary deposits with its compacting by a caterpillar or the wheels of the used tractor is carried out. The laying of the ditches is carried out, for example, by means of a plow ditcher with broom cleaners. For laying in the ditch and wrapping the fascines, a tape of a fiberglass material of grade BB-AM according to TU 21-23-131-80 is used.EFFECT: ensuring the preservation and the expanded reproduction of soil fertility and the high efficiency of agricultural crops cultivated on a catena.3 cl

Prefabricated module for building // 2628352
FIELD: construction.SUBSTANCE: prefabricated module has a side made with the possibility to be connected to a plurality of panels and slabs for forming a part of the building comprises: four walls extending between the floor slab and the roof slab to form a rectangular cubic form; a compartment (10) in said rectangular cubic form; internal equipment, at least part of which is connected to technical means located inside the cubic form. A wet area is created in said module. Said module is made in the form of a load-bearing structure having said four walls equipped with the flat wooden core comprising at least one insulating layer. Said wet area is made in said module by means of providing watertight layers on the inner sides of the walls and the floor slab of the compartment (10). Said flat wooden core also comprises cross-laminated multilayer wood disposed adjacent to said at least one insulating layer.EFFECT: invention allows to reduce the building erection time and to provide a wide range of its use.14 cl, 51 dwg
ethod for consolidation of ground base of hydrotechnical structure // 2628348
FIELD: construction.SUBSTANCE: primary application area of the invention is the consolidation acceleration of the ground base of the hydraulic structure of the gravity and pile-gravity types installed on the seabed in shallow shelf regions in difficult natural conditions, where, as a rule, the ground base is composed of cohesive soils. The method of consolidation of the ground base of the hydraulic structure installed on the seabed provides for the structure immersion by accepting ballast by the structure and setting the structure base onto the seabed. Wherein on the seabed, outside the structure setting area, the wellpoints are placed at some distance from the structure foundation along its perimeter, connected to a single hydraulic system in which underpressure is created and maintained by a vacuum pump. The structure is immersed by ballasting the platform housing, up to ensuring the calculated contact of the foundation bottom of the platform housing with the seabed while simultaneously pressing the base of the electrodes into the ground. After that, the wellpoints are connected to the negative pole of the direct current source, and the electrodes are connected to the positive pole of the direct current source, and the electric current is passed to ensure the formation of the low ground water saturation area in the interaction area of the foundation with the ground base, ensuring the consolidation of the platform ground base, after which the electric current is switched off.EFFECT: reducing material consumption and labour intensity while creating a hydraulic structure, reducing the ballast volume for ensuring specified stability of the hydraulic structure due to reducing the pore pressure in the ground, formed during the installation of the structure on the seabed, and increasing the stability and carrying capacity of the ground base of the hydraulic structure.2 cl, 3 dwg

Gypsum products with high-efficient heat-absorbing additives // 2628347
FIELD: construction.SUBSTANCE: gypsum article comprises a cured gypsum core layer, at least partially covered with at least one facing sheet, at least one of the liner sheets comprising paper and aluminium trihydrate, the paper being obtained from at least a pulp and aluminium trihydrate, and wherein the aluminium trihydrate is present in an amount of from about 5% to about 40 wt % relative to the pulp in a dry state.EFFECT: increasing the stability of gypsum products to high temperatures.9 cl, 12 dwg, 4 tbl

Floor panel for forming floor boarding, floor boarding formed from such floor panels, and method for manufacturing such floor panels // 2628345
FIELD: construction.SUBSTANCE: floor panel consists of a synthetic material and has the decorative upper side. On at least one pair of opposite edges, the panel comprises connecting parts which allow the two panels to be connected to each other. The connecting parts perform locking in the first direction perpendicular to the plane of the floor panels, and also in the second direction perpendicular to the corresponding edge and in the plane of the floor panels. At least one of the connecting parts comprises a separate locking element which, in the connected state, provides locking in at least the first direction.EFFECT: increasing the operational reliability of the floor.22 cl, 19 dwg

ethod for producing formations with hard to recover hydrocarbon reserves // 2628343
FIELD: oil and gas industry.SUBSTANCE: according to the method the length of the won formation areas between the pairs of wellholes and the formation of technological lines of the formation parameter functions and fluids is predetermined byinclinometry data. Hydraulic fracturing of the formation is carried out between the pairs of wellholes forming the direct and crossing output channels. Gamma- and neutron logging are carried out while studying the well perforation zones. Continuous research of fractured areas under nominal and maximum operating pressures when pumping batches of marks is performed. The number of well plugging points in static characteristic function of the generating channels parameters is determined. The research of factures is finished and interfracture areas are plugged in the range of pressures between the pressures of hydraulic fracturing and operation before the second output channel occurs. Redefined research mode is installed. The number of well plugging points in dynamic characteristic function of output channels is specified and the underlying flows considering front coordinates of the formation water cut are described. Preliminary studies are carried out, when the movement of fluids to the front of the water cut in the tenth part of the output channel length can be described by Boussinesq approximation, and after him - by Dupuis-Forchheimer correlation. Similarly, research refinement is carried out when Poiseuille expression is used in the middle of the length of the output channel before the water cut. Research refinement mode is installed using the analytical expression of Dupuis-Forchheimer. Wherein, delivery of the marks and plugging materials express the dependence of Poiseuille to complete formation output. Interfracture areas are plugged due to permanence of output channels cross-section profiles. During high-viscosity fluids, delivery of marks and plugging materials with solvents in the interfracture intervals is confirmed by increased oil content in the output well. Poisson's ratio is used to describe the motion of fluids. Oil extraction starts from the crossing seam output channels.EFFECT: intensification of production and increasing coefficient of the production extraction from formation due to increasing the fromation coverage by filtration.5 cl, 2 tbl, 5 dwg

ethod for complex hydrogen thermo-barochemical processing of production formation // 2628342
FIELD: oil and gas industry.SUBSTANCE: method of complex hydrogen thermo-barochemical treatment of the bottomhole zone of a production formation includes separate and sequential delivery to the bottomhole through the tubing of hydro-reactive compositions based on aluminium hydride sodium composite and combustible-oxidizing compositions based on complex salts. The injection of the first mixture of combustible-oxidizing and hydro-reactive compounds with a density of 1.35-1.4 g/cm3 with filling of production string volume from bottomhole to lower perforations level. On top of the first mixture an aggregate-stable nanosuspension of hydro-reactive composition of density 1.23-1.25 g/cm3 with a content of 5-50% of the dispersed phase of aluminium hydride sodium composite in the dispersion medium of diesel fuel and organic solvent with quantitative content of the liquid phase components taken in proportional ratio providing the equality of the densities of the liquid and solid phases of nanosuspension which is injected at the predetermined value of formation porosity exceeding in the volume of the production string of the perforation zone interval followed by setting of aggregate-stable nanosuspension of hydroreactive composition directly to the bottomhole zone of the production formation. The second mixture of combustible-oxidizing and hydro-reactive compounds with a density of 1.6-1.8 g/cm3 in volume sufficient to effectively react with the first mixture of the fuel-oxidizing and hydro-reactive compounds.EFFECT: increase processing efficiency in order to increase the permeability of the bottomhole formation zone, reduce the skin factor and increase the performance of well, possibility to use it for hard-to-recover oil and gas reserves.2 cl, 3 dwg

Drainage and humidification system // 2628341
FIELD: agriculture.SUBSTANCE: drainage and humidification system includes closed drains associated with a manifold communicated with the storage pond of drain water, on the bank of which a pumping station is located, connected through a fine water filter to a system of water distribution pipelines connected to irrigation pipelines equipped with drippers-water outlets. The fine water filter represents a group of disc sprinklers installed above a filtration site comprising a waterproof corrugated base, on the surface of which a layer of filter material is placed. Along the contour of the site, a catchment groove is made, connected to a filtrate tank equipped with a pump for supplying water to the drip irrigation system. The filter material can be represented by peat mats.EFFECT: design of the drainage and humidifying system provides increasing the reliability of the drip irrigation network operation at the recycling of drainage waters on drained lands.2 cl, 2 dwg
ethod adiabatic desalination // 2628293
FIELD: chemistry.SUBSTANCE: evaporation of water is carried out by affecting the salt water with a stream of air to form a vapor-air mixture. Then, the condensation of water vapor-air mixture. Salt water is fed into the upper portion of the vertically extending porous hydrophilic membrane. The effect of the flow of air on saline water is carried out by passing air through the membrane in the transverse direction.EFFECT: increased efficiency and quality of water desalination.
Flushing system for toilet bowl // 2628275
FIELD: construction.SUBSTANCE: flushing system comprises a part (4) representing the inner housing comprising at least one side channel (11) located on both the right and the left side of the part (4) with respect to the center of the inner housing and providing a flow of water leaving the clean water channel to the toilet bowl from the left and the right directions, and at least one channel (12) in the central part, providing the water flow directly downwardly in a functional manner to the toilet bowl. The flushing system comprises at least one sealing element (5) mounted on the inner housing (4), a lid mounted on the inner housing (4). The flushing system additionally comprises a part (7) representing the outer housing, with the possibility of mounting on a sanitary ware, the inner housing (4) with the possibility of mounting in the outer housing (7), a fastening element (8) for fixing the part (7) to the sanitary ware, fixing screws (6) for securing the outer housing (7) of the flushing system to the sanitary ware by tightening the fastening element (8), at least one sealing element (9) providing the impermeability between the sanitary ware and the outer housing (7) of the flushing system. The method for flushing the toilet bowl with the above-described flushing system includes the following stages: the passage of clean water through the distribution channel for clean water, when the button on the tank is pressed, and its entering the flushing system, the water passage through the outer housing (7) of the flushing system and its entering the inner housing (4), directing the water to the channel (12) in the central part on the inner casing (4) directing the water to the channels (11), washing the toilet bowl with the water. The method of installing the flushing system on the sanitary ware includes the following stages: in case of presence of the bidet system, the installation of the part (10) connecting the bidet system to the pipe for clean water, attaching the outer housing (7) to the housing at the end of the distribution channel for clean water on the sanitary ware with a sealing-providing element (9) by tightening the fastening element (8) using the screws (6), the tight attachment of the part (4) to the outer housing (7) in the absence of the application of the bidet pipe (1), attaching the lid with no openings, into which the bidet pipe will be installed, to the housing (4), and in case of using the bidet pipe, attaching the bidet pipe (1) together with a conical gasket (2) and then the lid (3A) containing an opening, in which the bidet pipe (1) will be installed, to the housing (4), and the installation completion.EFFECT: easy installation of the flushing system, careful distribution of water, the possibility of using in toilets without rims, easy cleaning.15 cl, 12 dwg

echanical counting device for downhole tool, downhole tool with this device and fracturing method with its use // 2628114
FIELD: mining.SUBSTANCE: mechanical counting device is proposed to be installed in the downhole tool and comprises a tubular housing with a channel, the first set of projections on the tubular housing shifted radially relative to the channel of the tubular housing between the projected and radially retracted positions, the second set of projections on the tubular housing shifted radially relative to the channel of the tubular housing between the projected and radially retracted positions. The tubular housing is made with possibility to advance linearly over the tool in accordance with the object shifted on the tubular housing and consistently interacting with the first and second sets of projections. Versions of the downhole tool with this counting device are also provided and methods of operating it.EFFECT: downhole tool may be put in operation selectively.26 cl, 11 dwg

Vehicle step plate assembly // 2628003
FIELD: transportation.SUBSTANCE: in the first version, the step plate assembly for the vehicle comprises a spacer block and a step plate assembly. The spacer block is attached to the side frame of the vehicle. The step plate assembly is attached to the side frame or to the spacer block. In the second version, the step plate assembly for the vehicle comprises a spacer block comprising spaced apart left and right spacer elements attached to the frame and a step plate assembly comprising spaced left and right racks, upper and lower step plate elements. The upper element of the step plate is extended between the upper section of each of the racks. The lower element of the step plate is extended between the lower section of each of the racks. Racks contain a flange attached to the side frame or to one of the spacer elements. In the third version, the step plate assembly is attached to the frame of the caterpillar undercarriage of the vehicle. The frame of the caterpillar undercarriage is designed to selectively support a wider caterpillar and a narrower caterpillar.EFFECT: improved access to the cab of the vehicle.8 cl, 2 dwg

Control method of the hydraulic gate drive for the hydraulic gate with the electric machine, operational diagram, the hydraulic gate drive and the hydroelectric power station // 2627999
FIELD: power industry.SUBSTANCE: drive has the asynchronous machine (210), operated as the asynchronous motor/generator to control the gate. The machine (210) has the brake (230) with release the brake device. The method contains the following steps in which the emergency closing situation is detected and/or indicated, the brake (230) is released by the release the brake device in the event, when the insufficient power is indicated. The machine (210) is activated by the gravity force of the hydraulic gate shield or the roller gate. The machine (210) is operated automatically, at that the rotating field is formed. The machine (210) is operated in the generating island operating mode, in which the rotating field is generated automatically.EFFECT: creation of the method and device to control the hydraulic gate or the roller gate drive, which during the emergency shutdown provides the gate shield release passively.24 cl, 4 dwg

Rotary drive system for door movement with orientable leaves, in particular, in vehicles // 2627923
FIELD: transportation.SUBSTANCE: rotary drive system (1) defines the rotation axis (3) and comprises a stator shaft (4), an outer housing (5), an annular piston (7) of the fluid dynamics driver (8) and a tubular rotor (10) of the screw transmission (11). The rotor (10) is interlocked with the linear guide element (15) by means of one or more second rolling elements (14). Driver (8) is made as a double-acting driver. The pressure chamber (9) is divided by a piston (7) into the first pressure chamber (9A) and the second pressure chamber (9B) located on opposite sides of the piston (7). The stator shaft (4) directly defines the part of both the first and second pressure chambers (9A, 9B). The rotor (10), the linear guide element (15) and the first and second rolling elements (12, 14) are located inside the annular pressure chamber (9).EFFECT: creation of an energy efficient rotary drive system with a simplified and robust design and the possibility of using an external housing as a rotary column.12 cl, 9 dwg

Support boot for transmission and distribution of forces for a sensitive pressure basis and system of steps with such towels // 2627922
FIELD: construction.SUBSTANCE: support boot (10) for transmitting and distributing forces over the pressure sensitive substrate includes a base (12) for placement on the base and a retaining element (18) connected thereto. The retaining element (18) has a first opening (20) for the connecting piece (72) and a second opening (22) for the connecting piece (32). The first opening (20) is aligned with the third opening (24) for the connecting piece (72). The three mentioned apertures (20, 22, 24) are arranged T-shaped with respect to each other. The first and third openings (20, 24) are formed by a U-shaped concave metal sheet. The second opening (22) is formed by plates (28) extending at an angle from the ends of the arms of a U-shaped metal plate and bent into a ring. The rack system has a support boot (10) and a mounting rail that is inserted into the opening (20, 22, 24) and the removal of which from the holding element (18) is prevented by the fastening means (56).EFFECT: easy adjustment of the boot.16 cl, 8 dwg

Belt haulage // 2627918
FIELD: transportation.SUBSTANCE: process of belt haulage of loose and concentrated ladlings is carried out using a conveyor having linear and transitional guides, end and intermediate drums, electric drives, chains. Transportation of ladlings is carried out by carriages moving on wheels along a rail track located on both sides of the conveyor above the level of its driving heads, and the carriages acquire the movement by engaging their elements with the buffer pushers of the conveyor.EFFECT: method allows to take advantages of a rail transportation with a track gauge width 1520 mm and moving along it freight carriage of high capacity and lifting power in mines, diggings, sections and quarries.6 dwg

Underwater system (versions) and method for multiphase media separation // 2627871
FIELD: oil and gas industry.SUBSTANCE: underwater separation system for multiphase media containing oil, water and sand, contains an inlet manifold (204), a divider (206), separate pipelines (208, 210) of similar diameter. An adjustment chamber (214) having larger diameter than the separate pipelines (208, 210) of similar diameter is connected to the ends of the separate pipelines (208, 210). The adjusting chamber (214) includes discharge pipelines (216, 218) and is made to correct the fluid flow rate at the discharge pipeline. A sand receiver (212) is connected to the separate pipelines (208, 210), which is located below one of the separate pipelines (208, 210). Inside one of the separate pipelines (208, 210) there is a jet nozzle, connected to the lower outlet pipeline of the adjastment chamber (214). The underwater separation system also includes a control valve and a control system. The multiphase fluid is passed through separate pipelines (208, 210) downstream of the divider (206) and separated into oil and water phases. The solid particles are separated. The water flow through the outlet channel at the lower end of the adjustment chamber (214), and the oil flow through the outlet at the upper end of the adjustment chamber (214) are provided. Water is injected into the receiver (212). A cyclone is formed to remove sand inside the receiver (212) and remove the stirred-up solid particles from the receiver (212) without stopping or slowing down the steps of multiphase fluid flow and its separation.EFFECT: invention allows to adjust flows in each line, reduce power consumption, increase the productivity of underwater well, and to create compact underwater separation system.17 cl, 6 dwg

Steel concrete beam // 2627810
FIELD: construction.SUBSTANCE: steel concrete beam comprising the upper and lower belts, the wall and the concrete located in a closed loop in the upper part of the beam section, has a closed loop for the concrete location. The closed loop is formed by the upper belt and the wall consisting of two sheets bent outwards in the upper part of the beam in accordance with the diagram of normal compressive stresses in the cross sections of the beam. The upper edges of the wall sheets are spaced in the horizontal plane and form along the beam length two curves corresponding to the bending moment diagram in the beam. The upper interface points of the wall sheets are located on a vertical curve corresponding to the bending moment diagram in the beam. And the wall sheets are united by retainers of variable length, which give it the curved shape along the beam height and length.EFFECT: reducing the material consumption of the steel-concrete beam.7 dwg
Device for fixing insulation to wall // 2627809
FIELD: construction.SUBSTANCE: device for fixing the insulation to the wall consists of a fixing sleeve, on which a clamping sleeve is inserted, forming a single unit with a circular clamping plate provided with cutting teeth located along its periphery. The fixing sleeve ends with an expansion zone on one end, and with a circular plate on another end. There is an expansion element inside the fixing sleeve, preferably in the form of a screw. In this case, the expansion element has a head that is integrated into a sleeve with an external thread, in which a polygonal hole is provided. The clamping plate ends in a round flange, inside which there is an insulating cover, and the teeth of the clamping plate have lateral and front sharp edges.EFFECT: simplicity of design with universal functionality and with reliable fixing and fast installation.10 cl, 6 dwg

Device for cleaning and utilisation of flue gases of roof boiler // 2627808
FIELD: heating.SUBSTANCE: device for cleaning and utilisation of flue gases of a roof boiler includes a box, made of corrosion-resistant material, connected to the atmosphere on opposite edges through chimneys, equipped with deflectors placed on the roof of the roof boiler room, in the bottom of which there are openings connected to the chimney of the heat generator and equipped with cartridges. Perforated baskets, filled with pumice granules, are placed inside the box on the support bars and a vertical perforated partition. The pumice is made of metallurgical slag with a lime factor of M>1 and a granule diameter of 5 to 10 mm. Above the baskets there are washing branch pipes, perforated below and connected outside the box to the wash water manifold. The bottom of the box is made with a slope I to the openings. The bottoms of the cartridges are connected to an acid condensate manifold, which is also connected to a drain manifold and an adsorber filled with adsorbing agent, i.e. pumice granules of metallurgical slags, and equipped with a hydraulic gate connected to a storage tank, which is connected through a condensate pump to a feedwater pipeline of the heat generator, the adsorber wash water pipeline and the wash water manifold.EFFECT: increased reliability and efficiency of the device.4 dwg

ining tunnelling machine // 2627806
FIELD: mining engineering.SUBSTANCE: mining tunnel machine contains a movement mechanism, a frame, at least one cutting head. The cutting head comprises at least one cutting disc with a lateral cutting surface fixed to the lever. The lever is rotatable, and the cutting disc is located at an acute angle to the surface of the slaughtering.EFFECT: ensuring uniform removal of rock layers, reducing pressure on the breasts of the face due to the effect of screwing the actuator into the rock and eliminating the rotating loads on the combine when the cutting tool touches the surface of the slaughtering.4 cl, 3 dwg

Device for fixing insulation to wall // 2627805
FIELD: construction.SUBSTANCE: device for fixing the insulation to the wall consists of a fixing sleeve (1) which ends on one end with an expansion zone (2) and on the other with a circular plate (3) where an expansion element (4) is located inside the fixing sleeve (1), preferably in the form of a screw. In this case, the expansion element (4) has a head that is integrated into a sleeve (5) with an external thread, where a polygonal hole (6) is provided in the sleeve (5). The fixing sleeve (1) has a diameter with a gradual decrease, with the largest diameter (D) being on the input side. The length (L2) of the fixing sleeve (1) from the stage to the end of the fixing sleeve is not less than the length (L1) of the expansion element (4) from the point of attachment to the sleeve (5) to its end. The largest internal diameter (D) of the fixing sleeve (1) is larger than the outer diameter (D1) of the sleeve (5) rigidly attached to the expansion element (4). The length of the segment (K) with the largest internal diameter (D) of the fixing sleeve (1) is not less than the length (K1) of the sleeve (5), which is attached to form an integral joint to the expansion element (4).EFFECT: creation of a device with a simple design with functionality and with reliable fixing and fast installation.2 cl, 4 dwg

ethod for chamber mining when preparing horizons // 2627803
FIELD: mining.SUBSTANCE: method of chamber mining when preparing horizons includes division of mine field into excavation areas, development of bed access drifts, extraction of mineral resources with stope chambers in advance or retreat order, delivery of ore with self-propelled equipment, transportation of ore using a conveyor, ventilation of stope chambers using local ventilation fan. Development of horizons is performed in turns, at first the upper horizon and then the lower one. Fresh air is fed through access drifts of the lower horizon, and the outgoing airstream is removed through access drifts of the upper horizon. The sill of the conveyor drift at the lower horizon is deepened relatively to the sill of the mining drifts. The upper horizon includes one transportation drift, and on the lower one includes the conveyor, from which entering the stope chambers is performed.EFFECT: invention allows to increase effectiveness of stope mining operations and reduce labor costs when extracting mineral resourses by eliminating development of ventilation holes and inter-chamber connections as well as to increase ventilation efficiency of the working area by arranging ventilation and removal of outgoing air stream from access drifts separately from the operation areas.3 cl, 5 dwg

System and method of cutting the window // 2627801
FIELD: mining engineering.SUBSTANCE: window cutting system for use in a subterranean well includes a window milling cutter having selectively retractable and extendable blades, and a wedge deflector assembly having at least one receiving portion. The window eraser is attached to the knuckle-wedge assembly by inserting said blades into said receiving portion. When the window opening method is performed in the underground well fixation, the hole fastening is cut through a window milling cutter, retracts the milling cutter blades to expose the windows, and extends the blades in the knuckle assembly, thereby affixing the wedge-deflector assembly to the window milling cutter.EFFECT: reduction of tripping operations.22 cl, 8 dwg

Dome // 2627800
FIELD: construction.SUBSTANCE: dome consists of a wooden frame including composite meridional arched ribs made of elements docked end-to-end at an angle to each other and fastened with their upper ends to the central supporting element, and with the lower ones to the supporting element of the base, and horizontal girders connected to the meridional ribs. The docked elements of the arched ribs are connected with overlapping by the cut ends and are fastened with nagels, on the free ends of which the ends of horizontal girders are put, the central supporting element is made in the form of a disk, and the lower tier of horizontal girders is put on the nagels installed in the openings of the lower elements of the meridional arched ribs.EFFECT: increasing the dome strength.4 cl, 7 dwg
Recovery method for oil-source reservoirs by the controlled multi-stage hydraulic fracture // 2627799
FIELD: oil and gas industry.SUBSTANCE: invention can be applied in the development of oil-source reservoirs managed using a controlled multi-stage hydraulic fracturing (MHF). To isolate high permeability zones and fractures, the method comprises applying in the wells of injection of mixture of surfactants, polyacrylamide (PAA), a stapler - chromium acetate, filler and water, well subjecting to process exposure, products selection from wells. According to the invention, a low-permeability reservoir is selected with an average absolute permeability of less than 2 mD, which are used for drilling, or already drilled horizontal sidetrack wells are used. In each of such wells, the first MHF is performed, during which the fracture propagation area is recorded by means of low-frequency seismic survey. Packers separate the horizontal wellbores into sections, then the wells with conducted MHF are injected, through each horizontal wellbore section, with insulating composition with the following component ratio, wt %: SAW - 0.2-5.0, PAA - 0.005-2.5, chromium acetate - 0.01-1.0, filler - 0.5-15.0, water with a salinity of less than 1.5 g/l - the rest. After the soak period during 1-10 days and colmatation of fractures after the first HF, the second HF is conducted in the same wells by the pumped insulation compound, during which fracture propagation is also recorded by means of the low-frequency seismic survey. Upon obtaining data on fractures distribution after the first and the second MHF, a decision is made on performance in these injection wells of subsequent phases of insulating composition injection and MHF conducting. Moreover, the number of subsequent MHF is determined based on the full reservoir coverage with MHF fracture zones both in plan and in profile around each horizontal wellbore. After all MHF, the reservoir is processed by separate injection in each stage of the horizontal wellbores of the insulating composition solvent in a volume of 0.8-2.0 from the total volumes previously pumped insulating compositions to this satge of the horizontal wellbore.EFFECT: increasing of the coverage factor and oil production of the oil-source reservoirs.

ethod of pumping oil production with high gas factor // 2627797
FIELD: oil and gas industry.SUBSTANCE: lateral hole is drilled below the dynamic fluid level in the mother bore by the method. The slaughter of the mother bore is cemented and equipment is lowered into it. The shank and the deep pump are lowered into the mother bore below the lateral hole insert. They are located above the lateral hole hookup. The annular space of the well is connected to the upper part of the head tank and the flow header located at the wellhead. The lower part of the head tanks is connected to a pump, the receiving part of which is connected to the supply container for the working fluid. The pumping out of the accumulating gas from the annular space is periodically performed by means of a pump that is turned on to supply the working fluid to the delivery tank with gas in the cycle of its injection into the flow header and that is turned off to drain the working fluid from the delivery tank into the delivery tank feeding in the cycle of gas supply from the annular space.EFFECT: increased efficiency of the separated gas selection from the annular space of the well and its injection into the header.1 dwg

Bitumnious oil field development method // 2627795
FIELD: mining.SUBSTANCE: bituminous oil filed development method includes construction of production and injection wells with horizontal sections located one above the other in productive reservoir stratum, injection of water vapor into both wells to create permeable zone between horizontal sections, injection of water vapor into the upper injection well and extraction of products from the lower production well. And before commencement of construction, the filed is studied to select areas with gas caps, horizontal sections of the wells are located below the gas cap, and pressure control devices are installed in the wells during construction. Steam injection into both wells and then into the injection well is performed at a pressure not exceeding the pressure in the gas cap.EFFECT: increase in the oil recovery factor in fileds with gas caps, while reducing costs by eliminating the outbreak of heat carrier into gas caps.1 dwg, 1 ex

Coating from trihedral trusses // 2627794
FIELD: construction.SUBSTANCE: coating comprises trihedral trusses combined by a profiled flooring. Each truss includes the upper tubular belts of the pentahedral composite section and the lower belt from a single angle with the heel oriented downwards. The walls of the channels of the upper belts are oriented vertically and into the trihedral truss towards each other. The diagonal web is welded overlapped to the flanges of the belt angles.EFFECT: increasing the structure rigidity while reducing the material and labour consumption.3 dwg

ethod of installing heat stabilizers in ventilated underground of operated buildings // 2627793
FIELD: construction.SUBSTANCE: method of installing heat stabilizers in the ventilated underground of operated buildings includes drilling at least one vertical wellbore in a ventilated underground without disturbing the building floors. Installing in the wellbore the heat stabilizer having the evaporator pipe filled with a refrigerant and the condenser. The pipe is made with the possibility of bending, the radius of which does not exceed the height of the aerated underground. Wherein the depth of the heat stabilizer installation is such that the condenser is arranged above the ground level in the ventilated underground.EFFECT: simplifying the heat stabilizers mountingn procedure under an operated building, improving the maintainability of the soil cooling system and simplifying its maintenance, increasing the bearing capacity of foundation soils due to their cooling throughout the area of the ventilated underground of the operated building while reducing the amount of used heat stabilizers and freeing the adjacent territory due to arranging the cooling elements in the ventilated underground.4 cl, 3 dwg

Device and method of producing carbon-containing substances from oil sand // 2627791
FIELD: oil and gas industry.SUBSTANCE: device contains at least two separate steam circuits. The first steam circuit comprises at least one first steam generator and the steam turbine (3) connected to the first steam generator with the intermediate steam sampling. The second steam circuit comprises at least one second steam generator, in particular in the form of the first heat exchanger, the injection conduit, the product pipeline and the water treatment plant. Wherein steam is fed into oil sand via the injection pipeline. Carbon-containing substances are withdrawn from the oil sand via the product pipeline. Bitumen is separated from water in the water treatment plant. Wherein the intermediate steam sampling from the first steam circuit is in kinematic connection with the first heat exchanger of the second steam circuit.EFFECT: Increasing the production efficiency of carbon-containing substances.6 cl, 1 dwg

Installation for continuous drawing of graphic images on roadway // 2627790
FIELD: transportation.SUBSTANCE: installation for the continuous drawing of graphic images on the roadway contains a frame (1) with the equipment installed on it and elements of the automatic process control system, including a control cabinet (7), loaded with graphic image files for drawing on the roadway, the first stepper motor (2) for controlling the movement of the frame (1), the second stepper motor (6) for controlling the movement of the carriage (4) with the nozzle (5) fixed on it along the guides (3) fixed on the metalwork of the frame (1) and arranged in a transverse direction towards the longitudinal axis of the frame (1), a container with an ink (8), a compressor (9), a pressure gauge (10) for controlling the ink flow pressure, an electromagnetic valve (11) for ink flow control through the nozzle (5), the box with accumulator batteries (12). The installation further comprises a reserve ink tank (14), a transporting pump (13) connecting the reserve tank (14) to the container, and an automatic control intersystem controlling the filling level of the container with ink (8), comprising a level sensor (15) mounted in the container with the ink (8), a pollution degree sensor (16) of the guides (3) mounted on the movable carriage body (4), an input device connected to the sensors (17) for converting an analog signal into a digital one, a block of a programmable read-only memory (PROM) (18) connected to the input device (17), and an output device (19) for converting the digital signal to the analog one, connected to the PROM (18) and with a transporting pump (13).EFFECT: reducing the duration of the process of drawing complex images of large dimensions to the roadway, increasing the productivity and reducing an ink consumption.2 dwg

ethod and liquid for improvement of permeability of sandstone formations by chelating agent // 2627787
FIELD: oil and gas industry.SUBSTANCE: sandstone formation treatment method includes injecting into the formation a fluid containing 5-30% by weight of the total amount of glutamic liquid N,N-diacetic acid or its salt (GLDA), 0.1-2% by volume of corrosion inhibitor, 0.01-5 % by volume of surfactant and, optionally, a common solvent. The surfactant is a non-ionic or anionic surfactant and has a pH value of between 1 and 14.EFFECT: improved permeability of sandstone formations, biodegradability and high acidity without the formation of processing fluid scale.20 cl, 9 dwg, 3 tbl, 10 ex
Plastic composition for formation water inflow insulation in well and stabilizing of producing formation and method of its application // 2627786
FIELD: oil and gas industry.SUBSTANCE: method of formation water inflow insulation in the well and stabilising of the producing formation is to inject the silicon containing composition with the aqueous solution of the inorganic cross-linker and the plasticiser, while the organosilicone oil soluble or water soluble substance or silicone based substance is used as the silicone containing substance with the following component ratio, wt %: 55-89 of the organosilicone oil soluble or water soluble substance or silicone nonorganic substance, 10-40 of nonorganic crosslinker water solution, plasticiser 1-5.EFFECT: improvement of the formation water inflow insulation in the well and stabilising of producing formation with the adjustable mechanism for curing of the injected composition at low and high temperatures.4 cl, 5 tbl, 5 ex
ethod for regulating intake capacity profile of pressure well (versions) // 2627785
FIELD: oil and gas industry.SUBSTANCE: method for regulating intake capacity profile of a pressure well, including the preparation and injection of gel-forming composition into formation, comprising xanthan, chromium acetate, surfactant - SAS and water, and a process exposure for formation of gel, the intake capacity of the pressure well is predetermined. According to the first one version, with intake capacity of 150-300 m3/day before injecting the gel-forming agent, perform injection of aqueous solution rim of alkaline reagent with a concentration of 0.05-5.0 wt % of 5-10 m3 in volume, then the gel-forming composition is added, additionally comprising a bactericide-formalin or glutaraldehyde, with a content of components, wt %: xanthan - 0.2-0.4, chromium acetate - 0.02-0.04, surfactant - 0.1-0.2, bactericide - 0.05-2.0, the rest is fresh water. After that inject aqueous solution rim of alkaline reagent and a surfactant containing, wt %: alkaline reagent - 0.1-2.0, surfactant - 0.005-3.0, the rest is water with mineralization 0.15-300 g/l, at volume ratio of gel-forming composition to aqueous solution rim of alkaline reagent and surfactant, chosen depending on the intake capaity of the pressure well and equal to 1: (0.5÷3), force said rim into the formation with water with mineralization of 0.15-300 g/l in a volume of 10-15 m3 and stop the well for a technological exposure for 2 to 5 days. According to the second version, with intake capacity of 300-500 m3/day before injecting the gel-forming agent, an aqueous solution rim of an alkaline reagent with a concentration of 0.05-5.0 wt % of 10-20 m3 in volume, inject a gel-forming composition, additionally comprising a bactericide-formalin or glutaraldehyde, with a content of components, wt %: xanthan - 0.3-1.0, chromate acetate - 0.03-0.1, surfactant - 0.15-2.0, bactericide - 0.05-2.0, the rest is fresh water. After that inject aqueous solution rim of alkaline reagent and surfactant at their content, wt %: alkaline reagent - 0.1-2.0, surfactant - 0.005-3.0, the rest is water with mineralization 0.15-300 g/l, at the volume ratio of gel-forming composition to said rim, chosen depending on the intake capacity of the pressure well and equal to 1:(2÷4), force said rim into the formation with water with mineralization of 0.15-300 g/l in a volume of 10-15 m3 and stop the well for a technological exposure for 2 to 5 days. According to the third version, with intake capacity of 500-600 m3/day preliminary inject 50-100m of a dispersion composition rim into the formation, then an aqueous solution rim of alkaline reagent with concentration of 0.05-5.0 wt % of 20-30 m3 in volume, after that inject gel-forming composition, additionally comprising a bactericide-formalin or glutaraldehyde and a polymer, with a content of components, wt %: xanthan - 0.5-2.0, chromate acetate - 0.05-0.2, surfactant - 0.5-4.0, bactericide - 0.05-2.0, polymer - 0.1-1.0, the rest is fresh water. After injecting the gel-forming agent, perform injection of aqueous solution rim of alkaline reagent and surfactant at their content, wt %: alkaline reagent - 0.1-2.0, surfactant - 0.005-3.0, the rest is water with mineralization of 0.15-300 g/l, at the volume ratio of gel-forming composition to said rim, chosen depending on the on the intake capacity of the pressure well and equal to 1:3, force said rim into the formation with water with mineralization of 0.15-300 g/l in volume of 10-15 m3 and stop the well for a technological exposure for 4 to 12 days. Use sodium hydroxide or trisodium phosphate, or sodium liquid glass as alkaline reagent, a dispersed composition rim as aqueous dispersion of the filler with a concentration of 0.01-10.0 wt % or an aqueous dispersion of the filler and polymer with a component ratio, wt %: filler - 0.01-10, polymer - 0.005-1.0, the rest is water with mineralization 0.15-300 g/l, dolomite or wood flour, or bentonite clay powder used as a filler, as polymer - polyacrylamide or sodium carboxymethylcellulose, or hydroxyethylcellulose, said oxyethylated alkylphenols used as surfactant.EFFECT: increased formation recovery, increased efficiency of formation coverage with impact and expansion of technological capabilities of the method.3 cl, 4 tbl

Arrangement of connecting pipe nozzle // 2627783
FIELD: construction.SUBSTANCE: projecting inner tubular part is formed in the connecting pipe nozzle arrangement, which forms the installation chamber inside the screw connecting part of the nozzle body. The lock nut is in threaded connection with the coupling ring, which is pre-installed inside the screw connection part. A screw part is formed on the outer periphery of the coupling ring, so that threaded connection between the coupling ring and the lock nut inside it is provided. A slope is formed on the outer side of the coupling ring, so that this slope is connected to the slope formed inside the lock nut.EFFECT: simple and efficient assembly of the nozzle bodies without the need to disassemble the lock nut in the process of locksmith works.5 cl, 10 dwg

Downhole electrical connector // 2627782
FIELD: mining.SUBSTANCE: proposed the electrical connector unit, installed in the borehole and containing: the upper longitudinal element with the electrical conductor, the lower longitudinal element, containing the electrical conductor, the telescopic electrically conductive unit and the electrical contact element, disposed around the end part of the lower longitudinal element electrical conductor and configured with ability of mobile contact to it. In this case, the telescopic electrically conductive unit contains the longitudinal receiving part at the end part of the upper longitudinal element electrical conductor. The longitudinal receiving part is located around the end part of the electrical conductor of the lower longitudinal element. The indicated contact element is configured with ability of mobile contact to the inner surface of the longitudinal receiving part of the upper longitudinal member.EFFECT: provision of electricity or signals reliable transmission with possible changes of the cable length.12 cl 9 dwg

Insert impact device for core sampling // 2627781
FIELD: mining engineering.SUBSTANCE: core sampling device comprises a rotating tubular body, a core bit fixed for rotation with the body and axially movable relative to the rotating tubular body, a retrievable core assembly, configured to be fixed to the rotating tubular body or relative thereof. The retrievable core sampling assembly comprises a stem of the core grabber for the core, made separate from the tubular body to avoid rotation with it and working in conjunction with the core bit for holding the core and a percussion device to provide impact on the core bit according to the longitudinal impact transmission system, disconnected or substantially disconnected from core grabber stem. The pipe body is made with bit rotation function. The impact device is designed with the capability to apply impacts on the bit to retrieve and deliver core material from the formation to the core grabber stem in core stem insulation mode to guard from rotational and impact forces.EFFECT: accelerated sampling of high-quality core samples.10 cl, 4 dwg

Decomposable and adjustable metallic packing and its production technique // 2627779
FIELD: mining engineering.SUBSTANCE: packing comprises a plymetal. A plymetal comprises a cellular nanomatrix which has a metalliferous material of a nanomatrix, a metallic matrix that is housed within the cellular nanomatrix, and a degradative agent housed within the metallic matrix. A degradative agent comprises: cobalt, copper, ferrum, nickel, wolframium or the combination that includes at least one of the above-mentioned. A packing comprises the first packing surface and the second packing surface that is placed oppositely to the first packing surface. A metalliferous material of a nanomatrix, a metallic matrix and a degradative agent are selected in such a way that the packing is designed to form a metal-to-metal seal in return for contractive force application. A packing can be made by dint of the metallic matrix, degradative agent and metalliferous material of a nanomatrix powder combination with the composition formation; of the consolidation of the composition with compacted composition formation; of the compacted composition agglomeration; and of the compression moulding of the sintered composition with the packing formation.EFFECT: exclusion of the elements or tools removal from the borehole.24 cl, 18 dwg

Downhole tools for determining the side branches // 2627778
FIELD: mining.SUBSTANCE: downhole tool is proposed for determining the side branches in the borehole wall or in the borehole casing string, containing: the tool body configured to be lowered into the borehole and the plurality of acoustic transponders. Each acoustic transponder is designed to transmit the acoustic signals from the housing and receive the acoustic signals, reflected from the wall of the borehole or the borehole casing string in the predetermined angular segment, different from the predetermined angular segments, corresponding to the other acoustic transponders from the plurality of acoustic transponders. The plurality of acoustic transponders is disposed along the tool body periphery at the distance from each other and are configured to transmit acoustic signals in the radial direction from the tool body along the whole central angle of 360 degrees to the borehole wall or to the borehole casing string. At that during using, only the part from the acoustic transponders plurality within the impulse time transmits the acoustic signal in the predetermined angular segments of one or more transmitting acoustic transponders, wherein at least one acoustic transponder from the plurality of acoustic transponders receives for the subsequent predetermined duration of the echo time, the acoustic signal from the borehole wall or the borehole casing string. In this case, the absence of the received reflected acoustic signal during the subsequent predetermined duration of the echo-time indicates the presence of the lateral branch.EFFECT: increase of the measurements reliability by increasing the device resolution.22 cl, 10 dwg

Pump rod // 2627777
FIELD: oil and gas industry.SUBSTANCE: pump rod consists of a fiberglass stem with conical surface and a tip consisting of a body with conical surface and clamping elements (sliding blocks) installed between the cone-shaped surfaces of the fiberglass stem and the body. A connecting portion with a thread is made in the tip body.EFFECT: increased reliability of the fiberglass stem and tip connection, increased strength of the pumping rod.6 cl, 2 dwg

ethod for aquatic gas-hydrate deposit development // 2627776
FIELD: oil and gas industry.SUBSTANCE: in the process of aquatic gas-hydrate deposit development, the gas accumulates and undergoes primary treatment on a platform (or on a ship) equipped with a tubing pipe, a pipeline with special tanks for distribution and supply of water, a water preparation unit, measuring devices for monitoring the supply of water and the particles destroying the deposit, a collection bell, a pipeline for selecting the formed gas mixture, instruments for monitoring the pumping-out system of the formed product (gas mixture), then it is transported to the methane offshore catch basin. Spherical nanoparticles are used as a working tool that destroys gas hydrates.EFFECT: increased efficiency of aqual gas hydrates extraction.1 dwg
 
2551389.